Submittal Requirements Sample Clauses

Submittal Requirements. To comply with Subsection 4.1, Consultant shall submit the following: a. Certificate of Liability Insurance in the amounts specified in the section; and b. Waiver of Subrogation Endorsement as required by the section.
AutoNDA by SimpleDocs
Submittal Requirements. To comply with Subsection 4.3, Consultant shall submit the Certificate of Liability Insurance in the amounts specified in the section.
Submittal Requirements. Consultant shall submit the following to City prior to beginning services: a. Certificate of Liability Insurance in the amounts specified in this Agreement; and b. Additional Insured Endorsement as required for the General Commercial and Automobile Liability Polices.
Submittal Requirements. To comply with Subsection 4.1, Contractor shall submit the following: a. Certificate of Workers’ Compensation Insurance in the amounts specified in the section; and b. Waiver of Subrogation Endorsement as required by the section.
Submittal Requirements. To comply with Subsection 6.4, Subrecipient shall submit the Certificate of Liability Insurance in the amounts specified in the section.
Submittal Requirements. A complete submittal shall consist of the following documents and information: (a) A copy of the complete application pursuant to Section 8.5, Shoreline permit application requirements; (b) Findings and conclusions that establish the basis for the decision including but not limited to identification of shoreline environment designation, applicable policies and regulations of the City’s Shoreline Master Program and the consistency of the project with appropriate review criteria for the type of permit(s) as established in Section 8.7, Shoreline permit review criteria; (c) The final decision of the City; (d) The permit data sheet required by WAC 000-00-000; and (e) Where applicable, the City shall also file the applicable documents required by chapter 43.21C RCW, the State Environmental Policy Act, or in lieu thereof, a statement summarizing the actions and dates of such actions taken under chapter 43.
Submittal Requirements. The following forms shall be submitted with your Guaranteed Maximum Price (GMP) as evidence of SBE and/or M/WBE participation: 1. OEO FORM 1, Proposed Schedule of Participation. This form must be submitted with the GMP and must include the following information: a. The name, current telephone number and SBE or M/WBE classification for each firm that is participating on the contract. b. A description of the scope of work, materials, equipment or services to be furnished by the certified SBE and/or M/WBE subcontractor, sub consultant or supplier that is listed to participate in the contract; if a building trade is divided between two subcontractors, a detailed description of the scope of work, materials, equipment or services, slated to be performed by each must be provided; c. The agreed-upon dollar value for such work, materials, equipment or services, slated to be performed by each named SBE and/or M/WBE firm; d. Please note that SBEs and/or M/WBEs participating on DCPS projects must be certified as an SBE and/or M/WBE with the DCPS Office of Economic Opportunity, prior to the bid opening. e. The percentage of the SBE and/or M/WBE participation will be evaluated in comparison to the base bid price quoted by the Construction Manager. 2. OEO FORM 2, Letter of Intent to Perform as a SBE and/or M/WBE Subcontractor. This form is to be completed by the Subcontractor and submitted with the GMP. 3. OEO FORM 3, Prime Contractor Affidavit. This form is to be completed by the prime contractor, sworn and subscribed before a notary, and included in the bid/proposal. 4. OEO FORM 4, Pre award waiver for Good Faith Efforts. In the event the Prime Contractor is unable to obtain bids/quote from SBE and/or M/WBE subcontractors that equal or exceed the percentages established in the participation goals, he or she shall submit OEO Form 4 with his GMP. Good Faith Effort will be determined by a point system. Prime contractors will need a minimum score of 80 points in order to demonstrate a good faith effort.
AutoNDA by SimpleDocs
Submittal Requirements a. In addition to the submittal requirements outlined in Section 5.A.2 of these provisions, the Contractor shall submit the following for approval by the Railroad Engineer: i. A plan showing the location of cranes, horizontally and vertically, operating radii, with delivery or disposal locations shown. The location of all tracks and other Railroad facilities as well as all obstructions such as wire lines, poles, adjacent structures, etc. must also be shown. ii. Rating sheets showing cranes or lifting devices to be adequate for 150% of the actual weight of the pick, including all rigging components. A complete set of crane charts, including crane, counterweight, and boom nomenclature is to be submitted. Safety factors that may have been “built-in” to the crane charts are not to be considered when determining the 150% factor of safety. iii. Plans and computations showing the weight of the pick must be submitted. Calculations shall be made from plans of the existing structure showing complete and sufficient details with supporting data for the demolition the structure. If plans do not exist, lifting weights must be calculated from field measurements. The field measurements are to be made under the supervision of the Registered Professional Engineer submitting the procedure and calculations. iv. The Contractor shall provide a sketch of all rigging components from the crane’s hook block to the beam. Catalog cuts or information sheets of all rigging components with their lifting capacities shall be provided. All rigging must be adequate for 150% of the actual weight of the pick. Safety factors that may have been “built-in” to the rating charts are not to be considered when determining the 150% factor of safety. All rigging components shall be clearly identified and tagged with their rated lifting capacities. The position of the rigging in the field shall not differ from what is shown on the final plan without prior review from the Sponsor and the Railroad. v. A complete demolition procedure, including the order of lifts, time required for each lift, and any repositioning or re-hitching of the crane or cranes. vi. Design and supporting calculations for the temporary support of components, including but not limited to the stability of the superstructure during the temporary condition, temporary girder tie- downs and falsework.
Submittal Requirements. 1. Certificate of non-segregated facilities: Contractor shall submit with proposal, each subcontractor shall submit when work is sublet. 2. Professional and Technical Workforce Data Form: Contractor is encouraged to submit with proposal, each Subcontractor is encouraged to submit the form when work is sublet.
Submittal Requirements. When the Design/Builder makes submittals to the Owner at the various phases of design, the Design/Builder shall comply with the requirements for such submittals set forth on Exhibit D