Interim Record Drawings and Specifications. As a requirement for acceptance of Substantial Completion, Construction Manager shall reproduce two (2) copies of the current As-Build Drawings and Specifications maintained at the job site and provide these copies to the Owner. These documents shall be labeled “Interim Record Drawings and Specifications”, and are required to assist the Owner in the operation of the facility until Final Completion is accomplished and the final As-Built Drawings and Specifications are provided to the Project Architect to prepare the final “Record Drawings” and “Record Specifications”.
AutoNDA by SimpleDocs
Interim Record Drawings and Specifications. As a requirement for acceptance of Substantial Completion, CM shall reproduce two (2) copies of the current As-Build Drawings and Specifications maintained at the job site and provide these copies to the Owner. These documents shall be labeled “Interim Record Drawings and Specifications”, and are required to assist the Owner in the operation of the facility until Final Completion is accomplished and the final As- Built Drawings and Specifications are provided to the A/E to prepare the final “Record Drawings” and “Record Specifications”.
Interim Record Drawings and Specifications. As a requirement for acceptance of Substantial Completion, Design/Build Contractor shall reproduce one (1) scanned pdf and one (1) scanned hardcopy of the current As-Built Drawings and Specifications maintained at the job site and provide these copies to Owner. These documents shall be labeled “Interim Record Drawings and Specifications”, and are required to assist Owner in the operation of the facility until Final Completion is accomplished and the final As-Built Drawings and Specifications are provided to Project A/E to prepare the final “Record Drawings” and “Record Specifications”.
Interim Record Drawings and Specifications. As a requirement for acceptance of Substantial Completion, Design-Build Firm shall provide two (2) bound “E” size sets of the complete current up to date As-Built Drawings and Specifications. These documents shall be labeled “Interim Record Drawings and Specifications” and are required to assist the Owner in the operation of the facility until Final Completion is accomplished and the final Design-Build Firm produced As-Built Drawings and Specifications are provided to the Project Architect/Engineer to prepare the final “Record Drawings” and “Record Specifications”.
Interim Record Drawings and Specifications. As a requirement for acceptance of Substantial Completion, Construction Manager shall reproduce two (2) copies of the current As-Built Drawings and Specifications maintained at the job site and provide these copies to the Owner. These documents shall be labeled “Interim Record Drawings and Specifications”, and are required to assist the Owner in the operation of the facility until Final Completion is accomplished and the final As-Built Drawings and Specifications are provided to the Project Architect to prepare the final “Record Drawings” and “Record Specifications”. BY SIGNING BELOW, the Parties have executed and bound themselves to this Agreement as of the day and year first above written. OWNER: XXXXXXXXXX COUNTY, TEXAS, a political subdivision of the state of Texas CONSTRUCTION MANAGER: CHASCO CONSTRUCTORS, LTD., L.L.P., a Texas limited liability partnership, acting by and through its general partner, CHASCO CONTRACTING, LTD., a Texas limited partnership, acting by and through its general partner, CHASCO CONTRACTING MANAGEMENT, L.L.C., a Texas limited liability company By: _______________________ Printed Name: _________________ Title: Xxxxxxxxxx County Judge By: _______________________ Printed Name: _________________ Title: ________________________ ATTEST: By: _______________________ Printed Name: _________________ Title: ________________________ ATTEST: By: _______________________ Printed Name: _________________ Title: ________________________ Approved as to Form: By: Xxx X. Xxxxx Assistant Xxxxxxxxxx County Attorney By: Xxxxx Xxxxxx, CPA, Xxxxxxxxxx County Contract Management Auditor On-Site Project Management Staff Safety Coordinator/Assistant(s) CPM Scheduler Project Executive Superintendent(s) Office Engineer(s) CMR’s Project Manager(s) Project Expeditor(s) Project Support Staff Assistant Superintendent(s) Project Specific Travel* Bonds and Insurance Builder’s Risk Insurance General Liability Insurance Payment and Performance Bonds Other Project Insurance as Required by Contract Temporary Project Utilities Dumpsters Project Water Project Electricity Temporary Toilets Monthly Telephone Service Temporary Fire Protection Street Rental and Barricades Telephone System Installation Fencing and Covered Walkways Temporary Water Distribution and Meters Temporary Electrical Distribution and Meters Site Erosion Control (BMP) and Project Entrance(s) Field Offices & Office Supplies Partnering Costs First Aid Supplies Job Photos/Videos Reproduction Services Pro...
Interim Record Drawings and Specifications. As a requirement for acceptance of Substantial Completion, Contractor shall reproduce two (2) copies of the current As-Built Drawings and Specifications maintained at the job site and provide these copies to the Owner.

Related to Interim Record Drawings and Specifications

  • Drawings and Specifications 9.1 A complete list of all Drawings that form a part of the Contract Documents are to be found as an index on the Drawings themselves, and/or may be provided to Developer and/or in the Table of Contents. 9.2 Materials or Work described in words that so applied have a well-known technical or trade meaning shall be deemed to refer to recognized standards, unless noted otherwise. 9.3 Trade Name or Trade Term It is not the intention of the Contract Documents to go into detailed descriptions of any materials and/or methods commonly known to the trade under “trade name” or “trade term.” The mere mention or notation of “trade name” or “trade term” shall be considered a sufficient notice to Developer that it will be required to complete the work so named, complete, finished, and operable, with all its appurtenances, according to the best practices of the trade. 9.4 The naming of any material and/or equipment shall mean furnishing and installing of same, including all incidental and accessory items thereto and/or labor therefor, as per best practices of the trade(s) involved, unless specifically noted otherwise. 9.5 Contract Documents are complementary, and what is called for by one shall be binding as if called for by all. As such, Drawings and Specifications are intended to be fully cooperative and to agree. However, if Developer observes that Drawings and Specifications are in conflict with the Contract Documents, Developer shall promptly notify District and Architect in writing, and any necessary changes shall be made as provided in the Contract Documents. 9.6 Figured dimensions shall be followed in preference to scaled dimensions, and Developer shall make all additional measurements necessary for the work and shall be responsible for their accuracy. Before ordering any material or doing any work, each Developer shall verify all measurements at the building and shall be responsible for the correctness of same. 9.7 Should any question arise concerning the intent or meaning of the Contract Documents, including the Plans and Specifications, the question shall be submitted to the District for interpretation. If a conflict exists in the Contract Documents, these Construction Provisions shall control over the Facilities Lease, which shall control over the Site Lease, which shall control over Division 1 Documents, which shall control over Division 2 through Division 49 documents, which shall control over figured dimensions, which shall control over large-scale drawings, which shall control over small-scale drawings. In no case shall a document calling for lower quality and/or quantity of material or workmanship control. However, in the case of discrepancy or ambiguity solely between and among the Drawings and Specifications, the discrepancy or ambiguity shall be resolved in favor of the interpretation that will provide District with the functionally complete and operable Project described in the Drawings and Specifications. 9.8 Drawings and Specifications are intended to comply with all laws, ordinances, rules, and regulations of constituted authorities having jurisdiction, and where referred to in the Contract Documents, the laws, ordinances, rules, and regulations shall be considered as a part of the Contract Documents within the limits specified. 9.9 As required by Section 4-317(c), Part 1, Title 24, CCR: “Should any existing conditions such as deterioration or non-complying construction be discovered which is not covered by the DSA-approved documents wherein the finished work will not comply with Title 24, California Code of Regulations, a construction change document, or a separate set of plans and specifications, detailing and specifying the required repair work shall be submitted to and approved by DSA before proceeding with the repair work.”

  • Construction Schedule The progress schedule of construction of the Project as provided by Developer and approved by District.