Pilot Plant Flotation Testwork Sample Clauses

Pilot Plant Flotation Testwork. Once the flotation response has been confirmed in the laboratory, a piloting campaign will be conducted on the sample to produce approximately 1.1 ton of concentrate. All the streams will be sampled during the campaign to produce a flotation mass balance. Each sample will be prepared for analysis and analysed for Au and S2.
AutoNDA by SimpleDocs

Related to Pilot Plant Flotation Testwork

  • Acceptance Testing The MCP must have the capability to report all elements in the Minimum Data Set as set forth in the ODJFS Encounter Data Specifications and must submit a test file in the ODJFS-specified medium in the required formats prior to contracting or prior to an information systems replacement or update. Acceptance testing of encounter data is required as specified in Section 29(a)(v) of this Appendix.

  • Commissioning preparation of a system or systems to allow hydrocarbons or other process fluids to be safely introduced into the system or systems for processing. In this phase testing will focus on systems, including utilities.

  • Engineering Services The Borrower’s Engineer will provide engineering services covering planning and design, operation of the System, and the supervision and inspection of the construction of the Project. The Borrower’s Engineer will provide to the Department the certificate required by Section 3.4.

  • Building Services To install, use and maintain through the Premises, pipes, conduits, wires and ducts serving the Building, provided that such installation, use and maintenance does not unreasonably interfere with Tenant's use of the Premises.

  • Project Scope This section should contain SOW summary information including: o Project definition and expected duration o Project goals, objectives, o Priorities & expectations o Project approach & responsibilities o Overall coordination and assumptions

  • Project Completion Within five (5) days after the delivery by Supplier to Purchaser of a Commissioning Certificate for the Project’s final Turbine, Supplier shall also deliver to Purchaser a completion certificate for all Turbines in the Project (the “Project Completion Certificate”), in the form attached hereto as Exhibit N, together with a list of any remaining Punch List Work on any Turbine, a schedule for completing the Punch List Work and an estimate of the cost of each item of Punch List Work. Supplier shall thereafter promptly complete all Punch List Work.

  • Project The Land and all improvements thereon, including the Building, the Parking Facilities, and all Common Areas.

  • Production Work Except as agreed to in writing by the Parties pursuant to the "Production Work" section of the Standard Online Commerce Terms & Conditions attached hereto as Exhibit F, MP will be responsible for all production work associated with the Affiliated MP Site, including all related costs and expenses.

  • Rent Rolls; Operating Histories The Seller has obtained a rent roll (the “Certified Rent Roll(s)”) other than with respect to hospitality properties certified by the related Mortgagor or the related guarantor(s) as accurate and complete in all material respects as of a date within 180 days of the date of origination of the related Mortgage Loan. The Seller has obtained operating histories (the “Certified Operating Histories”) with respect to each Mortgaged Property certified by the related Mortgagor or the related guarantor(s) as accurate and complete in all material respects as of a date within 180 days of the date of origination of the related Mortgage Loan. The Certified Operating Histories collectively report on operations for a period equal to (a) at least a continuous three-year period or (b) in the event the Mortgaged Property was owned, operated or constructed by the Mortgagor or an affiliate for less than three years then for such shorter period of time, it being understood that for mortgaged properties acquired with the proceeds of a Mortgage Loan, Certified Operating Histories may not have been available.

  • Budget For Tenant Improvements A preliminary detailed breakdown by trade of the costs incurred or that will be incurred in connection with the design and construction of the Tenant Improvements is set forth on Schedule 3 attached hereto (the “Budget”). The Budget is based upon the TI Construction Drawings approved by Tenant and shall include a payment to Landlord of administrative rent (“Administrative Rent”) equal to 1.5% of the TI Costs, which Administrative Rent shall include, without limitation, all out-of-pocket costs, expenses and fees incurred by or on behalf of Landlord arising from, out of, or in connection with monitoring the construction of the Tenant Improvements and Changes, and shall be payable out of the TI Fund. Landlord shall provide Tenant with a final Budget promptly following approval of the TI Construction Drawings by Landlord and Tenant. The Budget shall be subject to Tenant’s review and approval which approval shall not be unreasonably withheld, conditioned or delayed by Tenant. Tenant shall have the right to approve any use of the contingency in the Budget by Landlord; provided, however, that, Tenant’s approval shall not be unreasonably withheld, conditioned or delayed, and the contingency shall not be available for use by Tenant for any Changes until all unforeseen conditions, changes to resulting from governmental agencies and the like have first been paid for out of the contingency.