Power Factor Design Criteria. Developer shall design the Large Generating Facility to maintain an effective power delivery at maximum capability at the Point of Interconnection (POI) at a power factor within the range of 0.85 lagging (vars to the Connecting Transmission Owner) to 0.95 leading (vars from Connecting Transmission Owner) at the Point of Interconnection. This capability will be available to the Connecting Transmission Owner’s system as requested by the Connecting Transmission Owner or the NYISO under normal system conditions (i.e., when all design facilities are in service), as well as in steady-state conditions occurring after design criteria contingencies described in the NYSRC Reliability Rules & Compliance Manual for Planning and Operating the New York State Power System. Developer and the Connecting Transmission Owner will review DAF transformer tap settings as may be needed to optimize operation for such changes in transmission system conditions, on a seasonal basis, and implement such changes to optimize the tap settings with the Connecting Transmission Owner’s approval.
Appears in 11 contracts
Samples: Large Generator Interconnection Agreement, Large Generator Interconnection Agreement, Large Generator Interconnection Agreement