Post-Showing Replacement Capacity Sample Clauses

Post-Showing Replacement Capacity. For any month of the RA Delivery Period, if CAISO determines, in accordance with the Tariff, that any portion of the Expected Contract Quantity for any portion of a Showing Month which was shown by Buyer in its Compliance Showings requires outage replacement in accordance with Section 40.7 of the Tariff (“Shortfall Capacity”), Seller’s Monthly RA Capacity Payment will be reduced in accordance with Section 9.02(a) above and, neither Seller, nor the Storage Unit’s SC, shall have the right to provide Buyer with RA Replacement Capacity with respect to such Shortfall Capacity.
AutoNDA by SimpleDocs
Post-Showing Replacement Capacity. In the event CAISO determines, in accordance with the Tariff, that any portion of the Expected Contract Quantity for any portion of a Showing Month which was shown by Buyer in its RA Compliance Showings requires outage replacement in accordance with Section 40.7 of the Tariff (“Shortfall Capacity”), Seller’s Monthly Capacity Payment will be reduced in accordance with Section 10.01 below and, neither Seller, nor the Generating Unit’s SC (unless the Generating Unit’s SC is Buyer), shall have the right to provide Buyer with RA Replacement Capacity with respect to such Shortfall Capacity.
Post-Showing Replacement Capacity. If the CAISO determines there is Shortfall Capacity, Seller’s Monthly Capacity Payment will be reduced in accordance with Section 3.06(a) and, neither Seller nor the Storage Unit’s SC (unless the Storage Unit’s SC is SCE) shall have the right to provide SCE with “RA Replacement Capacity,” as defined in the CAISO Tariff, with respect to such Shortfall Capacity.
Post-Showing Replacement Capacity. For any month of the RA Period, if the CAISO determines there is Shortfall Capacity, Seller’s Monthly RA Capacity Payment will be reduced in accordance with Section 3.06(a) and, neither Seller nor the Storage Unit’s SC (unless the Storage Unit’s SC is SCE) shall have the right to provide SCE with “RA Replacement Capacity,” as defined in the CAISO Tariff, with respect to such Shortfall Capacity.

Related to Post-Showing Replacement Capacity

  • Contract Capacity The generation capability designated for the Project shall be the contract capacity in MW designated in the Cover Sheet, net of all auxiliary loads, station electrical uses, and Electrical Losses (the “Contract Capacity”). Throughout the Delivery Term, Seller shall sell and deliver all Product produced by the Project solely to Buyer. In no event shall Buyer be obligated to receive, in any Settlement Interval, any Surplus Delivered Energy. Seller shall not receive payment for any Surplus Delivered Energy. To the extent Seller delivers Surplus Delivered Energy to the Delivery Point in a Settlement Interval in which the Real-Time Price for the applicable PNode is negative, Seller shall pay Buyer an amount equal to the Surplus Delivered Energy (in MWh) during such Settlement Interval, multiplied by the absolute value of the Real-Time Price per MWh for such Settlement Interval.]

  • Local Circuit Switching Capability, including Tandem Switching Capability 4.2.1 Local circuit switching capability is defined as: (A) line-side facilities, which include, but are not limited to, the connection between a loop termination at a main distribution frame and a switch line card; (B) trunk-side facilities, which include, but are not limited to, the connection between trunk termination at a trunk-side cross-connect panel and a switch trunk card; (C) switching provided by remote switching modules; and (D) all features, functions, and capabilities of the switch, which include, but are not limited to: (1) the basic switching function of connecting lines to lines, line to trunks, trunks to lines, and trunks to trunks, as well as the same basic capabilities made available to BellSouth’s customers, such as a telephone number, white page listings, and dial tone; and (2) all other features that the switch is capable of providing, including but not limited to customer calling, customer local area signaling service features, and Centrex, as well as any technically feasible customized routing functions provided by the switch. Any features that are not currently available but are technically feasible through the switch can be requested through the BFR/NBR process.

  • Independent Capacity of Contractor The Contractor and Contractor Parties shall act in an independent capacity and not as officers or employees of the state of Connecticut or of the Agency.

  • Under-Frequency and Over Frequency Conditions The New York State Transmission System is designed to automatically activate a load- shed program as required by the NPCC in the event of an under-frequency system disturbance. Developer shall implement under-frequency and over-frequency relay set points for the Large Generating Facility as required by the NPCC to ensure “ride through” capability of the New York State Transmission System. Large Generating Facility response to frequency deviations of predetermined magnitudes, both under-frequency and over-frequency deviations, shall be studied and coordinated with the NYISO and Connecting Transmission Owner in accordance with Good Utility Practice. The term “ride through” as used herein shall mean the ability of a Generating Facility to stay connected to and synchronized with the New York State Transmission System during system disturbances within a range of under-frequency and over-frequency conditions, in accordance with Good Utility Practice and with NPCC Regional Reliability Reference Directory # 12, or its successor.

  • INDEPENDENT CAPACITY The employees or agents of each party who are engaged in the performance of this Agreement shall continue to be employees or agents of that party and shall not be considered for any purpose to be employees or agents of the other party.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where InterGlobe has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to InterGlobe. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for InterGlobe (e.g. hairpinning):

  • Life support equipment (a) If a person living at your premises requires life support equipment, you must register the premises with your retailer or with us. To register, you will need to give written confirmation from a registered medical practitioner of the requirement for life support equipment at the premises.

  • Casual Loading (e) Superannuation contributions are to be made for periods when Employees are on:

  • Requesting Price Increase/Required Documentation Contractor must submit a written notification at least thirty (30) calendar days prior to the requested effective date of the change, setting the amount of the increase, along with an itemized list of any increased prices, showing the Contractor’s current price, revised price, the actual dollar difference and the percentage of the price increase by line item. Price change requests must include H-GAC Forms D Offered Item Pricing and E Options Pricing, or the documentation used to submit pricing in the original Response and be supported with substantive documentation (e.g. manufacturer's price increase notices, copies of invoices from suppliers, etc.) clearly showing that Contractor's actual costs have increased per the applicable line item bid. The Producer Price Index (PPI) may be used as partial justification, subject to approval by H-GAC, but no price increase based solely on an increase in the PPI will be allowed. This documentation should be submitted in Excel format to facilitate analysis and updating of the website. The letter and documentation must be sent to the Bids and Specifications manager, Xxxxxxx Xxxxxx, at Xxxxxxx.Xxxxxx@x-xxx.xxx Review/Approval of Requests If H-GAC approves the price increase, Contractor will be notified in writing; no price increase will be effective until Contractor receives this notice. If H-GAC does not approve Contractor’s price increase, Contractor may terminate its performance upon sixty (60) days advance written notice to H-GAC, however Contractor must fulfill any outstanding Purchase Orders. Termination of performance is Contractor’s only remedy if H-GAC does not approve the price increase. H-GAC reserves the right to accept or reject any price change request.

  • Required Coverages For Generation Resources Of 20 Megawatts Or Less Each Constructing Entity shall maintain the types of insurance as described in section 11.1 paragraphs (a) through (e) above in an amount sufficient to insure against all reasonably foreseeable direct liabilities given the size and nature of the generating equipment being interconnected, the interconnection itself, and the characteristics of the system to which the interconnection is made. Additional insurance may be required by the Interconnection Customer, as a function of owning and operating a Generating Facility. All insurance shall be procured from insurance companies rated “A-,” VII or better by AM Best and authorized to do business in a state or states in which the Interconnection Facilities are located. Failure to maintain required insurance shall be a Breach of the Interconnection Construction Service Agreement.

Time is Money Join Law Insider Premium to draft better contracts faster.