Policy Document Revision Sample Clauses

Policy Document Revision. Task 2.1 Administrative Draft Policy Document Revisions Work under this task from Amendment 1 is complete. See Tasks 2.3 – 2.5 for updates.
AutoNDA by SimpleDocs
Policy Document Revision. Task 2.1 Administrative Draft Policy Document Revisions The Consultants will revise the existing draft General Plan Policy Document (September 2014) based on public comments provided to the County, to address State Planning Law (e.g., Flood Risk [AB162/SB5], Complete Streets [AB 1358], Military Facilities [SB 1468, SB 926], Air Quality [AB 170], and Groundwater [SGMA]), and to reflect a revised planning horizon (e.g., 2040). The Policy Document will also be prepared as the County’s qualified plan for the reduction of greenhouse gas emissions pursuant to CEQA Guidelines Section 15183.5(b). The Consultants will prepare an administrative draft General Plan Policy Document for review by County staff. The Policy Document will be updated using Microsoft Word track changes to show how the document is being revised. The Consultants will work with County staff to collect, address, and respond to public comments.

Related to Policy Document Revision

  • Document Review The Company and the Executive hereby acknowledge and agree that each (i) has read this Agreement in its entirety prior to executing it, (ii) understands the provisions and effects of this Agreement, (iii) has consulted with such attorneys, accountants and financial and other advisors as it or he has deemed appropriate in connection with their respective execution of this Agreement, and (iv) has executed this Agreement voluntarily and knowingly.

  • Agreement Review If, pursuant to section 25.10 (Review of Agreement) of the Bilateral Agreement, the Bilateral Agreement is reviewed after three or five years, or both, of the effective date of the Bilateral Agreement, and any changes to the Bilateral Agreement are required as a result, the Parties agree to amend the Agreement as necessary and in a manner that is consistent with such changes.

  • Construction Document Phase 1.4.1 Based on the approved Design Development Documents, Guaranteed Maximum Price, coordinated models and any further adjustments in the scope or quality of the Project or in the Amount Available for the Construction Contract authorized by the Owner, the Architect/Engineer shall prepare, for approval by the Owner and review by the Construction Manager, Construction Documents consisting of Drawings, Schedules and Specifications derived from the model(s) in accordance with Owner’s written requirements setting forth in detail the requirements for construction of the Project, including, without limitation, the BIM Execution Plan and “Facility Design Guidelines”. The Plans, Drawings and Specifications for the entire Project shall be so prepared that same will call for the construction of the building and related facilities, together with its built-in permanent fixtures and equipment which will cost not more than the Guaranteed Maximum Price accepted by Owner, or the Amount Available for the Construction Contract established by Owner if no Guaranteed Maximum Price proposal has been accepted by Owner. The Architect/Engineer will be responsible for managing the design to stay within such Guaranteed Maximum Price proposal or Amount Available for the Construction Contract. The Architect/Engineer shall review the Construction Documents as they are being prepared at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Construction Documents. The Architect/Engineer shall provide the Construction Manager with a compact disc containing documents and data files derived from the model to assist the Construction Manager in fulfilling its responsibilities to the Owner.

  • Document Retention As used in this Section 15.2, the term “Documents” shall mean all files, documents, books, records and other data delivered to Buyer by Seller pursuant to the provisions of this Agreement (other than those that Seller has retained either the original or a copy of), including: financial and tax accounting records; land, title and division of interest files; contracts; engineering and well files; and books and records related to the operation of the Assets prior to the Closing Date. Buyer shall retain and preserve the Documents for a period of no less than seven years following the Closing Date (or for such longer period as may be required by law or governmental regulation), and shall allow Seller or its representatives, at Seller’s expense, to inspect the Documents at reasonable times and upon reasonable notice during regular business hours during such time period. Seller shall have the right during such period to make copies of the Documents at its expense.

  • Source Documentation Accounting records must be supported by such source documentation as canceled checks, bank statements, invoices, paid bills, donor letters, time and attendance records, activity reports, travel reports, contractual and consultant agreements, and subaward documentation. All supporting documentation should be clearly identified with the Award and general ledger accounts which are to be charged or credited.

  • Client Agreement 2.1. The Company may unilaterally change any terms of this Client Agreement for any of the following reasons:

  • Construction Documents Phase Services 3.4.1 Based on the Owner’s approval of the Design Development Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Construction Documents for the Owner’s approval. The Construction Documents shall illustrate and describe the further development of the approved Design Development Documents and shall consist of Drawings and Specifications setting forth in detail the quality levels and performance criteria of materials and systems and other requirements for the construction of the Work. The Owner and Architect acknowledge that, in order to perform the Work, the Contractor will provide additional information, including Shop Drawings, Product Data, Samples and other similar submittals, which the Architect shall review in accordance with Section 3.6.4.

  • Supplemental Contract A teacher’s contract(s) for assigned and accepted services during hours that are in addition to those paid for in the teacher’s base contract or in contract addendum(s).

  • Project contract 1. For each approved project a project contract shall be concluded between the Programme Operator and the Project Promoter.

  • Construction Documents Phase 2.2.1.5. Bidding or Negotiation Phase: 2.2.1.6. Construction Administration Phase

Time is Money Join Law Insider Premium to draft better contracts faster.