Real and Reactive Power Control Sample Clauses

Real and Reactive Power Control. 9.5.1 Voltage Support Developer shall provide voltage support to the Connecting Transmission Owner’s transmission system at the Point of Interconnection, to be measured at the Connecting Transmission Owner’s Goethals Substation, as shall be requested by the Connecting Transmission Owner from time to time, to the extent of 0.90 lagging to 0.96 leading, and shall use best efforts to provide such voltage support to the extent of 0.85 lagging to 0.95 leading, which best efforts shall not require Developer to incur any additional expense or revenue loss.
Real and Reactive Power Control. Power Factor Design Criteria.
Real and Reactive Power Control xxxviii)8.5.1 9.5.1
Real and Reactive Power Control 

Related to Real and Reactive Power Control

  • Reactive Power 1.8.1 The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all similarly situated generators in the New York Control Area on a comparable basis.

  • Cloud Computing State Risk and Authorization Management Program In accordance with Senate Bill 475, Acts 2021, 87th Leg., R.S., pursuant to Texas Government Code, Section 2054.0593, Contractor acknowledges and agrees that, if providing cloud computing services for System Agency, Contractor must comply with the requirements of the state risk and authorization management program and that System Agency may not enter or renew a contract with Contractor to purchase cloud computing services for the agency that are subject to the state risk and authorization management program unless Contractor demonstrates compliance with program requirements. If providing cloud computing services for System Agency that are subject to the state risk and authorization management program, Contractor certifies it will maintain program compliance and certification throughout the term of the Contract.

  • Payment for Reactive Power NYISO shall pay Developer for reactive power or voltage support service that Developer provides from the Large Generating Facility in accordance with the provisions of Rate Schedule 2 of the NYISO Services Tariff.

  • Infection Control Consistent with the Centers for Disease Control and Prevention Guideline for Infection Control in Health Care Personnel, and University Policy 3364-109-EH-603, the parties agree that all bargaining unit employees who come in contact with patients in the hospital or ambulatory care clinics will need to be vaccinated against influenza when flu season begins each fall. The influenza vaccine will be offered to all health care workers, including pregnant women, before the influenza season, unless otherwise medically contraindicated or it compromises sincerely held religious beliefs.

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.