Common use of Performance of Work by City Clause in Contracts

Performance of Work by City. If the Contractor fails to perform the Work in accordance with the schedule referred to in section 2 above, the City may, in its discretion, in order to bring the project closer to the schedule, perform or cause to be performed some or all of the Work, and doing so shall not waive any of the City’s rights and remedies. Before doing so, the City shall give the Contractor notice of its intention. The Contractor shall reimburse the City for additional costs incurred by the City in exercising its right to perform or cause to be performed some or all of the Work pursuant to this section.

Appears in 30 contracts

Samples: Contract for Third Party Administrator Services, Contract for Aiken Avenue Stream Realignment, Employment Agreement

AutoNDA by SimpleDocs

Performance of Work by City. If the Contractor fails to perform the Work in accordance with the schedule referred to in section 2 aboverequired by this contract, the City may, in its discretion, in order to bring the project closer to the schedule, perform or cause to be performed some or all of the Work, and doing so shall not waive any of the City’s rights and remedies. Before doing so, the City shall give the Contractor notice of its intention. The Contractor shall reimburse the City for additional costs incurred by the City in exercising its right to perform or cause to be performed some or all of the Work pursuant to this section.

Appears in 22 contracts

Samples: Contract for Security Services, Professional Services Contract, Engineering Design Services Contract

Performance of Work by City. If the Contractor fails to perform the Work in accordance with the schedule referred to in section 2 two above, the City may, in its discretion, in order to bring the project closer to the schedule, perform or cause to be performed some or all of the Work, and doing so shall not waive any of the City’s rights and remedies. Before doing so, the City shall give the Contractor notice of its intention. The Contractor shall reimburse the City for additional costs incurred by the City in exercising its right to perform or cause to be performed some or all of the Work pursuant to this section.

Appears in 12 contracts

Samples: Consulting Agreement, Consulting Agreement, Consulting Agreement

Performance of Work by City. If the Contractor fails to perform the Work in accordance with the schedule referred to in section Section 2 above, the City may, in its discretion, in order to bring the project closer to the schedule, perform or cause to be performed some or all of the Work, and doing so shall not waive any of the City’s rights and remedies. Before doing so, the City shall give the Contractor notice of its intention. The Contractor shall reimburse the City for additional costs incurred by the City in exercising its right to perform or cause to be performed some or all of the Work pursuant to this section.

Appears in 11 contracts

Samples: Generator Maintenance and Emergency Repair Services Agreement, Generator Maintenance and Emergency Repair Services Agreement, Contract for Regional Interconnections Study

Performance of Work by City. If the Contractor fails to perform the Work in accordance with the schedule referred to in section 2 Section 3 above, the City may, in its discretion, in order to bring the project closer to the schedule, perform or cause to be performed some or all of the Work, and doing so shall not waive any of the City’s rights and remedies. Before doing so, the City shall give the Contractor notice of its intention. The Contractor shall reimburse the City for additional costs incurred by the City in exercising its right to perform or cause to be performed some or all of the Work pursuant to this section.

Appears in 7 contracts

Samples: Contract for Algal Turf Scrubber Mobile Pilot Installation and Operation, Contract for Feasibility Study, Contract for Feasibility Study and Pilot Study Design

Performance of Work by City. If the Contractor fails to perform the Work in accordance with the schedule referred to in section 2 aboverequired by this contract, the City may, in its discretion, in order to bring the project closer to the schedule, perform or cause to be performed some or all of the Work, and doing so shall not waive any of the City’s rights and remedies. Before doing so, the City shall give the Contractor notice of its intention. The Contractor shall reimburse the City for additional costs incurred by the City in exercising its right to perform or cause to be performed some or all of the Work pursuant to this section.. [

Appears in 5 contracts

Samples: Contract for Debris Monitoring, Contract for Debris Monitoring, Debris Management Contract

Performance of Work by City. If the Contractor fails to perform the Work in accordance with the schedule referred to in section 2 above, the The City may, in its discretion, in order to address performance issues or bring the project closer to the schedule, schedule perform or cause to be performed some or all of the Work, and doing so shall not waive any of the City’s rights and remedies. Before doing so, the City shall give the Contractor notice of its intention. The Contractor shall reimburse the City for additional costs incurred by the City in exercising its right to perform or cause to be performed some or all of the Work pursuant to this section.

Appears in 5 contracts

Samples: Contract for Facilitation and Support, Contract for Facilitation and Support, Contract for Facilitation and Support

Performance of Work by City. If the Contractor fails to perform the Work in accordance with the schedule referred to in section 2 aboveExhibit A, the City may, in its discretion, in order to bring the project closer to the schedule, perform or cause to be performed some or all of the Work, and doing so shall not waive any of the City’s rights and remedies. Before doing so, the City shall give the Contractor notice of its intention. The Contractor shall reimburse the City for reasonable additional costs incurred by the City in exercising its right to perform or cause to be performed some or all of the Work pursuant to this section.

Appears in 4 contracts

Samples: Contract for Ground Water Monitoring, Contract for Ground Water Monitoring, Contract for Ground Water Monitoring

Performance of Work by City. If the Contractor fails to perform the Work in accordance with the schedule referred to in section 2 aboveterms of this Contract, the City may, in its discretion, in order to bring the project closer to the schedule, perform or cause to be performed some or all of the Work, and doing so shall not waive any of the City’s rights and remedies. Before doing so, the City shall give the Contractor notice of its intention. The Contractor shall reimburse the City for additional costs incurred by the City in exercising its right to perform or cause to be performed some or all of the Work pursuant to this section.

Appears in 3 contracts

Samples: Contract for Booking Agent Services, Contract for Booking Agent Services, Contract for Booking Agent Services

Performance of Work by City. If the Contractor Designer fails to perform the Work in accordance with the schedule referred to in section Section 2 above, the City may, in its discretion, in order to bring the project closer to the schedule, perform or cause to be performed some or all of the Work, and doing so shall not waive any of the City’s rights and remedies. Before doing so, the City shall give the Contractor Designer notice of its intention. The Contractor Designer shall reimburse the City for additional costs incurred by the City in exercising its right to perform or cause to be performed some or all of the Work pursuant to this sectionSection.

Appears in 3 contracts

Samples: Contract for Design Services, Contract for Design Services, Design Services Agreement

Performance of Work by City. If the Contractor fails to perform the Work in accordance with the schedule referred to in section 2 aboverequired by this contract, the City may, in its discretion, in order to bring the project closer to the schedule, perform or cause to be performed some or all of the Work, and doing so shall not waive any of the City’s rights and remedies. Before doing so, the City shall give the Contractor notice of its intention. The Contractor shall reimburse the City for additional costs incurred by the City in exercising its right to perform or cause to be performed some or all of the Work pursuant to this section.

Appears in 3 contracts

Samples: Model Services Contract, Model Services Contract, Utility Easement Maintenance Contract

Performance of Work by City. If the Contractor fails to perform the Work in accordance with the schedule referred to in section _2 above, the City may, in its discretion, in order to bring the project closer to the schedule, perform or cause to be performed some or all of the Work, and doing so shall not waive any of the City’s rights and remedies. Before doing so, the City shall give the Contractor notice of its intention. The Contractor shall reimburse the City for additional costs incurred by the City in exercising its right to perform or cause to be performed some or all of the Work pursuant to this section.

Appears in 3 contracts

Samples: Contract for Elevator Repair and Maintenance, Contract for Elevator Repair and Maintenance, Custodial Services Agreement

Performance of Work by City. If the Contractor fails to perform the Work in accordance with the schedule referred to in section 2 above, Attachment A the City may, in its discretion, in order to bring the project closer to the schedule, perform or cause to be performed some or all of the Work, and doing so shall not waive any of the City’s rights and remedies. Before doing so, the City shall give the Contractor notice of its intention. The Contractor shall reimburse the City for additional costs incurred by the City in exercising its right to perform or cause to be performed some or all of the Work pursuant to this section.

Appears in 2 contracts

Samples: Contract, Contract for Education to Work Pipeline System

Performance of Work by City. If the Contractor fails to perform the Work in accordance with the schedule referred to in section 2 aboveterms of the contract, the City may, in its discretion, in order to bring the project closer to the schedule, perform or cause to be performed some or all of the Work, and doing so shall not waive any of the City’s rights and remedies. Before doing so, the City shall give the Contractor notice of its intention. The Contractor shall reimburse the City for additional costs incurred by the City in exercising its right to perform or cause to be performed some or all of the Work pursuant to this section.

Appears in 2 contracts

Samples: Contract for Pest Control Services, Contract for Pest Control Services

Performance of Work by City. If the Contractor fails to perform the Work in accordance with and to cure such failure within 5 business days after notice from the schedule referred to in section 2 aboveCity, the City may, in its discretion, in order to bring the project closer to the schedule, perform or cause to be performed some or all of the WorkWork until Contractor resumes performance thereof, and doing so shall not waive any of the City’s rights and remedies. Before doing so, the City shall give the Contractor notice of its intention. The Contractor shall reimburse the City for additional costs incurred by the City in exercising its right to perform or cause to be performed some or all of the Work pursuant to this section.

Appears in 2 contracts

Samples: Contract for Water Treatment Plant Residuals and Water Reclamation Facility Bio Solids Dewatering, Hauling, Disposal, Land Application and Associated Services, Contract for Water Treatment Plant Residuals and Water Reclamation Facility Bio Solids Dewatering, Hauling, Disposal, Land Application and Associated Services

Performance of Work by City. If the Contractor fails to perform the Work in accordance with the schedule referred to in section 2 aboverequired by this contract (see Exhibit A), the City may, in its discretion, in order to bring the project closer to the schedule, perform or cause to be performed some or all of the Work, and doing so shall not waive any of the City’s rights and remedies. Before doing so, the City shall give the Contractor notice of its intention. The Contractor shall reimburse the City for additional costs incurred by the City in exercising its right to perform or cause to be performed some or all of the Work pursuant to this section.

Appears in 2 contracts

Samples: Landscape Maintenance Agreement, Landscape Maintenance Agreement

Performance of Work by City. If the Contractor fails to perform the Work in accordance with the schedule referred to in section 2 aboverequired by this contract, the City may, in its discretion, in order to bring the project closer to the schedule, perform or cause to be performed some or all of the Work, and doing so shall not waive any of the City’s rights and remedies. Before doing so, the City shall give the Contractor notice of its intention. The Contractor shall reimburse the City for additional costs incurred by the City in exercising its right to perform or cause to be performed some or all of the Work pursuant to this section.

Appears in 2 contracts

Samples: Collection Services Agreement, Collection Services Agreement

Performance of Work by City. If the Contractor fails to perform the Work in accordance with the schedule referred to in section 2 above, the City may, in its discretion, in order to bring the project closer to the schedule, perform or cause to be performed some or all of the Work, and doing so shall not waive any of the City’s rights and remedies. Before doing so, the City shall give the Contractor notice of its intention. The Contractor shall reimburse the City for additional costs incurred by the City in exercising its right to perform or cause to be performed some or all of the Work pursuant to this section.

Appears in 2 contracts

Samples: Employee Benefits Brokerage/Consulting Agreement, Employee Benefits Brokerage/Consulting Agreement

Performance of Work by City. If the Contractor fails to perform the Work in accordance with the schedule referred to time frames stated in section 2 abovethis Contract, the City may, in its discretion, in order to bring the project closer to the schedule, perform or cause to be performed some or all of the Work, and doing so shall not waive any of the City’s rights and remedies. Before doing so, the City shall give the Contractor notice of its intention. The Contractor shall reimburse the City for additional costs incurred by the City in exercising its right to perform or cause to be performed some or all of the Work pursuant to this section.

Appears in 2 contracts

Samples: Contract for Processing and Marketing of Electronic Materials, Contract for Processing and Marketing of Electronic Materials

Performance of Work by City. If the Contractor fails to perform the Work in accordance with the schedule referred to in section 2 aboveSection 2, the City may, in its discretion, in order to bring the project closer to the schedule, perform or cause to be performed some or all of the Work, and doing so shall not waive any of the City’s rights and remedies. Before doing so, the City shall give the Contractor notice of its intention. The Contractor shall reimburse the City for additional costs incurred by the City in exercising its right to perform or cause to be performed some or all of the Work pursuant to this section.

Appears in 2 contracts

Samples: Contract for Unconscious Bias Training, Contract for Unconscious Bias Training

Performance of Work by City. If the Contractor fails to perform the Work in accordance with the schedule referred to in section 2 Exhibit A and A-1 above, the City may, in its discretion, in order to bring the project closer to the schedule, perform or cause to be performed some or all of the Work, and doing so shall not waive any of the City’s rights and remedies. Before doing so, the City shall give the Contractor notice of its intention. The Contractor shall reimburse the City for additional costs incurred by the City in exercising its right to perform or cause to be performed some or all of the Work pursuant to this section.

Appears in 2 contracts

Samples: Third Party Administration Agreement, Third Party Administration Agreement

Performance of Work by City. If the Contractor fails to perform the Work in accordance with Section 2 and 3 above and the schedule referred to in section 2 attached Exhibit 1 referenced above, the City may, in its discretion, in order to bring the project closer to the schedule, perform or cause to be performed some or all of the Work, and doing so shall not waive any of the City’s rights and remedies. Before doing so, the City shall give the Contractor notice of its intention. The Contractor shall reimburse the City for additional costs incurred by the City in exercising its right to perform or cause to be performed some or all of the Work pursuant to this section.

Appears in 2 contracts

Samples: Contract for Firefighter Employment Related Medical, Testing and Physician Services, Contract for Firefighter Employment Related Medical, Testing and Physician Services

Performance of Work by City. If the Contractor fails to perform the Work in accordance with the schedule referred to in section Section 2 above, the City may, in its discretion, in order to bring complete the project closer to the scheduleWork, perform or cause to be performed some or all of the Work, and doing so shall not waive any of the City’s rights and remedies. Before doing so, the City shall give the Contractor notice of its intention. The Contractor shall reimburse the City for additional costs incurred by the City in exercising its right to perform or cause to be performed some or all of the Work pursuant to this section.

Appears in 2 contracts

Samples: Consulting Agreement, Consulting Agreement

Performance of Work by City. If the Contractor fails to perform the Work in accordance with the schedule referred to in requirements of section 2 above, the City may, in its discretion, in order to bring the project closer to the schedule, perform or cause to be performed some or all of the Work, and doing so shall not waive any of the City’s rights and remedies. Before doing so, the City shall give the Contractor notice of its intention. The Contractor shall reimburse the City for additional costs incurred by the City in exercising its right to perform or cause to be performed some or all of the Work pursuant to this section.

Appears in 2 contracts

Samples: Contract for Installation of Traffic Signal, Contract for Installation of Traffic Signal

AutoNDA by SimpleDocs

Performance of Work by City. If the Contractor fails to perform the Work in accordance with the schedule referred to in section 2 aboverequirements of Exhibit 1 as required by this contract, the City may, in its discretion, in order to bring the project closer to the schedule, perform or cause to be performed some or all of the Work, and doing so shall not waive any of the City’s rights and remedies. Before doing so, the City shall give the Contractor notice of its intention. The Contractor shall reimburse the City for additional costs incurred by the City in exercising its right to perform or cause to be performed some or all of the Work pursuant to this section.

Appears in 2 contracts

Samples: Vegetation Management Contract, Vegetation Management Contract

Performance of Work by City. If the Contractor fails to perform the Work in accordance with the schedule referred to in section 2 Section 3 above, the City may, in its discretion, in order to bring the project closer to the schedule, perform or cause to be performed some or all of the Work, and doing so shall not waive any of the City’s rights and remedies. Before doing so, the City shall give the Contractor notice of its intention. The Contractor shall reimburse the City for additional costs incurred by the City in exercising its right to perform or cause to be performed some or all of the Work pursuant to this section.

Appears in 1 contract

Samples: Contract for Stream Restoration Project

Performance of Work by City. If the Contractor fails to perform the Work in accordance with the schedule referred to in section 2 3 above, the City may, in its discretion, in order to bring the project closer to the schedule, perform or cause to be performed some or all of the Work, and doing so shall not waive any of the City’s rights and remedies. Before doing so, the City shall give the Contractor notice of its intention. The Contractor shall reimburse the City for additional costs incurred by the City in exercising its right to perform or cause to be performed some or all of the Work pursuant to this section.

Appears in 1 contract

Samples: Design and Construction Management Services Agreement

Performance of Work by City. If the Contractor fails to perform the Work in accordance with the schedule referred to in section 2 Sec. 2. above, the City may, in its discretion, in order to bring the project closer to the schedule, perform or cause to be performed some or all of the Work, and doing so shall not waive any of the City’s rights and remedies. Before doing so, the City shall give the Contractor reasonable notice of its intention. The Contractor shall reimburse the City for additional all costs incurred by the City in exercising its right to perform or cause to be performed some or all of the Work pursuant to this section.

Appears in 1 contract

Samples: Contract Amendment

Performance of Work by City. If the Contractor fails to perform the Work in accordance with the schedule referred to in section 2 abovethis contract, the City may, in its discretion, in order to bring the project closer to the schedule, perform or cause to be performed some or all of the Work, and doing so shall not waive any of the City’s rights and remedies. Before doing so, the City shall give the Contractor notice of its intention. The Contractor shall reimburse the City for additional costs incurred by the City in exercising its right to perform or cause to be performed some or all of the Work pursuant to this section.

Appears in 1 contract

Samples: Service Contract

Performance of Work by City. If the Contractor fails to perform the Work in accordance with the schedule referred to in section 2 Exhibit 1 above, the City may, in its discretion, in order to bring the project closer to the schedule, perform or cause to be performed some or all of the Work, and doing so shall not waive any of the City’s rights and remedies. Before doing so, the City shall give the Contractor notice of its intention. The Contractor shall reimburse the City for additional costs incurred by the City in exercising its right to perform or cause to be performed some or all of the Work pursuant to this section.

Appears in 1 contract

Samples: Contract for Firefighter Employment Related Medical, Testing and Physician Services

Performance of Work by City. If the Contractor fails to perform the Work in accordance with the schedule referred to in section 2 above, the City may, in its discretion, in order to bring the project closer to the schedule, perform or cause to be performed some or all of the Work, and doing so shall not waive any of the City’s rights and remedies. Before doing so, the City shall give the Contractor notice of its intention. The Contractor shall reimburse the City for additional additional, reasonable costs incurred by the City in exercising its right to perform or cause to be performed some or all of the Work pursuant to this section.

Appears in 1 contract

Samples: Maintenance and Repair Agreement

Performance of Work by City. If the Contractor fails to perform the Work in accordance with the schedule referred to in section 2 5 above, the City may, in its discretion, in order to bring the project closer to the schedule, perform or cause to be performed some or all of the Work, and doing so shall not waive any of the City’s rights and remedies. Before doing so, the City shall give the Contractor notice of its intention. The Contractor shall reimburse the City for additional costs incurred by the City in exercising its right to perform or cause to be performed some or all of the Work pursuant to this section.

Appears in 1 contract

Samples: Contract for Mortgage Loan Servicing

Performance of Work by City. If the Contractor fails to perform the Work in accordance with the schedule referred to in section sections 1 and 2 above, the City may, in its discretion, in order to bring the project closer to the schedule, perform or cause to be performed some or all of the Work, and doing so shall not waive any of the City’s rights and remedies. Before doing so, the City shall give the Contractor notice of its intention. The Contractor shall reimburse the City for additional costs incurred by the City in exercising its right to perform or cause to be performed some or all of the Work pursuant to this section.

Appears in 1 contract

Samples: On Line Services Agreement

Performance of Work by City. If the Contractor fails to perform the Work in accordance with the schedule referred to in section 2 aboveExhibit “A”, the City may, in its discretion, in order to bring the project closer to the schedule, perform or cause to be performed some or all of the Work, and doing so shall not waive any of the City’s rights and remedies. Before doing so, the City shall give the Contractor reasonable notice of its intention. The Contractor shall reimburse the City for additional all costs incurred by the City in exercising its right to perform or cause to be performed some or all of the Work pursuant to this section.

Appears in 1 contract

Samples: Terminal Food Concession Contract

Performance of Work by City. If the Contractor fails to perform the Work in accordance with the schedule referred to in section 2 above, the City may, in its discretion, in order to bring the project closer to the scheduleschedule or Contract specifications, perform or cause to be performed some or all of the Work, and doing so shall not waive any of the City’s rights and remedies. Before doing so, the City shall give the Contractor notice of its intention. The Contractor shall reimburse the City for additional costs incurred by the City in exercising its right to perform or cause to be performed some or all of the Work pursuant to this section.

Appears in 1 contract

Samples: Contract for Stationary Container Rental

Performance of Work by City. If the Contractor fails to perform the Work in accordance with the schedule referred to in section 2 aboveabove and Exhibit A, the City may, in its discretion, in order to bring the project closer to the schedule, perform or cause to be performed some or all of the Work, and doing so shall not waive any of the City’s rights and remedies. Before doing so, the City shall give the Contractor notice of its intention. The Contractor shall reimburse the City for additional costs incurred by the City in exercising its right to perform or cause to be performed some or all of the Work pursuant to this section.

Appears in 1 contract

Samples: Service Contract

Performance of Work by City. If the Contractor fails to perform the Work in accordance with the schedule schedule, referred to in section Section 2 above, required by this contract, the City may, in its discretion, in order to bring the project closer to the schedule, perform or cause to be performed some or all of the Work, and doing so shall not waive any of the City’s rights and remedies. Before doing so, the City shall give the Contractor notice of its intention. The Contractor shall reimburse the City for additional costs incurred by the City in exercising its right to perform or cause to be performed some or all of the Work pursuant to this section.

Appears in 1 contract

Samples: Contract for Hydraulic Model Update/Water Distribution System Study and Water Audit

Performance of Work by City. If the Contractor fails to perform the Work in accordance with the schedule referred to in section 2 Section 5 above, the City may, in its discretion, in order to bring the project closer to the schedule, perform or cause to be performed some or all of the Work, and doing so shall not waive any of the City’s rights and remedies. Before doing so, the City shall give the Contractor notice of its intention. The Contractor shall reimburse the City for additional costs incurred by the City in exercising its right to perform or cause to be performed some or all of the Work pursuant to this section.

Appears in 1 contract

Samples: Contract for Booking Agent Services

Performance of Work by City. If the Contractor fails to perform the Work in accordance with the schedule referred to in section 2 aboveterms of this contract, the City may, in its discretion, in order to bring the project closer to the schedule, perform or cause to be performed some or all of the Work, and doing so shall not waive any of the City’s rights and remedies. Before doing so, the City shall give the Contractor notice of its intention. The Contractor shall reimburse the City for additional costs incurred by the City in exercising its right to perform or cause to be performed some or all of the Work pursuant to this section.

Appears in 1 contract

Samples: Elevator Repair and Maintenance Agreement

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!