Preliminary Explanation. The Port and Tenant have agreed to substantially revise and simplify the provisions of the Agreement related to Rent for the Extension Period. The formulae for Percentage Rent have been completely revised. Savings Rent has been eliminated. All of the rent credits except the Minimum Income Credit (which has been modified) have been eliminated.
AutoNDA by SimpleDocs

Related to Preliminary Explanation

  • Preliminary Examination 2.22.1 The Procuring entity will examine the tenders to determine whether they are complete, whether any computational errors have been made, whether required sureties have been furnished, whether the documents have been properly signed, and whether the tenders are generally in order.

  • Preliminary Engineering In order to receive City review and approval of the Extensions, Developer shall furnish two (2) copies of the plat map, topographic map and proposed roads profile sheets in electronic format prior to the City’s ordering of the engineering plans from its Engineer. The contour elevation and road profile elevations shall be referenced to NAVD ‘88 datum. In the event Developer’s engineer prepares the construction plans and specifications, the above information shall be a part of the extension construction plans to be reviewed and approved by the City’s Engineer. The final plat map shall be to the scale of 1-inch = 20 feet. The contour map shall have a scale of 1-inch = 20 feet and contour intervals of two (2) feet or less. The road profile sheets shall be to the scale of 1-inch = 20 feet. Developer shall provide a minimum of one benchmark, datum being NAVD ‘88, on the project site; and the elevation and location of the benchmark shall be indicated on the maps furnished by Developer.

  • Preliminary Evaluation Site evaluation and planning functions should proceed concurrently with the accomplishment of Schematic Design, Design Development, and Construction Documents. The Design Professional shall conduct a preliminary review of the site based on information furnished by the Owner. The Design Professional will advise the Owner of potential site-related problems that the Design Professional notes from such review.

  • Preliminary Notice This notice is not a lien. The purpose of the notice is to let you know that the person who sends you the notice has the right to record a lien on your property if he or she is not paid. BE CAREFUL. The Preliminary Notice can be sent up to 20 days after the subcontractor starts work or the supplier provides material. This can be a big problem if you pay your contractor before you have received the Preliminary Notices. You will not get Preliminary Notices from your prime contractor or from laborers who work on your project. The law assumes that you already know they are improving your property. PROTECT YOURSELF FROM LIENS. You can protect yourself from liens by getting a list from your contractor of all the subcontractors and material suppliers that work on your project. Find out from your contractor when these subcontractors started work and when these suppliers delivered goods or materials. Then wait 20 days, paying attention to the Preliminary Notices you receive. PAY WITH JOINT CHECKS. One way to protect yourself is to pay with a joint check. When your contractor tells you it is time to pay for the work of a subcontractor or supplier who has provided you with a Preliminary Notice, write a joint check payable to both the contractor and the subcontractor or material supplier. For other ways to prevent liens, visit CSLB's website at xxx.xxxx.xx.xxx or call CSLB at 0-000-000-XXXX (2752). Remember, if you do nothing, you risk having a lien placed on your home. This can mean that you may have to pay twice, or face the forced sale of your home to pay what you owe. EXHIBIT B LIMITED WARRANTY Customer is entitled to the following warranties: 1. Manufacturer's Equipment Warranty – 25 Year Protections Slingshot obtains solar modules and inverters from third party suppliers (the "Equipment"). Slingshot hereby assigns to Customer the warranties provided by the applicable supplier or manufacturer of the Equipment and attached to this Exhibit B (each, a "Manufacturer Equipment Warranty"). IF REQUESTED BY SLINGSHOT POWER, IN CASES REQUIRING DIRECT CUSTOMER INVOLVEMENT, CUSTOMER AGREES TO ASSIST SLINGSHOT POWER TO INVOKE THE APPLICABLE WARRANTY BY MANUFACTURER OR SUPPLIER OF THE EQUIPMENT, TO COLLECT PROMPTLY THE APPLICABLE WARRANTY COSTS TO REPAIR AND/OR REPLACE ANY DEFECTIVE EQUIPMENT. Customer may request SolarPorts to coordinate the warranty claim process under the applicable Manufacturer Equipment Warranty, and SolarPorts shall use commercially reasonable efforts to process such warranty claims on behalf of Customer. Customer shall provide SolarPorts with all necessary information to make such Manufacturer Equipment Warranty claims. If SolarPorts deems it necessary to send SolarPorts personnel to Customer's Site regarding a Manufacturer Equipment Warranty claim (e.g., to diagnose a potential warranty claim or for labor related to uninstalling/installing any Equipment), a separate work order setting forth the price and other terms and conditions for SolarPorts's services shall be executed by Customer and SolarPorts and included in Warranty costs to be recovered from Manufacturer. During the entire Warranty Period Slingshot Power will honor the System Warranty and will repair or replace any defective part, material or component or correct any defective workmanship, AT NO COST OR EXPENSE to you (including all labor costs) when Customer submits a valid claim to us under this Limited Warranty. This assurance to our Customers in no way lessens the responsibility of the Manufacturer to honor any and all reimbursements to Slingshot Power including labor reimbursements per Manufacturer Equipment Warranty.\

  • Preliminary Matters The Chair of the Hearing Panel will ask each party if it has any objections to the constitution of the Hearing Panel. Responses will be noted and recorded. If an objection is raised, the party raising the objection will be asked to immediately outline the objection. The Hearing Panel will then determine the merits of the objection.

  • Preliminary Schedule A preliminary schedule of construction indicating the starting and completion dates of the various stages of the Work, including any information and following any form as may be specified in the Specifications. Once approved by District, this shall become the Construction Schedule. This schedule shall include and identify all tasks that are on the Project’s critical path with a specific determination of the start and completion of each critical path task as well as all Contract milestones and each milestone’s completion date(s) as may be required by the District.

  • Preliminary Cost Estimate Consulting Engineer/Architect shall furnish City an estimate of probable Construction Cost based on the preliminary design. Consulting Engineer/Architect's estimate of probable Construction Cost is to be made on the basis of Consulting Engineer/Architect's experience and qualifications and represent Consulting Engineer/Architect's best judgment as an experienced and qualified design professional, familiar with the construction industry.

  • Preliminary 4. The business of the Company may be commenced at any time after incorporation.

  • Preliminary Cost Estimates The Engineer shall develop a preliminary cost estimate using the Average Low Bid Unit Price. The Engineer shall estimate the total project cost including preliminary engineering, final engineering, right-of-way (ROW) acquisition, environmental compliance and mitigation, construction, utility relocation, and construction engineering inspection (CEI).

  • Construction Progress Schedule; Overall Project Schedule The Contractor shall submit for review by the Design Professional and approval by the Owner a Construction Progress Schedule based upon the Design Professional’s Preliminary Design and Construction Schedule and prepared using a CPM (Critical Path Method) process within sixty days after the Effective Date of the Contract, utilizing a full-featured software package in a form satisfactory to the Design Professional and Owner, showing the dates for commencement and completion of the Work required by the Contract Documents, including coordination of mechanical, plumbing, and electrical disciplines, as well as coordination of the various subdivisions of the Work within the Contract. Milestones must be clearly indicated and sequentially organized to identify the critical path of the Project. The Construction Schedule will be developed to represent the CSI specification divisions. It shall have the minimum number of activities required to adequately represent to the Owner the complete scope of Work and define the Project’s (and each Phase’s if phased) critical path and associated activities. The format of the Construction Progress Schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, inspections for Material Completion and Occupancy Date, and Final Completion Date. The Contractor shall submit, along with the Construction Progress Schedule, the Submittal Schedule for approval by the Design Professional, correlating the associated approval dates for the documents with the Construction Progress Schedule. Upon recommendation by the Design Professional and approval by the Owner, the Construction Progress Schedule shall become the Overall Project Schedule, which shall be utilized by the Design Professional, Owner and Contractor. The Contractor must provide the Design Professional and the Owner with monthly updates of the Overall Project Schedule indicating completed activities and any changes in sequencing or activity durations, including approved change orders. See also Article 3.3.5.