Prattville Intake Control Measure Sample Clauses

Prattville Intake Control Measure. Licensee shall, within three months after issuance of a New Project License, initiate a modeling study to evaluate the anticipated effectiveness of the Prattville Intake Modification control measures. The study shall be completed as soon as practicable but no later than one year after issuance of New Project License. The ERC and FS will evaluate the effectiveness of such control measures after review of the study results. Subject to the provisions of Paragraph 5 below which sets forth the Licensee’s total financial commitment for Reasonable Control Measures as set forth in Paragraphs 2 and 4 of this section, the ERC and FS shall affirmatively determine which Prattville Intake Modification control measures, if any, shall be implemented. This determination shall be based on a finding that the modification control measures will effectively contribute to the maintenance of mean daily water temperatures of 20 degrees Celsius or less in the Rock Creek and Cresta Reaches. This determination shall also be based on the best scientific information available, the use of sound scientific methods, consideration of the relative cost of different Prattville Intake Modification control measures, and the relative temperature control benefits of such measures and alternatives thereto. Licensee shall construct any Prattville Intake Modifications and commence operation for selective withdrawal of coldwater from Lake Almanor no later than one winter and one following summer season after issuance of the New Project License and the affirmative determination of the ERC and FS above, unless that schedule is impractical due to any further regulatory approval required for such control measures. In the event that further regulatory approval is required, Licensee shall promptly apply for such approval, and shall implement the control measures no later than one winter and one following summer season after obtaining the requisite approval.
AutoNDA by SimpleDocs

Related to Prattville Intake Control Measure

  • School Meals 31) The Academy Trust shall, if requested to do so by or on behalf of any pupils at the Academy, provide school lunches for those pupils unless it would be unreasonable for it to do so. Subject to the provisions of clause 32 charges may be levied for lunches, but the Academy Trust shall otherwise fund the cost of such school lunches from its GAG.

  • Erosion and Sediment Control The Contractor shall install and maintain erosion and sediment control devices to prevent adjacent streets, storm drains and property from accumulations of soil, sediment, or dust which result from his work. Devices installed to control sediment and prevent erosion shall comply with the requirements of the Georgia Tech Project Superintendent. The Contractor is responsible for monitoring downstream conditions throughout the construction period and clearing any debris, sediment, and dust caused by the progress of the Work. The Contractor shall inspect, maintain, and clear erosion and sediment control devices at least weekly unless otherwise directed by the Georgia Institute of Technology Construction Manager. At the conclusion of the Work, the Contractor shall remove all installed devices and restoring the site to the satisfaction of the Georgia Tech Construction Manager.

  • Unbundled Network Element Combinations 4.1 For purposes of this Section, references to “Currently Combined” Network Elements shall mean that the particular Network Elements requested by NewPhone are in fact already combined by BellSouth in the BellSouth network. References to “

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Traffic Measurement and Billing over Interconnection Trunks 6.1 For billing purposes, each Party shall pass Calling Party Number (CPN) information on at least ninety-five percent (95%) of calls carried over the Interconnection Trunks.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where InterGlobe has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to InterGlobe. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for InterGlobe (e.g. hairpinning):

  • Unbundled Loop Concentration (ULC) System 2.5.1 BellSouth will provide to <<customer_name>> Unbundled Loop Concentration (ULC). Loop concentration systems in the central office concentrate the signals transmitted over local loops onto a digital loop carrier system. The concentration device is placed inside a BellSouth central office. BellSouth will offer ULC with a TR008 interface or a TR303 interface.

  • Interim Measures 6.1 The Parties acknowledge that the British Columbia Claims Task Force made the following recommendation concerning interim measures:

  • Transit Traffic The following rates will apply:

  • Direct Trunked Transport 7.3.2.1 Either Party may elect to purchase direct trunked transport from the other Party.

Time is Money Join Law Insider Premium to draft better contracts faster.