PREPARATION OF COLLECTED SAMPLES a) The gross sample collected at the loading end by the TPA will be divided into two portions. One portion (one fourth of the gross sample) called Part – 1 will be used for analysis of Total Moisture and the other portion (three fourth of the gross sample) called Part – 2 for determination of ash, moisture and GCV on Equilibrated Basis.
PREPARATION OF COLLECTED SAMPLES. 1.6.1 The Gross Sample collected at the loading end by CIMFR will be divided into two portions. One portion (one fourth of the Gross Sample) called Part-1 will be used for analysis of Total Moisture and the other portion (three fourth of the Gross Sample) called Part-2 for determination of ash, moisture and GCV on Equilibrated basis.
PREPARATION OF COLLECTED SAMPLES. 1.6.1 The Gross Sample collected will be divided into two portions. One portion (one fourth of the Gross Sample) called Part-1 will be used for analysis of Total Moisture and the other portion (three fourth of the Gross Sample) called Part-2 for determination of ash, moisture and GCV on Equilibrated basis . .