Interim Record Drawings and Specifications Sample Clauses

Interim Record Drawings and Specifications. As a requirement for acceptance of Substantial Completion, Construction Manager shall reproduce two (2) copies of the current As-Build Drawings and Specifications maintained at the job site and provide these copies to the Owner. These documents shall be labeled “Interim Record Drawings and Specifications”, and are required to assist the Owner in the operation of the facility until Final Completion is accomplished and the final As-Built Drawings and Specifications are provided to the Project Architect to prepare the final “Record Drawings” and “Record Specifications”. (OPTIONAL LANGUAGE)
AutoNDA by SimpleDocs
Interim Record Drawings and Specifications. As a requirement for acceptance of Substantial Completion, CM shall reproduce two (2) copies of the current As-Build Drawings and Specifications maintained at the job site and provide these copies to the Owner. These documents shall be labeled “Interim Record Drawings and Specifications”, and are required to assist the Owner in the operation of the facility until Final Completion is accomplished and the final As- Built Drawings and Specifications are provided to the A/E to prepare the final “Record Drawings” and “Record Specifications”.
Interim Record Drawings and Specifications. As a requirement for acceptance of Substantial Completion, Design/Build Contractor shall reproduce one (1) scanned pdf and one (1) scanned hardcopy of the current As-Built Drawings and Specifications maintained at the job site and provide these copies to Owner. These documents shall be labeled “Interim Record Drawings and Specifications”, and are required to assist Owner in the operation of the facility until Final Completion is accomplished and the final As-Built Drawings and Specifications are provided to Project A/E to prepare the final “Record Drawings” and “Record Specifications”.
Interim Record Drawings and Specifications. As a requirement for acceptance of Substantial Completion, Construction Manager shall reproduce two (2) copies of the current As-Built Drawings and Specifications maintained at the job site and provide these copies to the Owner. These documents shall be labeled “Interim Record Drawings and Specifications”, and are required to assist the Owner in the operation of the facility until Final Completion is accomplished and the final As-Built Drawings and Specifications are provided to the Project Architect to prepare the final “Record Drawings” and “Record Specifications”. BY SIGNING BELOW, the Parties have executed and bound themselves to this Agreement as of the day and year first above written. OWNER: XXXXXXXXXX COUNTY, TEXAS, a political subdivision of the state of Texas CONSTRUCTION MANAGER: CHASCO CONSTRUCTORS, LTD., L.L.P., a Texas limited liability partnership, acting by and through its general partner, CHASCO CONTRACTING, LTD., a Texas limited partnership, acting by and through its general partner, CHASCO CONTRACTING MANAGEMENT, L.L.C., a Texas limited liability company By: _______________________ Printed Name: _________________ Title: Xxxxxxxxxx County Judge By: _______________________ Printed Name: _________________ Title: ________________________ ATTEST: By: _______________________ Printed Name: _________________ Title: ________________________ ATTEST: By: _______________________ Printed Name: _________________ Title: ________________________ Approved as to Form: By: Xxx X. Xxxxx Assistant Xxxxxxxxxx County Attorney By: Xxxxx Xxxxxx, CPA, Xxxxxxxxxx County Contract Management Auditor EXHIBIT A ALLOWABLE GENERAL CONDITION LINE ITEMS On-Site Project Management Staff Safety Coordinator/Assistant(s) CPM Scheduler Project Executive Superintendent(s) Office Engineer(s) CMR’s Project Manager(s) Project Expeditor(s) Project Support Staff Assistant Superintendent(s) Project Specific Travel* Bonds and Insurance Builder’s Risk Insurance General Liability Insurance Payment and Performance Bonds Other Project Insurance as Required by Contract Temporary Project Utilities Dumpsters Project Water Project Electricity Temporary Toilets Monthly Telephone Service Temporary Fire Protection Street Rental and Barricades Telephone System Installation Fencing and Covered Walkways Temporary Water Distribution and Meters Temporary Electrical Distribution and Meters Site Erosion Control (BMP) and Project Entrance(s) Field Offices & Office Supplies Partnering Costs First Aid Sup...

Related to Interim Record Drawings and Specifications

  • Construction Drawings After approving the Additional Programming Information, Landlord shall cause the Architect and the Engineers to prepare and deliver to Tenant Construction Drawings that conform to the approved Space Plan and the approved Additional Programming Information. Such preparation and delivery shall occur within 15 business days after the later of Landlord’s approval of the Additional Programming Information or the mutual execution and delivery of this Agreement. Tenant shall approve or disapprove the Construction Drawings by notice to Landlord. If Tenant disapproves the Construction Drawings, Tenant’s notice of disapproval shall specify any revisions Tenant desires in the Construction Drawings. After receiving such notice of disapproval, Landlord shall cause the Architect and/or the Engineers to revise the Construction Drawings, taking into account the reasons for Tenant’s disapproval (provided, however, that Landlord shall not be required to cause the Architect or the Engineers to make any revision to the Construction Drawings that is inconsistent with the Landlord Requirements or that Landlord otherwise reasonably disapproves), and resubmit the Construction Drawings to Tenant for its approval. Such revision and resubmission shall occur within five (5) business days after the later of Landlord’s receipt of Tenant’s notice of disapproval or the mutual execution and delivery of this Agreement if such revision is not material, and within such longer period of time as may be reasonably necessary (but not more than 15 business days after the later of such receipt or such mutual execution and delivery) if such revision is material. Such procedure shall be repeated as necessary until Tenant has approved the Construction Drawings. The Construction Drawings approved by Landlord and Tenant are referred to in this Work Letter as the “Approved Construction Drawings”.