Power Conditioning and Control Sample Clauses

Power Conditioning and Control. 93 7.5.1 Bus Configuration........................................93 7.5.2 Failure Modes and Shutdown Sequence......................94 7.5.3 Bus Undervoltage and Overvoltage.........................95 7.5.4 Interaction Between the Communications and Power Subsystems...............................................95 7.6 TT&C Interfaces.....................................................95 8. THERMAL CONTROL SUBSYSTEM..................................................96 8.1
AutoNDA by SimpleDocs
Power Conditioning and Control. The power conditioning and control equipment shall transfer and transform the bus voltage from either the array or the batteries to the satellite loads in a form suitable for each load. The transfer from solar array to battery and vice versa shall be automatic, stable, and smooth. [*] [*] CONFIDENTIAL TREATMENT REQUESTED BY ICO GLOBAL COMMUNICATIONS (HOLDINGS) LIMITED.

Related to Power Conditioning and Control

  • Heating and Air Conditioning Xxxxxx agrees to furnish to Lessee heating and air conditioning equipment and maintain same in satisfactory operating condition at all times for the Premises during the term of the Lease at the expense of Lessor. Xxxxxx agrees that thermostats in the Premises will be set to maintain an average zone temperature of 75 degrees Fahrenheit during the heating and cooling seasons.

  • Heating, Ventilating and Air Conditioning General Office Area: The building shall be equipped with a combination heating, ventilation and air conditioning system. The system shall have ducted supply and return air. The space above the ceiling shall not be used as a supply or return plenum. The systems shall be sized in accordance with the

  • Air Conditioning If the Apartment has been provided with a ledge for split air conditioning system with suitable provision for keeping outdoor units of the AC system and also the route to take refrigerant piping, which the Allottee shall have to strictly follow while installing AC units

  • Heating, Ventilation and Air Conditioning Landlord shall furnish to the Premises heating, ventilation and air-conditioning (“HVAC”) in accordance with the Design Standards set forth in Exhibit D during Ordinary Business Hours. Landlord shall have access to all air-cooling, fan, ventilating and machine rooms and electrical closets and all other mechanical installations of Landlord (collectively, “Mechanical Installations”), and Tenant shall not construct partitions or other obstructions which may interfere with Landlord’s access thereto or the moving of Landlord’s equipment to and from the Mechanical Installations. No Tenant Party shall at any time enter the Mechanical Installations or tamper with, adjust, or otherwise affect such Mechanical Installations. Landlord shall not be responsible if the HVAC System fails to provide cooled or heated air, as the case may be, to the Premises in accordance with the Design Standards by reason of (i) any equipment installed by, for or on behalf of Tenant, which has an electrical load in excess of the average electrical load and human occupancy factors for the HVAC System as designed, or (ii) any rearrangement of partitioning or other Alterations made or performed by, for or on behalf of Tenant. Tenant shall install, if missing, blinds or shades on all windows, which blinds and shades shall be subject to Landlord’s approval, and shall keep operable windows in the Premises closed, and lower the blinds when necessary because of the sun’s position, whenever the HVAC System is in operation or as and when required by any Requirement. Tenant shall cooperate with Landlord and shall abide by the rules and regulations which Landlord may reasonably prescribe for the proper functioning and protection of the HVAC System. Tenant acknowledges that the server room in the Premises currently has three heat pumps installed, being two 4-ton units, and one 2.5-ton unit (the “Existing Heat Pumps”). The 2.5-ton unit is currently connected and operational. Tenant shall determine whether it is satisfied with the condition of the Existing Heat Pumps and Landlord shall not have any responsibility or liability for the condition, operation, maintenance, repair or replacement of the Existing Heat Pumps. Tenant may operate the Existing Heat Pumps. Tenant shall be responsible for, and pay directly for, all necessary maintenance and repairs to the Existing Heat Pumps. Tenant shall reimburse Landlord monthly for the cost of all utility services used to operate the Existing Heat Pumps within 10 Business Days after receipt of Landlord’s invoice for such amount. Landlord may measure Tenant’s usage of such utility services by either a sub-meter or by other reasonable methods such as by temporary check meters or by survey. Tenant, at its cost, may replace the Existing Heat Pumps with one or more new heat pumps, provided, however, that the capacity of such replacement heat pump(s) shall not exceed the 10.5-ton capacity cooling capacity of the Existing Heat Pumps.

  • Quality Control A. Controlled Affiliate agrees to use the Licensed Marks and Name only in connection with the licensed services and further agrees to be bound by the conditions regarding quality control shown in attached Exhibit A as they may be amended by BCBSA from time-to-time. B. Controlled Affiliate agrees to comply with all applicable federal, state and local laws. C. Controlled Affiliate agrees that it will provide on an annual basis (or more often if reasonably required by Plan or by BCBSA) a report or reports to Plan and BCBSA demonstrating Controlled Affiliate’s compliance with the requirements of this Agreement including but not limited to the quality control provisions of this paragraph and the attached Exhibit A. D. Controlled Affiliate agrees that Plan and/or BCBSA may, from time-to-time, upon reasonable notice, review and inspect the manner and method of Controlled Affiliate’s rendering of service and use of the Licensed Marks and Name. E. As used herein, a Controlled Affiliate is defined as an entity organized and operated in such a manner, that it meets the following requirements: (1) A Plan or Plans authorized to use the Licensed Marks in the Service Area of the Controlled Affiliate pursuant to separate License Agreement(s) with BCBSA, other than such Controlled Affiliate’s License Agreement(s), (the “Controlling Plan(s)”), must have the legal authority directly or indirectly through wholly-owned subsidiaries to select members of the Controlled Affiliate’s governing body having not less than 50% voting control thereof and to: (a) prevent any change in the articles of incorporation, bylaws or other establishing or governing documents of the Controlled Affiliate with which the Controlling Plan(s) do(es) not concur; (b) exercise control over the policy and operations of the Controlled Affiliate at least equal to that exercised by persons or entities (jointly or individually) other than the Controlling Plan(s); and Notwithstanding anything to the contrary in (a) through (b) hereof, the Controlled Affiliate’s establishing or governing documents must also require written approval by the Controlling Plan(s) before the Controlled Affiliate can: (i) change its legal and/or trade names; (ii) change the geographic area in which it operates; (iii) change any of the type(s) of businesses in which it engages; (iv) create, or become liable for by way of guarantee, any indebtedness, other than indebtedness arising in the ordinary course of business; (v) sell any assets, except for sales in the ordinary course of business or sales of equipment no longer useful or being replaced; (vi) make any loans or advances except in the ordinary course of business; (vii) enter into any arrangement or agreement with any party directly or indirectly affiliated with any of the owners or persons or entities with the authority to select or appoint members or board members of the Controlled Affiliate, other than the Plan or Plans (excluding owners of stock holdings of under 5% in a publicly traded Controlled Affiliate); (viii) conduct any business other than under the Licensed Marks and Name; (ix) take any action that any Controlling Plan or BCBSA reasonably believes will adversely affect the Licensed Marks and Name. In addition, a Plan or Plans directly or indirectly through wholly owned subsidiaries shall own at least 50% of any for-profit Controlled Affiliate. (2) A Plan or Plans authorized to use the Licensed Marks in the Service Area of the Controlled Affiliate pursuant to separate License Agreement(s) with BCBSA, other than such Controlled Affiliate’s License Agreement(s), (the “Controlling Plan(s)”), have the legal authority directly or indirectly through wholly-owned subsidiaries to select members of the Controlled Affiliate’s governing body having more than 50% voting control thereof and to: (a) prevent any change in the articles of incorporation, bylaws or other establishing or governing documents of the Controlled Affiliate with which the Controlling Plan(s) do(es) not concur; (b) exercise control over the policy and operations of the Controlled Affiliate. In addition, a Plan or Plans directly or indirectly through wholly-owned subsidiaries shall own more than 50% of any for-profit Controlled Affiliate.

  • Quality Control Program Engineer shall have a quality control program in place that ensures that all deliverable work is of high quality. Engineer shall submit a plan detailing its program to the Inspection Branch of the TxDOT Bridge Division for review and approval prior to beginning work. State may review or audit the programs.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Erosion Prevention and Control Purchaser’s Operations shall be conducted reasonably to minimize soil erosion. Equipment shall not be operated when ground conditions are such that excessive damage will result. Purchaser shall adjust the kinds and intensity of erosion control work done to ground and weather condi- tions and the need for controlling runoff. Erosion control work shall be kept current immediately preceding ex- pected seasonal periods of precipitation or runoff.

  • Weather Conditions The Contractor will be required to protect all work and materials against damage or injury from the weather. If, in the opinion of the County, any work or materials shall have been damaged or injured by reason of failure to protect such, all such materials or work shall be removed and replaced at the expense of the Contractor.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!