Point of Offtake Sample Clauses

Point of Offtake. 2.1 The point of offtake at the Premises Supply Meter Point is [/] as shown in the diagram in Annex B.
AutoNDA by SimpleDocs
Point of Offtake. 2.1. The point of offtake at the Supply Meter Point is as shown in [Diagram 1] of Schedule 2.
Point of Offtake. 4.2.1 The applicable Supplemental Agreement will identify (by description or a diagram or both) a point of offtake ("Point of Offtake") at each Individual Offtake Point comprised in an Offtake.

Related to Point of Offtake

  • Point of Sale The electric meter for each Participating Consumer’s account, as designated by the Local Distributor.

  • Point of Interconnection The Point of Interconnection shall be as identified on the one-line diagram attached as Schedule B to this ISA.

  • Point of Delivery The point of interconnection between NEPOOL Pool Transmission Facilities and the transmission facilities of the Local Distributor.

  • Point of Contact (09/17) Contractor shall be the sole point of contact for the City with regard to this Contract and the System.

  • Single Point of Contact When a problem is experienced, regardless of the severity, the BellSouth Network Management Center (NMC) will observe traffic anomalies and begin monitoring the situation. Controls will be appropriately applied to insure the sanity of BellSouth's network; and, in the event that a switch or facility node is lost, the NMC will attempt to circumvent the failure using available reroutes. BellSouth's NMC will remain in control of the restoration efforts until the problem has been identified as being a long-term outage. At that time, the NMC will contact BellSouth's Emergency Control Center (ECC) and relinquish control of the recovery efforts. Even though the ECC may take charge of the situation, the NMC will continue to monitor the circumstances and restore traffic as soon as damaged network elements are revitalized. The telephone number for the BellSouth Network Management Center in Atlanta, as published in Telcordia’s National Network Management Directory, is 000-000-0000.

  • Points of Interconnection As and to the extent required by Section 251 of the Act, the Parties shall provide Interconnection of their networks at any technically feasible point as described in Section 4.3. To the extent the originating Party’s POI is not located at the terminating Party’s relevant IP, the originating Party is responsible for transporting its traffic from it’s POI to the terminating Party’s relevant IP.