PHASE 2 PARCA WORKS. 4.1 Subject to the conditions in Clause 3.1 being satisfied and the terms of this Clause 4, NGG shall undertake and subject to Clause 4.2 complete the Phase 2 PARCA Works in respect of the Reserved Capacity identified in the Phase 1 PARCA Works Report in accordance with the indicative timetable specified in the Phase 1 PARCA Works Report and in doing so NGG shall act in accordance with the standards of a Reasonable and Prudent Operator. 4.2 NGG shall keep the Reservation Party regularly informed of NGG's progress in completing each stage of the Phase 2 PARCA Works. Where NGG expects that completion of any stage of the Phase 2 PARCA Works will not take place in accordance with the indicative timetable in the Phase 1 PARCA Works Report (or such other timetable agreed with the Reservation Party) NGG shall inform the Reservation Party as soon as reasonably practicable and provide the following: 4.2.1 an explanation as to why it expects that the Phase 2 PARCA Works will not take place in accordance with the indicative timetable provided in the Phase 1 PARCA Works Report (or such other timetable agreed with the Reservation Party); and 4.2.2 a revised indicative timetable. NGG shall not be liable to the Reservation Party for any delay in completion of any stage of the Phase 2 PARCA Works. 4.3 In respect of the stages of Phase 2 PARCA Works: 4.3.1 the Reservation Party agrees to provide NGG with the Demonstration Information by the First Demonstration Date; 4.3.2 NGG shall undertake the stage(s) of the Phase 2 PARCA Works following receipt of the Demonstration Information; 4.3.3 NGG shall not be required to undertake the stage(s) of Phase 2 PARCA Works until it is in receipt of the Demonstration Information. 4.4 In the event NGG has not received the Demonstration Information in respect of any stage of the Phase 2 PARCA Works by the Third Demonstration Date (or where agreed with NGG, an Ad-Hoc Demonstration Date) NGG may terminate this Agreement. NGG will remind the Reservation Party on the Second Demonstration Date that it may terminate this Agreement in the event it has not received the Demonstration Information in respect of any stage of the Phase 2 PARCA Works by the Third Demonstration Date (or where agreed with NGG, an Ad-Hoc Demonstration Date) but any failure to remind will not preclude NGG from exercising its right of termination. 4.5 Following completion of each stage of Phase 2 PARCA Works, NGG will provide as soon as reasonably practicable to the Reservation Party a Phase 2 PARCA Works Report containing information in respect of the relevant stage of Phase 2 PARCA Works including, but not limited to, project update and project progression against the indicative timetable as set out in the Phase 1 PARCA Works Report. 4.6 Where following submission of a report(s) in accordance with Clause4.6, NGG has already received the Demonstration Information for the next stage of the Phase 2 PARCA Works NGG shall proceed to undertake such stage of the Phase 2 PARCA Works without delay. 4.7 At any time during the period between the Reservation Date and the Allocation Date NGG shall have the ability to amend the Reserved Capacity Tolerance. NGG will keep the Reservation Party regularly notified of any such changes to the Reserved Capacity Tolerance. 4.8 A Reservation Party that is not a User may change the amount of Reserved Capacity, provided always that this amount falls within the Reserved Capacity Tolerance, by giving notice to NGG. In giving such notice the Reservation Party shall take into account the timescale required for User Nomination(s) in accordance with Clause 6.1. 4.9 A Reservation Party that is a User may change the amount of Reserved Capacity, provided always that this amount falls within the Reserved Capacity Tolerance, by giving notice to NGG of not less than ten (10) days prior to the Allocation Date. 4.10 Following a notice from a Reservation Party to change the amount of Reserved Capacity in accordance with Clauses 4.8 or 4.9, NGG shall accommodate such change of amount of Reserved Capacity, provided always that this amount falls within the Reserved Capacity Tolerance.
Appears in 2 contracts
Samples: Planning and Advanced Reservation of Capacity Agreement (Parca), Planning and Advanced Reservation of Capacity Agreement (Parca)
PHASE 2 PARCA WORKS. 4.1 Subject to the conditions in Clause 3.1 being satisfied and the terms of this Clause 4, NGG shall undertake and subject to Clause 4.2 complete the Phase 2 PARCA Works in respect of the Reserved Capacity identified in the Phase 1 PARCA Works Report in accordance with the indicative timetable specified in the Phase 1 PARCA Works Report and in doing so NGG shall act in accordance with the standards of a Reasonable and Prudent Operator.
4.2 NGG shall keep the Reservation Party regularly informed of NGG's progress in completing each stage of the Phase 2 PARCA Works. Where NGG expects that completion of any stage of the Phase 2 PARCA Works will not take place in accordance with the indicative timetable in the Phase 1 PARCA Works Report (or such other timetable agreed with the Reservation Party) NGG shall inform the Reservation Party as soon as reasonably practicable and provide the following:
4.2.1 an explanation as to why it expects that the Phase 2 PARCA Works will not take place in accordance with the indicative timetable provided in the Phase 1 PARCA Works Report (or such other timetable agreed with the Reservation Party); and
4.2.2 a revised indicative timetablepracticable. NGG shall not be liable to the Reservation Party for any delay in completion of any stage of the Phase 2 PARCA Works.
3.1 Deleted: 4 Deleted: 4.2 Deleted: Schedule Deleted: and of the costs incurred by NGG in undertaking the Phase 2 PARCA Works. Deleted: Schedule Deleted: Schedule
4.3 In respect of the stages each stage of Phase 2 PARCA Works:
4.3.1 the Reservation Party agrees to provide NGG with the Relevant Demonstration Information by the First Demonstration Date;
4.3.2 NGG shall undertake the stage(s) stage of the Phase 2 PARCA Works following receipt of the Relevant Demonstration Information;
4.3.3 NGG shall not be required to undertake the stage(s) stage of Phase 2 PARCA Works until it is in receipt of the Relevant Demonstration Information.. stage of Phase 2 PARCA Works, NGG will provide as
4.4 In the event NGG has not received the Relevant Demonstration Information in respect of any stage of the Phase 2 PARCA Works by the Third Demonstration Date (or where agreed with NGG, an Ad-Hoc Demonstration Date) NGG may terminate this Agreement. NGG will endeavour to remind the Reservation Party on the Second Demonstration Date that it may terminate this Agreement in the event it has not received the Relevant Demonstration Information in respect of any stage of the Phase 2 PARCA Works by the Third Demonstration Date (or where agreed with NGG, an Ad-Ad- Hoc Demonstration Date) but any failure to remind will not preclude NGG from exercising its right of termination.
4.5 Following completion of each stage of Phase 2 PARCA Works, NGG will provide as soon as reasonably practicable to the Reservation Party a Phase 2 PARCA Works Report containing information in respect of the relevant stage of Phase 2 PARCA Works including, but not limited to, project update and project progression against the indicative timetable as set out in the Phase 1 PARCA Works Report.
4.6 Where following submission of a report(s) in accordance with Clause4.6Clause 4.5, NGG has already received the Relevant Demonstration Information for the next stage of the Phase 2 PARCA Works NGG shall proceed to undertake such stage of the Phase 2 PARCA Works without delay.
4.7 At any time during During the period between the Reservation Date and the Allocation Date NGG shall have the ability to amend the Reserved Capacity Tolerance. NGG will keep the Reservation Party regularly notified of any such changes to the Reserved Capacity Tolerance.
4.8 A Reservation Party that is not a User may change the amount of Reserved Capacity, provided always that this amount falls within the Reserved Capacity Tolerance, by giving notice to NGG. In giving such notice the Reservation Party shall take into account the timescale required for User Nomination(s) in accordance with Clause 6.1.
4.9 A Reservation Party that is a User may change the amount of Reserved Capacity, provided always that this amount falls within the Reserved Capacity Tolerance, by giving notice to NGG of not less than ten (10) days prior to the Allocation Date.
4.10 Following a notice from a Reservation Party to change the amount of Reserved Capacity in accordance with Clauses 4.8 or 4.9, NGG shall accommodate such change of amount of Reserved Capacity, provided always that this amount falls within the Reserved Capacity Tolerance.
Appears in 1 contract
Samples: Planning and Advanced Reservation of Capacity Agreement (Parca)
PHASE 2 PARCA WORKS. 4.1 Subject to the conditions in Clause 3.1 being satisfied and the terms of this Clause 4, NGG shall undertake and subject to Clause 4.2 complete the Phase 2 PARCA Works in respect of the Reserved Capacity identified in the Phase 1 PARCA Works Report in accordance with the indicative timetable specified in the Phase 1 PARCA Works Report and in doing so NGG shall act in accordance with the standards of a Reasonable and Prudent Operator.
4.2 NGG shall keep the Reservation Party regularly informed of NGG's progress in completing each stage Schedule of the Phase 2 PARCA Works and of the costs incurred by NGG in undertaking the Phase 2 PARCA Works. Where NGG expects that completion of any stage Schedule of the Phase 2 PARCA Works will not take place in accordance with the indicative timetable in the Phase 1 PARCA Works Report (or such other timetable agreed with the Reservation Party) NGG shall inform the Reservation Party as soon as reasonably practicable and provide the following:
4.2.1 an explanation as to why it expects that the Phase 2 PARCA Works will not take place in accordance with the indicative timetable provided in the Phase 1 PARCA Works Report (or such other timetable agreed with the Reservation Party); and
4.2.2 a revised indicative timetablepracticable. NGG shall not be liable to the Reservation Party for any delay in completion of any stage Schedule of the Phase 2 PARCA Works.
4.3 In respect of the stages each Schedule of Phase 2 PARCA Works:
4.3.1 the Reservation Party agrees to provide NGG with the Relevant Demonstration Information by the First Demonstration Date;
4.3.2 NGG shall undertake the stage(s) Schedule of the Phase 2 PARCA Works following receipt of the Relevant Demonstration Information;
4.3.3 NGG shall not be required to undertake the stage(s) Schedule of Phase 2 PARCA Works until it is in receipt of the Relevant Demonstration Information.
4.4 In the event NGG has not received the Relevant Demonstration Information in respect of any stage Schedule of the Phase 2 PARCA Works by the Third Demonstration Date (or where agreed with NGG, an Ad-Hoc Demonstration Date) NGG may terminate this Agreement. NGG will remind the Reservation Party on the Second Demonstration Date that it may terminate this Agreement in the event it has not received the Demonstration Information in respect of any stage of the Phase 2 PARCA Works by the Third Demonstration Date (or where agreed with NGG, an Ad-Hoc Demonstration Date) but any failure to remind will not preclude NGG from exercising its right of termination.
4.5 Following completion of each stage Schedule of Phase 2 PARCA Works, NGG will provide as soon as reasonably practicable to the Reservation Party a Phase 2 PARCA Works Report containing information in respect of the relevant stage Schedule of Phase 2 PARCA Works including, but not limited to, project update and project progression against the indicative timetable as set out in the Phase 1 PARCA Works Report.
4.6 Where following submission of a report(s) in accordance with Clause4.6Clause 4.5, NGG has already received the Relevant Demonstration Information for the next stage Schedule of the Phase 2 PARCA Works NGG shall proceed to undertake such stage Schedule of the Phase 2 PARCA Works without delay.
4.7 At any time during During the period between the Reservation Date and the Allocation Date NGG shall have the ability to amend the Reserved Capacity Tolerance. NGG will keep the Reservation Party regularly notified of any such changes to the Reserved Capacity Tolerance.
4.8 A Reservation Party that is not a User may change For the purposes of Clauses 6 and 7 references to Reserved Capacity shall be to such amount of Reserved Capacity, provided always that this amount falls within Capacity as specified in the Phase 1 PARCA Works Report and the Reserved Capacity Tolerance, Tolerance as notified from time to time by giving notice NGG to NGG. In giving such notice the Reservation Party shall take into account the timescale required for User Nomination(s) in accordance with Clause 6.1.
4.9 A Reservation Party that is a User may change the amount of Reserved Capacity, provided always that this amount falls within the Reserved Capacity Tolerance, by giving notice to NGG of not less than ten (10) days prior to the Allocation Date4.7.
4.10 Following a notice from a Reservation Party to change the amount of Reserved Capacity in accordance with Clauses 4.8 or 4.9, NGG shall accommodate such change of amount of Reserved Capacity, provided always that this amount falls within the Reserved Capacity Tolerance.
Appears in 1 contract
Samples: Planning and Advanced Reservation of Capacity Agreement (Parca)
PHASE 2 PARCA WORKS. 4.1 Subject to the conditions in Clause 3.1 being satisfied and the terms of this Clause 4, NGG shall undertake and subject to Clause 4.2 complete the Phase 2 PARCA Works in 3 Any other conditions? respect of the Reserved Capacity identified in the Phase 1 PARCA Works Report in accordance with the indicative timetable specified in the Phase 1 PARCA Works Report and in doing so NGG shall act in accordance with the standards of a Reasonable and Prudent Operator.
4.2 NGG shall keep the Reservation Party regularly informed of NGG's progress in completing each stage Schedule of the Phase 2 PARCA Works and of the costs incurred by NGG in undertaking the Phase 2 PARCA Works. Where NGG expects that completion of any stage Schedule of the Phase 2 PARCA Works will not take place in accordance with the indicative timetable in the Phase 1 PARCA Works Report (or such other timetable agreed with the Reservation Party) NGG shall inform the Reservation Party as soon as reasonably practicable and provide the following:
4.2.1 an explanation as to why it expects that the Phase 2 PARCA Works will not take place in accordance with the indicative timetable provided in the Phase 1 PARCA Works Report (or such other timetable agreed with the Reservation Party); and
4.2.2 a revised indicative timetablepracticable. NGG shall not be liable to the Reservation Party for any delay in completion of any stage Schedule of the Phase 2 PARCA Works.
4.3 In respect of the stages each Schedule of Phase 2 PARCA Works:
4.3.1 the Reservation Party agrees to provide NGG with the Relevant Demonstration Information by the First Demonstration Date;
4.3.2 NGG shall undertake the stage(s) Schedule of the Phase 2 PARCA Works following receipt of the Relevant Demonstration Information;
4.3.3 NGG shall not be required to undertake the stage(s) Schedule of Phase 2 PARCA Works until it is in receipt of the Relevant Demonstration Information.
4.4 In the event NGG has not received the Relevant Demonstration Information in respect of any stage Schedule of the Phase 2 PARCA Works by the Third Demonstration Date (or where agreed with NGG, an Ad-Hoc Demonstration Date) NGG may terminate this Agreement. NGG will remind the Reservation Party on the Second Demonstration Date that it may terminate this Agreement in the event it has not received the Demonstration Information in respect of any stage of the Phase 2 PARCA Works by the Third Demonstration Date (or where agreed with NGG, an Ad-Hoc Demonstration Date) but any failure to remind will not preclude NGG from exercising its right of termination.
4.5 Following completion of each stage Schedule of Phase 2 PARCA Works, NGG will provide as soon as reasonably practicable to the Reservation Party a Phase 2 PARCA Works Report containing information in respect of the relevant stage Schedule of Phase 2 PARCA Works including, but not limited to, project update and project progression against the indicative timetable as set out in the Phase 1 PARCA Works Report.
4.6 Where following submission of a report(s) in accordance with Clause4.6Clause 4.5, NGG has already received the Relevant Demonstration Information for the next stage Schedule of the Phase 2 PARCA Works NGG shall proceed to undertake such stage Schedule of the Phase 2 PARCA Works without delay.
4.7 At any time during During the period between the Reservation Date and the Allocation Date NGG shall have the ability to amend the Reserved Capacity Tolerance. NGG will keep the Reservation Party regularly notified of any such changes to the Reserved Capacity Tolerance.
4.8 A Reservation Party that is not a User may change For the purposes of Clauses 6 and 7 references to Reserved Capacity shall be to such amount of Reserved Capacity, provided always that this amount falls within Capacity as specified in the Phase 1 PARCA Works Report and the Reserved Capacity Tolerance, Tolerance as notified from time to time by giving notice NGG to NGG. In giving such notice the Reservation Party shall take into account the timescale required for User Nomination(s) in accordance with Clause 6.1.
4.9 A Reservation Party that is a User may change the amount of Reserved Capacity, provided always that this amount falls within the Reserved Capacity Tolerance, by giving notice to NGG of not less than ten (10) days prior to the Allocation Date4.7.
4.10 Following a notice from a Reservation Party to change the amount of Reserved Capacity in accordance with Clauses 4.8 or 4.9, NGG shall accommodate such change of amount of Reserved Capacity, provided always that this amount falls within the Reserved Capacity Tolerance.
Appears in 1 contract
Samples: Planning and Advanced Reservation of Capacity Agreement (Parca)
PHASE 2 PARCA WORKS. 4.1 Subject to the conditions in Clause 3.1 being satisfied and the terms of this Clause 4, NGG shall undertake and subject to Clause 4.2 complete the Phase 2 PARCA Works in respect of the Reserved Capacity identified in the Phase 1 PARCA Works Report in accordance with the indicative timetable specified in the Phase 1 PARCA Works Report and in doing so NGG shall act in accordance with the standards of a Reasonable and Prudent Operator.
4.2 NGG shall keep the Reservation Party regularly informed of NGG's progress in completing each stage of the Phase 2 PARCA Works. Where NGG expects that completion of any stage of the Phase 2 PARCA Works will not take place in accordance with the indicative timetable in the Phase 1 PARCA Works Report (or such other timetable agreed with the Reservation Party) NGG shall inform the Reservation Party as soon as reasonably practicable and provide the following:
4.2.1 an explanation as to why it expects that the Phase 2 PARCA Works will not take place in accordance with the indicative timetable provided in the Phase 1 PARCA Works Report (or such other timetable agreed with the Reservation Party); and
4.2.2 a revised indicative timetablepracticable. NGG shall not be liable to the Reservation Party for any delay in completion of any stage of the Phase 2 PARCA Works.
4.3 In respect of the stages of Phase 2 PARCA Works:
4.3.1 the Reservation Party agrees to provide NGG with the Demonstration Information by the First Demonstration Date;
4.3.2 NGG shall undertake the stage(s) of the Phase 2 PARCA Works following receipt of the Demonstration Information;
4.3.3 NGG shall not be required to undertake the stage(s) of Phase 2 PARCA Works until it is in receipt of the Demonstration Information.
4.4 In the event NGG has not received the Demonstration Information in respect of any stage of the Phase 2 PARCA Works by the Third Demonstration Date (or where agreed with NGG, an Ad-Hoc Demonstration Date) NGG may terminate this Agreement. NGG will endeavour to remind the Reservation Party on the Second Demonstration Date that it may terminate this Agreement in the event it has not received the Demonstration Information in respect of any stage of the Phase 2 PARCA Works by the Third Demonstration Date (or where agreed with NGG, an Ad-Hoc Demonstration Date) but any failure to remind will not preclude NGG from exercising its right of termination.
4.5 Following completion of each stage of Phase 2 PARCA Works, NGG will provide as soon as reasonably practicable to the Reservation Party a Phase 2 PARCA Works Report containing information in respect of the relevant stage of Phase 2 PARCA Works including, but not limited to, project update and project progression against the indicative timetable as set out in the Phase 1 PARCA Works Report.. Demonstration Information for the next stage of the Phase 2
4.6 Where following submission of a report(s) in accordance with Clause4.6Clause 4.5, NGG XXX has already received the Demonstration Information for the next stage of the Phase 2 PARCA Works NGG shall proceed to undertake such stage of the Phase 2 PARCA Works without delay.
4.7 At any time during During the period between the Reservation Date and the Allocation Date NGG shall have the ability to amend the Reserved Capacity Tolerance. NGG will keep the Reservation Party regularly notified of any such changes to the Reserved Capacity Tolerance.
4.8 A Reservation Party that is not a User may change the amount of Reserved Capacity, provided always that this amount falls within the Reserved . Capacity Tolerance, by giving notice to NGG. In giving making such notice request the Reservation Party shall take into account the timescale required for User Nomination(s) in accordance with Clause 6.1.
4.9 A Reservation Party that is a User may change the amount of Reserved Capacity, provided always that this amount falls within the Reserved Capacity Tolerance, by giving notice to NGG of not less than ten (10) days prior to the Allocation Date.
4.10 Following a notice from a Reservation Party to change the amount of Reserved Capacity in accordance with Clauses 4.8 or 4.9, NGG shall accommodate such change of amount of Reserved Capacity, provided always that this amount falls within the Reserved Capacity Tolerance.into
Appears in 1 contract
Samples: Planning and Advanced Reservation of Capacity Agreement (Parca)