Real and Reactive Power Control. 36 9.6 Outages and Interruptions. 37 9.7 Switching and Tagging Rules. 41 9.8 Use of Attachment Facilities by Third Parties. 41 9.9 Disturbance Analysis Data Exchange. 42 10.1 Connecting Transmission Owner Obligations. 42 10.2 Developer Obligations. 42 10.3 Coordination. 42 10.4 Secondary Systems. 42 10.5 Operating and Maintenance Expenses. 43
Real and Reactive Power Control. 9.5.1 Voltage Support Developer shall provide voltage support to the Connecting Transmission Owner’s transmission system at the Point of Interconnection, to be measured at the Connecting Transmission Owner’s Goethals Substation, as shall be requested by the Connecting Transmission Owner from time to time, to the extent of 0.90 lagging to 0.96 leading, and shall use best efforts to provide such voltage support to the extent of 0.85 lagging to 0.95 leading, which best efforts shall not require Developer to incur any additional expense or revenue loss.
Real and Reactive Power Control. Power Factor Design Criteria.
Real and Reactive Power Control xxxviii)8.5.1 9.
Real and Reactive Power Control