Common use of PRE SUBMITTAL REQUIREMENTS Clause in Contracts

PRE SUBMITTAL REQUIREMENTS. A. Scope Definition: Prior to GMP submittal, the Contractor shall thoroughly review the GMP construction document package with the Owner and determine if the scope is sufficiently defined and identify those areas requiring additional scope definition. As a minimum the following should be defined: Program building size, site limits and access, utility systems (existing and new), complete building systems descriptions, materials outline by division, MEP systems descriptions including materials, MEP system options shall be defined and accepted. Refer to the section “PDRI For Buildings” which is an attachment to the Agreement for additional guidelines. The PDRI checklist must be completed at this time.

Appears in 9 contracts

Samples: Agreement, Agreement, cdn.cocodoc.com

AutoNDA by SimpleDocs

PRE SUBMITTAL REQUIREMENTS. A. Scope Definition: Prior to GMP submittal, the Contractor Construction Manager shall thoroughly review the GMP construction document Construction Document package with the Owner and determine if the scope is sufficiently defined and identify those areas requiring additional scope definition. As a minimum the following should be defined: Program building size, site limits and access, utility systems (existing and new), complete building systems descriptions, materials outline by division, MEP systems descriptions including materials, MEP system options shall be defined and accepted. Refer to the section “PDRI For Buildings” which is an attachment to the Agreement Contract for additional guidelines. The PDRI checklist must be completed at this time.

Appears in 4 contracts

Samples: gato-docs.its.txstate.edu, gato-docs.its.txstate.edu, www.smartrisk.biz

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.