PEDESTAL COLLISION CONCERNS. Issue 1: During a site visit that took place in May 2007, the Shurepower Team encountered a situation where a pedestal had been involved in a collision with a trailer. Upon arriving to the site, the pedestals were inspected and pedestal 2 was found to be pushed away from the I-Beam mount, which appeared to be the result of a collision with a trailer. The two mounting brackets were severely bent and the pedestal was slightly separated from the I-Beam as shown in Figures 5-8 and 5-9. The pedestal box itself did not appear to be damaged though and after further inspection it was determined that the components of the pedestal were still in-tact and operating safely and correctly, despite the collision. Figure 5-8. Top View of Pedestal 2 after Figure 5-9. Side View of Pedestal 2 after Collision with Trailer Collision with Trailer Resolution 1: In order to alleviate this problem and due to the fact that the internal components of the pedestal were still intact, it was only necessary to replace the mounting brackets in order to properly re­ mount the pedestal. A possible means to prevent future collisions from occurring was also investigated and it was determined that in order to protect parking area pedestals; either bollards or wheel stops should be installed to stop a trailer from colliding with a pedestal. Due to this investigation, it was also determined that in order to protect future dock-side pedestals, either bollards or bumpers should be installed. Both of these recommendations will be taken into account in future system installations.
AutoNDA by SimpleDocs

Related to PEDESTAL COLLISION CONCERNS

  • Name Collision Occurrence Management 6.1. No-­‐Activation Period. Registry Operator shall not activate any names in the DNS zone for the Registry TLD (except for "NIC") until at least 120 calendar days after the effective date of this agreement. Registry Operator may allocate names (subject to subsection 6.2 below) during this period only if Registry Operator causes registrants to be clearly informed of the inability to activate names until the No-­‐Activation Period ends.

  • Physical Collocation (a) If space for Physical Collocation is immediately available at the time of CLEC's request, SBC-AMERITECH shall include in its notice to CLEC: (i) the space to be provided, and (ii) whether SBC- AMERITECH can deliver the space to CLEC by the date set forth in Section 12.15.2(d).

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where InterGlobe has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to InterGlobe. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for InterGlobe (e.g. hairpinning):

  • ENVIRONMENTAL CONCERNS In the worse case scenario, many environmental concerns must be addressed. Along with the police and fire marshal, the state environmental protection department will be on site to monitor the situation. Items to be concerned with in a large central office building could include:

  • Integrated Digital Loop Carriers The feeder portion of some loops may be provide by means of Integrated Digital Loop Carrier (IDLC). IDLC provides a fiber optic cable transmission path that travels directly into BellSouth’s central office local switch. Where BellSouth uses IDLC ,if technically feasible and capacity does exist, BST will provide Al-Call with a Designed DS0 UVL by using alternative provisioning techniques including but not limited to such as “hairpinning” and DAC grooming. Alternative provisioning techniques will be provided at no additional cost to Al-Call . Hairpinning involves providing a DS0 signal from an IDLC-served loop to Al-Call ’s collocation equipment by using a dedicated pathway that traverses BellSouth’s central office switch. BellSouth will provide such DS0 signal to Al-Call by establishing a copper cross connect between the BellSouth switch and Al-Call ’s collocation equipment.

  • Casual Loading (e) Superannuation contributions are to be made for periods when Employees are on:

  • Staffing Concerns Nurses, individually or as a group, believing there is an immediate workload/staffing problem should bring that problem to the attention of the supervisor or Nurse Manager as soon as the problem is identified. Nurses believing there is a continuous or potential workload/staffing problem, which may include the ability to receive rest periods and lunch breaks, should attempt to resolve the problem in discussions at the work unit level. Continuous or potential workload/staffing problems discussed at the work unit level that have not been resolved may be raised through the Joint Conference Committee. The Joint Conference Committee may determine that a unit- based work team would best address the workload/staffing problem raised. If the Joint Conference Committee makes that determination, a sub-committee consisting of an appropriate number of staff nurses who are from the unit and shift(s) experiencing the workload/staffing problem (appropriate number of staff nurses to be determined by the Joint Conference Committee), a WSNA representative and appropriate management staff will meet to discuss the problem raised. The sub-committee(s) shall report its results back to the Joint Conference Committee.

  • Name Collision Report Handling 6.3.1 During the first two years after delegation of the TLD, Registry Operator’s emergency operations department shall be available to receive reports, relayed by ICANN, alleging demonstrably severe harm from collisions with overlapping use of the names outside of the authoritative DNS.

  • Name Collision Occurrence Assessment 6.2.1 Registry Operator shall not activate any names in the DNS zone for the Registry TLD except in compliance with a Name Collision Occurrence Assessment provided by ICANN regarding the Registry TLD. Registry Operator will either (A) implement the mitigation measures described in its Name Collision Occurrence Assessment before activating any second-­‐level domain name, or (B) block those second-­‐level domain names for which the mitigation measures as described in the Name Collision Occurrence Assessment have not been implemented and proceed with activating names that are not listed in the Assessment.

  • Safe Equipment The City shall furnish and maintain in the best possible working condition, within the limits of its financial capability, the necessary tools, facilities, vehicles, supplies, and equipment required for members to safely carry out their duties. Members are responsible for reporting unsafe conditions or practices, for avoiding negligence, and for properly using and caring for tools, facilities, vehicles, supplies, and equipment provided by the City.

Time is Money Join Law Insider Premium to draft better contracts faster.