Post-installation Inspections Sample Clauses

Post-installation Inspections. This article does not apply to post-installation inspections performed as part of a pre-license survey in those cases when Applicant has occupied space on or in SWBT’s poles, ducts, conduits, or rights-of-way prior to the issuance of a license pursuant to Section 8.03 of this Agreement.
AutoNDA by SimpleDocs
Post-installation Inspections. This article does not apply to post-installation inspections performed as part of a pre- permit survey in those cases when Applicant has occupied space on or in NEVADA’s poles, ducts, conduits, or rights-of-way prior to the issuance of a permit pursuant to Section 8.3 of this Agreement.
Post-installation Inspections. Each Cable Company shall conduct ROV Burial verification to determine whether any buried sections of its Covered Cables have become exposed at minimum of every 18 months and not to exceed 24 months and after any events which may affect the Cable Project. Copies of videotapes recording the verification shall be provided to the Committee.
Post-installation Inspections. Within thirty (30) days of notice to METRO that the Licensee has completed installation of an Attachment and/or Equipment Attachment, METRO or its contractors may, at METRO’s sole discretion, perform a post‐installation inspection for each Attachment and/or Equipment Attachment made to METRO Infrastructure. If such post‐installation inspections are performed, Licensee shall pay the actual and documented costs for the post‐installation inspection, including the administrative costs to METRO of the notification and inspection. If METRO elects to not perform any post‐installation inspection, such non‐inspection shall not be grounds for any liability being imposed on METRO or a waiver of any liability of Licensee. If the post‐installation inspection reveals that Licensee’s facilities have been installed in violation of Applicable Standards or the approved design described in the Application, METRO will notify Licensee in writing and Licensee shall have thirty (30) days from the date of receipt of such notice to correct such violation(s), or such other period as the parties may agree upon in writing, unless such violation creates an Emergency in which case Licensee shall make all reasonable efforts to correct such violation immediately. METRO may perform subsequent post‐installation inspections within thirty (30) days of receiving notice that the correction has been made as necessary to ensure Licensee’s Attachments and/or Equipment Attachments have been brought into compliance.

Related to Post-installation Inspections

  • Installation Where installation is required, Contractor shall be responsible for placing and installing the product in the required locations at no additional charge, unless otherwise designated on the Contract or purchase order. Contractor’s authorized product and price list shall clearly and separately identify any additional installation charges. All materials used in the installation shall be of good quality and shall be free of defects that would diminish the appearance of the product or render it structurally or operationally unsound. Installation includes the furnishing of any equipment, rigging, and materials required to install or replace the product in the proper location. Contractor shall protect the site from damage and shall repair damages or injury caused during installation by Contractor or its employees or agents. If any alteration, dismantling, excavation, etc., is required to achieve installation, the Contractor shall promptly restore the structure or site to its original condition. Contractor shall perform installation work so as to cause the least inconvenience and interference with Customers and with proper consideration of others on site. Upon completion of the installation, the location and surrounding area of work shall be left clean and in a neat and unobstructed condition, with everything in satisfactory repair and order.