Prior SEPA Documents Sample Clauses

Prior SEPA Documents. The parties acknowledge the environmental impacts of the Project have been adequately addressed and analyzed in prior environmental documents, including, but not limited to, the Project SEPA Checklist.
AutoNDA by SimpleDocs
Prior SEPA Documents. The parties acknowledge the urban development within the TALUSEast Village Project area has been addressed and analyzed in prior environmental documents, including but not limited to environmental impact documents prepared for King County’s 1994 Comprehensive Plan, the City’s Comprehensive Plan, and the EIS accompanying King County’s Newcastle Community Plan.

Related to Prior SEPA Documents

  • Referenced Documents 2.3.1 Unless the context shall otherwise specifically require, and subject to Section 21, whenever any provision of this Agreement refers to a technical reference, technical publication, CLEC Practice, SBC-13STATE Practice, any publication of telecommunications industry administrative or technical standards, or any other document specifically incorporated into this Agreement (collectively, a “Referenced Instrument”), it will be deemed to be a reference to the then-current version or edition (including any amendments, supplements, addenda, or successors) of each Referenced Instrument that is in effect, and will include the then-current version or edition (including any amendments, supplements, addenda, or successors) of any other Referenced Instrument incorporated by reference therein.

  • Existing Documents The Contractor has reviewed and taken into consideration the Bidding Documents in preparing his bid.

  • Prior Agreements Superseded This Contract restates, amends and supersedes any and all prior Seller Contracts or Servicer Contracts between the parties except that any subservicing agreement executed by the Seller/Servicer in connection with any loan-security exchange transaction shall not be affected.

  • Superseded Agreements This Service Agreement supersedes and cancels, as of the effective date hereof, the following Service Agreements: FTS1 37823 DELTA NATURAL GAS CO., INC. By: /s/Axxx X. Xxxxx Name: Axxx X. Xxxxx Title: Vice President – Operations and Engineering Date: September 30, 1994 COLUMBIA GULF TRANSMISSION COMPANY By: /s/ S. X. Xxxxxxx Name: S. X. Xxxxxxx Title: Vice President Date: 10-11-94 Appendix A to Service Agreement No. 43828 Revision No. 2 Under Rate Schedule FTS-1 Between (Transporter) Columbia Gulf Transmission Company and (Shipper) Delta Natural Gas Company, Inc., Cumberland Division Transportation Demand Begin Date End Date Transportation Demand Dth/day Recurrence Interval November 1, 2010 October 31, 2015 1,836 1/1 – 12/31 Primary Receipt Points Begin Date End Date Measuring Point No. Measuring Point Name Maximum Daily Quantity (Dth/Day) Recurrence Interval November 1, 2010 October 31, 2015 2700010 CGT – Rayne 1,836 1/1 – 12/31 Primary Delivery Points Begin Date End Date Measuring Point No. Measuring Point Name Maximum Daily Quantity (Dth/Day) Recurrence Interval Appendix A to Service Agreement No. 43828 Revision No. 2 Under Rate Schedule FTS-1 Between (Transporter) Columbia Gulf Transmission Company and (Shipper) Delta Natural Gas Company, Inc., Cumberland Division The Master List of Interconnects (MLI) as defined in Section 1 of the General Terms and Conditions is incorporated herein by reference for purposes of listing valid secondary interruptible receipt points and delivery points. _____ Yes __X__ No (Check applicable blank) Transporter and Shipper have mutually agreed to a Regulatory Restructuring Reduction Option pursuant to Section 34 of the General Terms and Conditions of Transporter's FERC Gas Tariff. _____ Yes __X__ No (Check applicable blank) Shipper has a contractual right of first refusal equivalent to the right of first refusal set forth from time to time in Section 4 of the General Terms and Conditions of Transporter's FERC Gas Tariff. _____ Yes __X__ No (Check applicable blank) All gas shall be delivered at existing points of interconnection within the Maximum Daily Quantity, as applicable, set forth in Transporter's currently effective Rate Schedule FTS-1 Appendix A with Shipper, which for such points set forth are incorporated by reference. _____ Yes __X__ No (Check applicable blank) This Service Agreement covers interim capacity sold pursuant to the provisions of General Terms and Conditions Section 4.2(j). Right of first refusal rights, if and, applicable to this interim capacity are limited as provided for in General Terms and Conditions Section 4.2(j). CANCELLATION OF PREVIOUS APPENDIX A Service changes pursuant to this Appendix A, Revision No. 2 shall commence as of November 01, 2010. This Appendix A, Revision No. 2 shall cancel and supersede the previous Appendix A, Revision No. 1 to the Service Agreement dated November 1, 1994. With the exception of this Appendix A, Revision No.2, all other terms and conditions of said Service Agreement shall remain in full force and effect. Delta Natural Gas Company, Inc., Cumberland Division Columbia Gulf Transmission Company By: Sxxxxxx Xxxx By: Mxxx X. Xxxxx Its: Agent Its: Director, Commercial Services Date: April 28, 2010 Date: SERVICE AGREEMENT NX. 00000 XXXXXXX XX. 0000-00-00 – 0044 FTS 1 SERVICE AGREEMENT THIS AGREEMENT, made and entered into this 4th day of October, 1994, by and between: COLUMBIA GULF TRANSMISSION COMPANY ("TRANSPORTER") AND DELTA NATURAL GAS CO., INC. ("SHIPPER")

  • Existing Agreements The Executive represents to the Company that he is not subject or a party to any employment or consulting agreement, non-competition covenant or other agreement, covenant or understanding which might prohibit him from executing this Agreement or limit his ability to fulfill his responsibilities hereunder.

  • Prior Agreements; Modifications This Agreement and the schedules, attachments and exhibits attached hereto constitute the entire agreement between the Parties with respect to the subject matter hereof, and supersede all previous understandings, commitments, or representations concerning such subject matter. Each Party acknowledges that the other Party has not made any representations other than those that are expressly contained herein, if any. This Agreement may not be amended or modified in any way, and none of its provisions may be waived, except by a writing signed by an authorized representative of the Party against whom the amendment, modification, or waiver is sought to be enforced. The Project Managers shall not be authorized representatives within the meaning of this Section.

  • Review Documents The Architect/Engineer shall, at its expense, furnish and deliver to the Owner for Owner’s review, Refer to Exhibit C: Document Distribution Matrix for the required number of documents required for each review stage. The following Exhibits are fully incorporated into this Agreement by reference: EXHIBITS Ex A Personnel Titles and Hourly Rates Ex B BIM Execution Plan Ex C Document Distribution Matrix EXHIBIT A PERSONNEL TITLES AND HOURLY RATES The prime architectural or engineering firm for this project will assemble the following information from consulting team members associated with the project. The categories of personnel indicated should be edited to include only those expected to be actually working on this project. When preparing this schedule, you are expected to adhere to the position classifications and titles presented to the greatest extent possible. Additional consultant listings and/or position classifications may be added as needed or required by the project. UFirm/Position Classification UHourly Billing Rate Architecture – Huckabee Principal / Executive $250.00 Project Architect / Associate Principal $200.00 BIM Specialist $150.00 Project Leader $80.00 Project Engineer $200.00 Quality Control $100.00 Structural Leader $100.00 Engineer-in-Training $80.00 Intern / Draftsman $60.00 Administrative Staff $45.00 Urban Planner $150.00 Public Relations Consultant $150.00 Construction Observer $100.00 Design Architecture – Xxxxx Sports Principal $300.00 Senior Designer $200.00 Project Manager $160.00 Project Architect $130.00 Architect $110.00 Intern Architect $90.00 Interior Designer $100.00 MEP Engineering – Xxxxx DBR Partner $240.00 Project Manager $185.00 Senior Engineer $185.00 Senior Technology Designer $155.00 Engineer / Senior Designer $140.00 Senior Construction Administrator $140.00 Technology Designer $130.00 Commissioning Agent $130.00 Quality Assurance / Quality Control $130.00 Construction Administrator $110.00 Sustainability Advisor $110.00 Designer (M, E, P) $110.00 CADD Operator $65.00 Administrative Staff $60.00 Structural Engineering – JQ + Tsen Partner $240.00 Principal $210.00 Senior Project Manager $175.00 Engineering Technical Lead $190.00 Project Manager $155.00 Senior Project Engineer $135.00 Project Engineer $120.00 Senior Technician $110.00 Technician $90.00 Administrative Staff $75.00 Civil Engineering – Xxxxxxx Xxxx Principal $225.00 Associate Principal $200.00 Director $200.00 Senior Project Manager $150.00 Senior Project Coordinator $150.00 Project Manager $120.00 Project Coordinator $120.00 Project Engineer $95.00 Senior Technician $110.00 Technician $80.00 Drafter $75.00 Research Manager $80.00 Technical Assistant $50.00 Executive Assistant $85.00 Senior Administrative Assistant $80.00 Administrative Assistant $70.00 Expert Witness Testimony $350.00 Landscape Architecture – Xxxxxxx Xxxx Principal $225.00 Associate Principal $200.00 Director $200.00 Senior Project Manager $150.00 Project Manager $120.00 Project Landscape Architect $95.00 Landscape Designer $75.00 Drafter $75.00 Executive Assistant $85.00 Senior Administrative Assistant $80.00 Administrative Assistant $70.00 Expert Witness Testimony $350.00 Cost Consultant – Vermeleuns Principal $275.00 Associate Principal $245.00 Associate $215.00 Senior Project Manager $185.00 Senior Estimator $185.00 Estimator $125.00 Administrative Staff $125.00 Data/Telecommunications Consultant – Crux Technology + Security Design Project Principal $150.00 Project Manager $150.00 Quality Assurance $130.00 Design Support Services $130.00 Production / Drawing Support $90.00 Acoustical/Audio-Visual Consultant – BAi Principal $200.00 Technical Systems Specialist $150.00 Food Service Consultant – Xxxxx Design Solutions Project Administrator $175.00 Project Designer $155.00 Production Staff $125.00 Security Consultant – Crux Technology + Security Design Project Principal $150.00 Project Manager $150.00 Quality Assurance $130.00 Design Support Services $130.00 Production / Drawing Support $90.00 Fire & Life Safety Consultant – Xxxxxx Xxxxxx Director / Operation Manager $230.00 Senior Fire Protection Engineer $215.00 Senior Consultant $165.00 Consultant $150.00 Fire Protection Engineer $150.00 Associate $135.00 Roofing Consultant – Rooftech Expert Witness $250.00 Principal Engineer $150.00 Principal Architect $150.00 Senior Construction Consultant $150.00 Project Manager $150.00 Certified Infrared Themographer $150.00 Registered Roof Consultant $150.00 Laboratory Technician $125.00 CADD Designer I $115.00 CADD Designer II $95.00 Contract Administrator $100.00 Registered Roof Observer $75.00 Full-Time Registered Roof Observer $75.00 Clerical / Report Processor $60.00 EXHIBIT B BIM Execution Plan DEVELOPED BY (Name and Company) PROJECT INFORMATION The intent of this BIM Execution Plan is to provide a framework that will let the owner, design team, and contractor deploy building information modeling (BIM) technology and best practices on this project faster and more cost‐ effectively. If the delivery method is competitive sealed proposal then the contractor will be included in this Execution Plan at a later date. This plan delineates roles and responsibilities of each party, the detail and scope of information to be shared, relevant business processes and supporting software. To successfully implement Building Information Modeling (BIM) on a project, the project team has developed this detailed BIM Project Execution Plan. The BIM Project Execution Plan defines uses for BIM on the project (e.g. design authoring, cost estimating, and design coordination), along with a detailed design of the process for executing BIM throughout the project lifecycle. Project Name: Memorial Stadium Renovation and Expansion Project Number: 04-3176 Brief Project Description: Additional Project Information: Construction Delivery Method: Competitive Sealed Proposal (CSP) Project Schedule/Phases/Milestones: See Attached Include BIM milestones, pre‐design activities, major design reviews, stakeholder reviews, and any other major events which occur during the project lifecycle. Project Phase/Milestone Estimated Start Date Estimated Completion Date Project Stakeholders Involved Existing Documentation May 12, 2016 May 25, 2016 Huckabee Planning / Programming May 12,2016 May 24,2016 Huckabee/Xxxxx/Owner Schematic Design May 25, 2016 July 29, 2016 Design Team Design Development July 29, 2016 October 14, 2016 Design Team SD/DD Coordination September 28, 2016 October 6, 2016 Design Team/Owner Construction Documents October 17, 2016 January 16, 2017 Design team Facility Data Review XXX XXX TBD Construction May 26,2017 July 2018 GC/Design Team/Owner KEY PROJECT CONTACTS List of lead BIM contacts for each organization on the project. Additional contacts can be included later in the document. Organization Contact Name Role/Title Location Email Phone Xxxxxxxx Xxxxxxxx Xxxxx Sports Xxxxx DBR JQ+Xxxx Xxxxxxx Xxxx (Civil) Xxxxxxx Xxxx (Landscape) Crux (data) Crux (security) XXX Xxxxx Xxxxxx Xxxxxx Xxxxxxxxx Xxxx Xxxxxx Xxxx Xxxxxx Xxxxxxx Xxxxxxxx Xxxxx Xxxxx Xxxx Xxxxxx Xxxxxx Xxxxxxxx Xxxxxx Xxxxxxxx Xxxx Xxxxxxxxxx Xxxx Xxxxxxxxxx Xxxxxxx Xxxxx Xxxxx Xxxxx Chi Do Xxxxx Xxxxxxx Project Leader BIM Spec. Designer MEP Civil Landscape Tech Security Acoustical Food Service Fire/Life Safe Cost Est. Houston Houston Atlanta Houston Dallas Dallas Dallas Ft Worth Ft Worth Xxxxxx Xxxxxx Xxxxxx S Xxxxxxx xxxxxxx@xxxxxxxx‐xxx.xxx xxxxxxx@huckabee‐xxx.xxx XXxxxxxx@xxxxx.xxx XXxxxx@xxxxxx.xxx xxxxxxx@xxxxx.xxx xxxxxxxxx@xxxx.xxx xxxxxxxxx@xxxx.xxx xxxxxxxxxxx@xxxxxxxxxxxxx.xxx xxxxxxxxxxx@xxxxxxxxxxxxx.xxx xxxxxx@xxxxxxxxx.xxx xxxxx@xxxxxxxxxxx.xxx xxx@xxxxxxxxxxxx.xxx xxxxxxxx@xxxxxxxxxx.xxx BIM PROCESSES AND COLLABORATION PROCEDURES Describe the collaboration strategies used for developing the BIMs for the following applicable processes. Identify project team participants for each. Existing Conditions – Huckabee-BIM Specialist-Xxxx Xxxxxx Upon delivery of existing documentation to Huckabee, the BIM specialist will construct a Revit model of the existing conditions, to the extent required for the completion of the project. Conditions will be field verified and the finished existing model will be delivered to Xxxxx for use as a design background. Design Authoring-Xxxxx-TBD Design Concept in Sketchup can begin based on approximations of existing conditions. From multiple design concepts, one will be chosen to carry into Schematic Design. Schematic Design will be based on actual existing conditions. The Schematic Design may combine the use of Revit and Sketchup to adequately convey the design intent while assuring accuracy and constructability Design Reviews-Owner-TBD The owner and Xxxxx will review the SD for design intent while Xxxxxxxx will review the SD with Xxxxx for adequacy of information to proceed into Design Development. The SD will be accurately scaled with appropriate consideration for Structural and Mechanical design before moving into Design Development. Space Tracking-Xxxxx-TBD/Huckabee-Project Leader-Xxxx Xxxxxx At the end of SD, upon transition to DD, and at the completion of DD, the model will be reviewed to assure continuing adherence to the space program for the project. Energy Analysis-Xxxxx DBR Daylighting Analysis-Xxxxx DBR Cost Estimation-Vermeulens 3D Coordination (design and construction)-Owner/Xxxxx/Huckabee Upon transition to DD, at the completion of DD, at 50% CD, and at any point a structural or mechanical issue impacts the design, the model will be reviewed to assure continuing adherence to the design intent. Model Updates during Construction Facilities Management Data Record Modeling Other (describe) Model Delivery Schedule, Application and File Exchange Type Document the information exchanges and file transfers that will occur on the project. Discipline BIM Use File Sender/Receiver One‐Time or Frequency Due Date or Start Date Model File Model Software Native File Type Version File Exchange Type Arch Existing documentation Huckabee Upon completion Revit V16 .rvt Arch‐ Design/Conceptual Xxxxx Every two weeks Sketchup Arch‐ Design/Schematic Xxxxx Every two weeks Sketchup Arch‐Design Development Huckabee Every week Revit BIM AND FACILITY DATA REQUIREMENT Describe the methods to be used to fulfill the data requirements described in the Facility Design Guidelines. BIM AND DATA QUALITY CONTROL Describe the strategy to control the quality of the model(s) and the checks to be performed to assure quality. Checks Definition Responsible Party Software Frequency Visual Check Ensure there are no unintended model components and the design intent has been followed Huckabee & Xxxxx Revit v2016 Daily Interference Check Detect problems in the model where two building components are clashing including soft and hard Huckabee Navisworks Bi‐weekly Standards Check Ensure that the BIM and CADD Standard have been followed (fonts, dimensions, line styles, levels/layers, etc.) Huckabee Revit v2016; Bluebeam Weekly Model Integrity Checks Describe the QC validation process used to ensure that the Project Facility Data set has no undefined, incorrectly defined or duplicated elements and the reporting process on non‐compliant elements and corrective action plans Huckabee Revit v2016 Weekly Other MODEL STRUCTURE File Naming Structure File Name Formatting <ProjectNumber>_<District>_<ProjectName>_<Discipline>_v16 Architectural Model 1754-01-01_TSU_MemorialStadiumReno_ARCH_v16 Structural Model 1754-01-01_TSU_MemorialStadiumReno_STRUC_v16 Mechanical Model 1754-01-01_TSU_MemorialStadiumReno_MECH_v16 Plumbing Model 1754-01-01_TSU_MemorialStadiumReno_PLUMB_v16 Fire Sprinkler Model 1754-01-01_TSU_MemorialStadiumReno_FIRE_v16 Electrical Model 1754-01-01_TSU_MemorialStadiumReno_ELEC_v16 Model Structure The single Architectural model will contain all architectural information, including interiors information as a part of the model. All other disciplines will be linked as separate models. The civil will be linked as a flattened CAD file, unless extreme site terrain warrants the development of a topographical surface. In that instance, the topography would be included in the architectural model. Measurement and Coordinate System BIM Project Location by Project Address through Internet Mapping Service. Shared Coordinates to be defined in architectural model and acquired by all consultant models. Model Accuracy and Tolerances Models should include all appropriate dimensioning as needed for design intent, analysis, and construction. Level of detail and included model elements are provided in the Information Exchange Worksheet. Phase Discipline Tolerance Design Documents ACCURATE TO +/‐ 1/8” OF ACTUAL SIZE AND LOCATION Shop Drawings ACCURATE TO +/‐ 1/8” OF ACTUAL SIZE AND LOCATION ACCURATE TO +/‐ [ # ] OF ACTUAL SIZE AND LOCATION PROJECT DELIVERABLES In this section, list the BIM deliverables for the project and the format in which the information will be delivered. BIM Submittal Item Stage Approximate Due Date Format Notes BIM models and CAD files coordination as required (max. weekly) .rvt v2016; .dwg v2016 ATTACHMENTS List any supporting information and attach. TAMUS/FPC Review Document Distribution Matrix

  • Required Documents Prior to the Closing, the Parties agree to authorize all necessary documents, in good faith, in order to record the transaction under the conditions required by the recorder, title company, lender, or any other public or private entity.

  • Transfer Documents In furtherance of the contribution, assignment, transfer, conveyance and delivery of the Assets and the assumption of the Liabilities in accordance with Section 2.1(a), (i) each Party shall execute and deliver, and shall cause the applicable members of its Group to execute and deliver, to the other Party, such bills of sale, quitclaim deeds, stock powers, certificates of title, assignments of contracts and other instruments of transfer, conveyance and assignment as and to the extent necessary to evidence the transfer, conveyance and assignment of all of such Party’s and the applicable members of its Group’s right, title and interest in and to such Assets to the other Party and the applicable members of its Group in accordance with Section 2.1(a), and (ii) each Party shall execute and deliver, and shall cause the applicable members of its Group to execute and deliver, to the other Party, such assumptions of contracts and other instruments of assumption as and to the extent necessary to evidence the valid and effective assumption of the Liabilities by such Party and the applicable members of its Group in accordance with Section 2.1(a). All of the foregoing documents contemplated by this Section 2.1(b) shall be referred to collectively herein as the “Transfer Documents.”

  • Prior Agreements This Agreement supersedes and terminates, as of the date hereof, all prior Agreements between the Fund on behalf of each of the Portfolios and the Custodian relating to the custody of the Fund's assets.

Time is Money Join Law Insider Premium to draft better contracts faster.