Common use of Project Cost Clause in Contracts

Project Cost. a. The estimated cost of the Project is $772,280.00. This amount is based upon the Schedule of Financial Assistance in Exhibit "B", Schedule of Financial Assistance, attached and incorporated in this Agreement. The Schedule of Financial Assistance may be modified by execution of an amendment of the Agreement by the Parties. b. The Department agrees to participate in the Project cost up to the maximum amount of $579,210.00 and, additionally the Department’s participation in the Project shall not exceed N/A% of the total cost of the Project, and as more fully described in Exhibit “B". The Department’s participation may be increased or reduced upon a determination of the actual bid amounts of the Project by the execution of an amendment. The Recipient agrees to bear all expenses in excess of the amount of the Department’s participation and any cost overruns or deficits incurred in connection with completion of the Project. c. The Department’s participation in eligible Project costs is subject to, but not limited to: i. Legislative approval of the Department's appropriation request in the work program year that the Project is scheduled to be committed; ii. Approval of all plans, specifications, contracts or other obligating documents and all other terms of this Agreement; and iii. Department approval of the Project scope and budget at the time appropriation authority becomes available.

Appears in 1 contract

Samples: Grant Agreement

AutoNDA by SimpleDocs

Project Cost. a. The estimated cost of the Project is $772,280.002,250,000.00. This amount is based upon the Schedule of Financial Assistance in Exhibit "B", Schedule of Financial Assistance, attached and incorporated in this Agreement. The Schedule of Financial Assistance may be modified by execution of an amendment of the Agreement by the Parties. b. The Department agrees to participate in the Project cost up to the maximum amount of $579,210.00 2,250,000.00 and, additionally the Department’s participation in the Project shall not exceed N/A% 100% of the total cost of the Project, and as more fully described in Exhibit “B". The Department’s participation may be increased or reduced upon a determination of the actual bid amounts of the Project by the execution of an amendment. The Recipient agrees to bear all expenses in excess of the amount of the Department’s participation and any cost overruns or deficits incurred in connection with completion of the Project. c. The Department’s participation in eligible Project costs is subject to, but not limited to: i. Legislative approval of the Department's appropriation request in the work program year that the Project is scheduled to be committed; ii. Approval of all plans, specifications, contracts or other obligating documents and all other terms of this Agreement; and iii. Department approval of the Project scope and budget at the time appropriation authority becomes available.

Appears in 1 contract

Samples: Grant Agreement

Project Cost. a. The estimated cost of the Project is $772,280.002,500,000. This amount is based upon the Schedule of Financial Assistance in Exhibit "B", Schedule of Financial Assistance, attached and incorporated in this Agreement. The Schedule of Financial Assistance may be modified by execution of an amendment of the Agreement by the Parties. b. The Department agrees to participate in the Project cost up to the maximum amount of $579,210.00 2,500,000 and, additionally the Department’s participation in the Project shall not exceed N/A% 100% of the total cost of the Project, and as more fully described in Exhibit “B". The Department’s participation may be increased or reduced upon a determination of the actual bid amounts of the Project by the execution of an amendment. The Recipient agrees to bear all expenses in excess of the amount of the Department’s participation and any cost overruns or deficits incurred in connection with completion of the Project. c. The Department’s participation in eligible Project costs is subject to, but not limited to: i. Legislative approval of the Department's appropriation request in the work program year that the Project is scheduled to be committed; ii. Approval of all plans, specifications, contracts or other obligating documents and all other terms of this Agreement; and iii. Department approval of the Project scope and budget at the time appropriation authority becomes available.

Appears in 1 contract

Samples: State Funded Grant Agreement

Project Cost. a. The estimated cost of the Project is $772,280.003,100,000. This amount is based upon the Schedule of Financial Assistance in Exhibit "B", Schedule of Financial Assistance, attached and incorporated in this Agreement. The Schedule of Financial Assistance may be modified by execution of an amendment of the Agreement by the Parties. b. The Department agrees to participate in the Project cost up to the maximum amount of $579,210.00 3,100,000 and, additionally the Department’s participation in the Project shall not exceed N/A% 100% of the total cost of the Project, and as more fully described in Exhibit “B", Schedule of Financial Assistance. The Department’s participation may be increased or reduced upon a determination of the actual bid amounts of the Project by the execution of an amendment. The Recipient agrees to bear all expenses in excess of the amount of the Department’s participation and any cost overruns or deficits incurred in connection with completion of the Project. c. The Department’s participation in eligible Project costs is subject to, but not limited to: i. Legislative approval of the Department's appropriation request in the work program year that the Project is scheduled to be committed; ii. Approval of all plans, specifications, contracts or other obligating documents and all other terms of this Agreement; and iii. Department approval of the Project scope and budget at the time appropriation authority becomes available.

Appears in 1 contract

Samples: Grant Agreement

Project Cost. a. The estimated cost of the Project is $772,280.00229,950. This amount is based upon the Schedule of Financial Assistance in Exhibit "B", Schedule of Financial Assistance, attached and incorporated in this Agreement. The Schedule of Financial Assistance may be modified by execution of an amendment of the Agreement by the Parties. b. The Department agrees to participate in the Project cost up to the maximum amount of $579,210.00 229,950 and, additionally the Department’s participation in the Project shall not exceed N/A% of the total cost of the Project, and as more fully described in Exhibit “B", Schedule of Financial Assistance. The Department’s participation may be increased or reduced upon a determination of the actual bid amounts of the Project by the execution of an amendment. The Recipient agrees to bear all expenses in excess of the amount of the Department’s participation and any cost overruns or deficits incurred in connection with completion of the Project. c. The Department’s participation in eligible Project costs is subject to, but not limited to: i. Legislative approval of the Department's appropriation request in the work program year that the Project is scheduled to be committed; ii. Approval of all plans, specifications, contracts or other obligating documents and all other terms of this Agreement; and iii. Department approval of the Project scope and budget at the time appropriation authority becomes available.

Appears in 1 contract

Samples: Grant Agreement

Project Cost. a. The estimated cost of the Project is $772,280.00520,000.00. This amount is based upon the Schedule of Financial Assistance in Exhibit "B", Schedule of Financial Assistance, attached and incorporated in this Agreement. The Schedule of Financial Assistance may be modified by execution of an amendment of the Agreement by the Parties. b. The Department agrees to participate in the Project cost up to the maximum amount of $579,210.00 370,000.00 and, additionally the Department’s participation in the Project shall not exceed N/A% of the total cost of the Project, and as more fully described in Exhibit “B". The Department’s participation may be increased or reduced upon a determination of the actual bid amounts of the Project by the execution of an amendment. The Recipient agrees to bear all expenses in excess of the amount of the Department’s participation and any cost overruns or deficits incurred in connection with completion of the Project. c. The Department’s participation in eligible Project costs is subject to, but not limited to: i. Legislative approval of the Department's appropriation request in the work program year that the Project is scheduled to be committed; ii. Approval of all plans, specifications, contracts or other obligating documents and all other terms of this Agreement; and iii. Department approval of the Project scope and budget at the time appropriation authority becomes available.

Appears in 1 contract

Samples: Grant Agreement

Project Cost. a. The estimated cost of the Project is $772,280.00805,260. This amount is based upon the Schedule of Financial Assistance in Exhibit "B", Schedule of Financial Assistance, attached and incorporated in this Agreement. The Schedule of Financial Assistance may be modified by execution of an amendment of the Agreement by the Parties. b. The Department agrees to participate in the Project cost up to the maximum amount of $579,210.00 784,760 and, additionally the Department’s participation in the Project shall not exceed N/A% 100% of the total cost of the Project, and as more fully described in Exhibit “B". The Department’s participation may be increased or reduced upon a determination of the actual bid amounts of the Project by the execution of an amendment. The Recipient agrees to bear all expenses in excess of the amount of the Department’s participation and any cost overruns or deficits incurred in connection with completion of the Project. c. The Department’s participation in eligible Project costs is subject to, but not limited to: i. Legislative approval of the Department's appropriation request in the work program year that the Project is scheduled to be committed; ii. Approval of all plans, specifications, contracts or other obligating documents and all other terms of this Agreement; and iii. Department approval of the Project scope and budget at the time appropriation authority becomes available.

Appears in 1 contract

Samples: Grant Agreement

Project Cost. a. The estimated cost of the Project is $772,280.001,138,738.00. This amount is based upon the Schedule of Financial Assistance in Exhibit "B", Schedule of Financial Assistance, attached and incorporated in this Agreement. The Schedule of Financial Assistance may be modified by execution of an amendment of the Agreement by the Parties. b. The Department agrees to participate in the Project cost up to the maximum amount of $579,210.00 569,369.00 and, additionally the Department’s participation in the Project shall not exceed N/A% of the total cost of the Project, and as more fully described in Exhibit “B". The Department’s participation may be increased or reduced upon a determination of the actual bid amounts of the Project by the execution of an amendment. The Recipient agrees to bear all expenses in excess of the amount of the Department’s participation and any cost overruns or deficits incurred in connection with completion of the Project. c. The Department’s participation in eligible Project costs is subject to, but not limited to: i. Legislative approval of the Department's appropriation request in the work program year that the Project is scheduled to be committed; ii. Approval of all plans, specifications, contracts or other obligating documents and all other terms of this Agreement; and iii. Department approval of the Project scope and budget at the time appropriation authority becomes available.

Appears in 1 contract

Samples: Grant Agreement

Project Cost. a. The estimated cost of the Project is $772,280.0050,000. This amount is based upon the Schedule of Financial Assistance in Exhibit "B", Schedule of Financial Assistance, attached and incorporated in this Agreement. The Schedule of Financial Assistance may be modified by execution of an amendment of the Agreement by the Parties. b. The Department agrees to participate in the Project cost up to the maximum amount of $579,210.00 25,000 and, additionally the Department’s participation in the Project shall not exceed N/A% 50% of the total cost of the Project, and as more fully described in Exhibit “B", Schedule of Financial Assistance. The Department’s participation may be increased or reduced upon a determination of the actual bid amounts of the Project by the execution of an amendment. The Recipient agrees to bear all expenses in excess of the amount of the Department’s participation and any cost overruns or deficits incurred in connection with completion of the Project. c. The Department’s participation in eligible Project costs is subject to, but not limited to: i. Legislative approval of the Department's appropriation request in the work program year that the Project is scheduled to be committed; ii. Approval of all plans, specifications, contracts or other obligating documents and all other terms of this Agreement; and iii. Department approval of the Project scope and budget at the time appropriation authority becomes available.

Appears in 1 contract

Samples: Grant Agreement

Project Cost. a. The estimated cost of the Project is $772,280.001,107,778.00. This amount is based upon the Schedule of Financial Assistance in Exhibit "B", Schedule of Financial Assistance, attached and incorporated in this Agreement. The Schedule of Financial Assistance may be modified by execution of an amendment of the Agreement by the Parties. b. The Department agrees to participate in the Project cost up to the maximum amount of $579,210.00 300,000.00 and, additionally the Department’s participation in the Project shall not exceed N/A% of the total cost of the Project, and as more fully described in Exhibit “B", Schedule of Financial Assistance. The Department’s participation may be increased or reduced upon a determination of the actual bid amounts of the Project by the execution of an amendment. The Recipient agrees to bear all expenses in excess of the amount of the Department’s participation and any cost overruns or deficits incurred in connection with completion of the Project. c. The Department’s participation in eligible Project costs is subject to, but not limited to: i. Legislative approval of the Department's appropriation request in the work program year that the Project is scheduled to be committed; ii. Approval of all plans, specifications, contracts or other obligating documents and all other terms of this Agreement; and iii. Department approval of the Project scope and budget at the time appropriation authority becomes available.

Appears in 1 contract

Samples: Grant Agreement

Project Cost. a. The estimated cost of the Project is $772,280.001,200,000.00. This amount is based upon the Schedule of Financial Assistance in Exhibit "B", Schedule of Financial Assistance, attached and incorporated in this Agreement. The Schedule of Financial Assistance may be modified by execution of an amendment of the Agreement by the Parties. b. The Department agrees to participate in the Project cost up to the maximum amount of $579,210.00 600,000.00 and, additionally the Department’s participation in the Project shall not exceed N/A% 50% of the total cost of the Project, and as more fully described in Exhibit “B". The Department’s participation may be increased or reduced upon a determination of the actual bid amounts of the Project by the execution of an amendment. The Recipient agrees to bear all expenses in excess of the amount of the Department’s participation and any cost overruns or deficits incurred in connection with completion of the Project. c. The Department’s participation in eligible Project costs is subject to, but not limited to: i. Legislative approval of the Department's appropriation request in the work program year that the Project is scheduled to be committed; ii. Approval of all plans, specifications, contracts or other obligating documents and all other terms of this Agreement; and iii. Department approval of the Project scope and budget at the time appropriation authority becomes available.

Appears in 1 contract

Samples: Grant Agreement

AutoNDA by SimpleDocs

Project Cost. a. The estimated cost of the Project is $772,280.00540,000. This amount is based upon the Schedule of Financial Assistance in Exhibit "B", Schedule of Financial Assistance, attached and incorporated in this Agreement. The Schedule of Financial Assistance may be modified by execution of an amendment of the Agreement by the Parties. b. The Department agrees to participate in the Project cost up to the maximum amount of $579,210.00 270,000 and, additionally the Department’s participation in the Project shall not exceed N/A% 50% of the total cost of the Project, and as more fully described in Exhibit “B". The Department’s participation may be increased or reduced upon a determination of the actual bid amounts of the Project by the execution of an amendment. The Recipient agrees to bear all expenses in excess of the amount of the Department’s participation and any cost overruns or deficits incurred in connection with completion of the Project. c. The Department’s participation in eligible Project costs is subject to, but not limited to: i. Legislative approval of the Department's appropriation request in the work program year that the Project is scheduled to be committed; ii. Approval of all plans, specifications, contracts or other obligating documents and all other terms of this Agreement; and iii. Department approval of the Project scope and budget at the time appropriation authority becomes available.

Appears in 1 contract

Samples: Grant Agreement

Project Cost. a. The estimated cost of the Project is $772,280.005,469,395.00. This amount is based upon the Schedule of Financial Assistance in Exhibit "B", Schedule of Financial Assistance, attached and incorporated in this Agreement. The Schedule of Financial Assistance may be modified by execution of an amendment of the Agreement by the Parties. b. The Department agrees to participate in the Project cost up to the maximum amount of $579,210.00 5,469,395.00 and, additionally the Department’s participation in the Project shall not exceed Nn/A% a% of the total cost of the Project, and as more fully described in Exhibit “B", Schedule of Financial Assistance. The Department’s participation may be increased or reduced upon a determination of the actual bid amounts of the Project by the execution of an amendment. The Recipient agrees to bear all expenses in excess of the amount of the Department’s participation and any cost overruns or deficits incurred in connection with completion of the Project. c. The Department’s participation in eligible Project costs is subject to, but not limited to: i. Legislative approval of the Department's appropriation request in the work program year that the Project is scheduled to be committed; ii. Approval of all plans, specifications, contracts or other obligating documents and all other terms of this Agreement; and iii. Department approval of the Project scope and budget at the time appropriation authority becomes available.

Appears in 1 contract

Samples: Construction Agreement

Project Cost. a. The estimated cost of the Project is $772,280.001,086,875. This amount is based upon the Schedule of Financial Assistance in Exhibit "B", Schedule of Financial Assistance, attached and incorporated in this Agreement. The Schedule of Financial Assistance may be modified by execution of an amendment of the Agreement by the Parties. b. The Department agrees to participate in the Project cost up to the maximum amount of $579,210.00 815,156 and, additionally the Department’s participation in the Project shall not exceed N/A% 75% of the total cost of the Project, and as more fully described in Exhibit “B". The Department’s participation may be increased or reduced upon a determination of the actual bid amounts of the Project by the execution of an amendment. The Recipient agrees to bear all expenses in excess of the amount of the Department’s participation and any cost overruns or deficits incurred in connection with completion of the Project. c. The Department’s participation in eligible Project costs is subject to, but not limited to: i. Legislative approval of the Department's appropriation request in the work program year that the Project is scheduled to be committed; ii. Approval of all plans, specifications, contracts or other obligating documents and all other terms of this Agreement; and iii. Department approval of the Project scope and budget at the time appropriation authority becomes available.

Appears in 1 contract

Samples: Grant Agreement

Project Cost. a. The estimated cost of the Project is $772,280.00936,152.00. This amount is based upon the Schedule of Financial Assistance in Exhibit "B", Schedule of Financial Assistance, attached and incorporated in this Agreement. The Schedule of Financial Assistance may be modified by execution of an amendment of the Agreement by the Parties. b. The Department agrees to participate in the Project cost up to the maximum amount of $579,210.00 936,152.00 and, additionally the Department’s participation in the Project shall not exceed N/A% 100% of the total cost of the Project, and as more fully described in Exhibit “B". The Department’s participation may be increased or reduced upon a determination of the actual bid amounts of the Project by the execution of an amendment. The Recipient agrees to bear all expenses in excess of the amount of the Department’s participation and any cost overruns or deficits incurred in connection with completion of the Project. c. The Department’s participation in eligible Project costs is subject to, but not limited to: i. Legislative approval of the Department's appropriation request in the work program year that the Project is scheduled to be committed; ii. Approval of all plans, specifications, contracts or other obligating documents and all other terms of this Agreement; and iii. Department approval of the Project scope and budget at the time appropriation authority becomes available.

Appears in 1 contract

Samples: State Funded Grant Supplemental Agreement

Project Cost. a. The estimated cost of the Project is $772,280.002,000,000.00. This amount is based upon the Schedule of Financial Assistance in Exhibit "B", Schedule of Financial Assistance, attached and incorporated in this Agreement. The Schedule of Financial Assistance may be modified by execution of an amendment of the Agreement by the Parties. b. The Department agrees to participate in the Project cost up to the maximum amount of $579,210.00 1,000,000.00 and, additionally the Department’s participation in the Project shall not exceed N/A% of the total cost of the Project, and as more fully described in Exhibit “B". The Department’s participation may be increased or reduced upon a determination of the actual bid amounts of the Project by the execution of an amendment. The Recipient agrees to bear all expenses in excess of the amount of the Department’s participation and any cost overruns or deficits incurred in connection with completion of the Project. c. The Department’s participation in eligible Project costs is subject to, but not limited to: i. Legislative approval of the Department's appropriation request in the work program year that the Project is scheduled to be committed; ii. Approval of all plans, specifications, contracts or other obligating documents and all other terms of this Agreement; and iii. Department approval of the Project scope and budget at the time appropriation authority becomes available.

Appears in 1 contract

Samples: Grant Agreement

Project Cost. a. The estimated cost of the Project is $772,280.00250,000. This amount is based upon the Schedule of Financial Assistance in Exhibit "B", Schedule of Financial Assistance, attached and incorporated in this Agreement. The Schedule of Financial Assistance may be modified by execution of an amendment of the Agreement by the Parties. b. The Department agrees to participate in the Project cost up to the maximum amount of $579,210.00 250,000 and, additionally the Department’s participation in the Project shall not exceed N/A% 100% of the total cost of the Project, and as more fully described in Exhibit “B", Schedule of Financial Assistance. The Department’s participation may be increased or reduced upon a determination of the actual bid amounts of the Project by the execution of an amendment. The Recipient agrees to bear all expenses in excess of the amount of the Department’s participation and any cost overruns or deficits incurred in connection with completion of the Project. c. The Department’s participation in eligible Project costs is subject to, but not limited to: i. Legislative approval of the Department's appropriation request in the work program year that the Project is scheduled to be committed; ii. Approval of all plans, specifications, contracts or other obligating documents and all other terms of this Agreement; and iii. Department approval of the Project scope and budget at the time appropriation authority becomes available.

Appears in 1 contract

Samples: Grant Agreement

Project Cost. a. The estimated cost of the Project is $772,280.001,000,000.00. This amount is based upon the Schedule of Financial Assistance in Exhibit "B", Schedule of Financial Assistance, attached and incorporated in this Agreement. The Schedule of Financial Assistance may be modified by execution of an amendment of the Agreement by the Parties. b. The Department agrees to participate in the Project cost up to the maximum amount of $579,210.00 1,000,000.00 and, additionally the Department’s participation in the Project shall not exceed N/A% 100% of the total cost of the Project, and as more fully described in Exhibit “B". The Department’s participation may be increased or reduced upon a determination of the actual bid amounts of the Project by the execution of an amendment. The Recipient agrees to bear all expenses in excess of the amount of the Department’s participation and any cost overruns or deficits incurred in connection with completion of the Project. c. The Department’s participation in eligible Project costs is subject to, but not limited to: i. Legislative approval of the Department's appropriation request in the work program year that the Project is scheduled to be committed; ii. Approval of all plans, specifications, contracts or other obligating documents and all other terms of this Agreement; and iii. Department approval of the Project scope and budget at the time appropriation authority becomes available.

Appears in 1 contract

Samples: State Funded Grant Agreement

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!