Processing SNAP Interim Reports in the Regional Change Center Sample Clauses

Processing SNAP Interim Reports in the Regional Change Center a. If incoming SNAP Interim Reports are complete, the Contractor shall complete data entry into the State eligibility system.
AutoNDA by SimpleDocs

Related to Processing SNAP Interim Reports in the Regional Change Center

  • Modifications and Updates to the Wire Center List and Subsequent Transition Periods 2.1.4.12.1 In the event BellSouth identifies additional wire centers that meet the criteria set forth in Section 2.1.4.5, but that were not included in the Initial Wire Center List, BellSouth shall include such additional wire centers in a carrier notification letter (CNL). Each such list of additional wire centers shall be considered a “Subsequent Wire Center List”.

  • Please see the current Washtenaw Community College catalog for up-to-date program requirements Secondary / Post-Secondary Program Alignment Welding HIGH SCHOOL COURSE SEQUENCE 9th Grade 10th Grade 11th Grade 12th Grade English 9 Algebra I World History/Geography Biology World Language Phys Ed/Health English 10 Geometry U.S. History/Geography Physics or Chemistry World Language Visual/Performing/Applied Arts English 11 Algebra II Civics/Economics Welding English 12 Math Credit Science Credit Welding WASHTENAW COMMUNITY COLLEGE Welding Associate in Applied Science Semester 1 Math Elective(s)* 3 WAF 105 Introduction to Welding Processes 2 WAF 111 Oxy-fuel Welding 4 WAF 112 Shielded Metal Arc Welding 4 Semester Total 13 Semester 2 Speech Elective(s) 3 WAF 106 Blueprint Reading for Welders 3 WAF 123 Advanced Oxy-fuel Welding 4 WAF 124 Advanced Shielded Metal Arc Welding 4 Semester Total 14 Semester 3 Arts/Human. Elective(s) 3 Computer Lit. Elective(s) 3 WAF 215 Advanced Gas Tungsten Arc Welding 4 WAF 288 Gas Metal Arc Welding 4 Semester Total 14 Semester 4 WAF 200 Layout Theory Welding 3 WAF 210 Welding Metallurgy 3 Soc. Sci. Elective(s) 3 WAF 226 Specialized Welding Procedures 4 Semester Total 13 Semester 5 Nat. Sci. Elective(s) 4 WAF 227 Basic Fabrication 3 WAF 229 Shape Cutting Operations 3 Writing Elective(s) 3 Semester Total 13 Program Totals 67

  • Periodic Access to Thin Registration Data In order to verify and ensure the operational stability of Registry Services as well as to facilitate compliance checks on accredited registrars, Registry Operator will provide ICANN on a weekly basis (the day to be designated by ICANN) with up-­‐to-­‐date Registration Data as specified below. Data will include data committed as of 00:00:00 UTC on the day previous to the one designated for retrieval by ICANN.

  • Bulk Registration Data Access to Icann Periodic Access to Thin Registration Data. In order to verify and ensure the operational stability of Registry Services as well as to facilitate compliance checks on accredited registrars, Registry Operator will provide ICANN on a weekly basis (the day to be designated by ICANN) with up-to-date Registration Data as specified below. Data will include data committed as of 00:00:00 UTC on the day previous to the one designated for retrieval by ICANN.

  • Reference in the Residual Certificates to Supplemental Agreements A Residual Certificate authenticated and made available after the execution of any Supplemental Agreement pursuant to Article IX of this Trust Agreement may, and if required by Xxxxxx Xxx shall, bear a notation as to any matter provided for in such Supplemental Agreement. If Xxxxxx Mae shall so determine, new Residual Certificates so modified as to conform, in the opinion of Xxxxxx Xxx, to any such Supplemental Agreement may be prepared and executed by Xxxxxx Mae and authenticated and made available by the Certificate Registrar in exchange for the outstanding Residual Certificates.

  • ECR Number Environmental Commitment Record Requirements Description of ADOT Responsibilities TMP-3 The following measures will be implemented for the Selected Alternative: • All equipment exhaust systems will be in good working order. Properly designed engine enclosures and intake silencers will be used. • Equipment will be maintained on a regular basis. New equipment will be subject to new product emission standards. • Stationary equipment will be located as far away from sensitive receivers as possible. • Construction-related noise generators will be shielded from noise receivers (e.g., use temporary enclosures to shield generators or crushers, take advantage of site conditions to provide topographic separation). • Construction alerts will be distributed to keep the public informed of construction activities, and a toll-free number for construction-related complaints will be provided. • During the design phase, hours of operation will be evaluated to minimize disruptions during construction. ADOT to oversee for compliance TMP-4 Congestion from construction-related traffic will create temporary impacts in the project vicinity. The magnitude of these impacts will vary depending on the location of the sources of the fill material and of the disposition sites for surplus material, the land uses along the routes, the duration of hauling operations, staging locations, and the construction phasing. To identify acceptable routes and times of operation, ADOT, or its representative, will prepare an agreement with local agencies regarding hauling of construction materials on public streets. ADOT to oversee for compliance TP Attachment 000-0 Xxxxx Xxxxxxxx Xxxxxxx Project Record of Decision (ROD) Developer’s Environmental Commitment Requirements The following table includes the Project-specific environmental commitments as written in the ROD, with minor modifications for clarification purposes. As it relates to these Technical Provisions, references to freeway, project, South Mountain Freeway, proposed action, proposed freeway, and Selected Alternative mean the Project, and references to contractor mean Developer. Developer shall comply with and perform all of the contractor and ADOT requirements, including the ADOT obligations, commitments, and responsibilities, identified in the following table, except to the extent of those requirements that are specifically identified in the third column, entitled “Description of ADOT Responsibilities,” which are not delegated to Developer.

  • Exceptional Access to Thick Registration Data In case of a registrar failure, deaccreditation, court order, etc. that prompts the temporary or definitive transfer of its domain names to another registrar, at the request of ICANN, Registry Operator will provide ICANN with up-­‐to-­‐date data for the domain names of the losing registrar. The data will be provided in the format specified in Specification 2 for Data Escrow. The file will only contain data related to the domain names of the losing registrar. Registry Operator will provide the data as soon as commercially practicable, but in no event later than five (5) calendar days following ICANN’s request. Unless otherwise agreed by Registry Operator and ICANN, the file will be made available for download by ICANN in the same manner as the data specified in Section 3.1 of this Specification.

  • Files Subject to Florida's Public Records Law Any file, report, record, document, paper, letter, or other material received, generated, maintained or sent by Grantee to Florida Housing or its agent(s) in connection with this agreement is subject to the provisions of Section 119.01- .15, Fla. Stat., as may be amended from time to time (Florida's Public Records Law). Grantee represents and acknowledges that it has read and understands Florida's Public Records Law and agrees to comply with Florida's Public Records Law. If Grantee has questions regarding the application of Chapter 119, Florida Statutes, to Grantee’s duty to provide public records relating to this Agreement, contact the Corporation Clerk at: Corporation Clerk 000 X. Xxxxxxxx Xxxxxx, Xxxxx 0000 Xxxxxxxxxxx, Xxxxxxx 00000-0000 Phone: 000.000.0000 E-mail: Xxxxxxxxxxx.Xxxxx@xxxxxxxxxxxxxx.xxx

  • Verification of the Registration of E - Bidders 6.1. Registration shall subject to verification and approval of the Auctioneer’s website and subject further to bank’s clearance of deposit payment. Please take note that approval from the Auctioneer’s administrator may take at least 1 working day and any improper, incomplete registration or late registration may be rejected at the sole discretion of the Auctioneer. Neither the Auctioneer nor its website nor its agents and/or representative bears any responsibility or assumes any liability in the event that the registration of a prospective E-Bidders is rejected and/or delayed for any reason whatsoever. In the event of the registration is rejected, the deposit paid (if cleared by the bank) shall be refunded to the same bank account from which the deposit transfer was made within three (3) working days.

  • Information Transfer and Storage Supplier will use Industry Standard encryption to encrypt Accenture Data that is in transit. Supplier will also use Industry Standard encryption to restrict access to Accenture Data stored on physical media that is transported outside of Supplier facilities.

Time is Money Join Law Insider Premium to draft better contracts faster.