Common use of Project Reports; Completion Report Clause in Contracts

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than one (1) month after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 6 contracts

Samples: Trust Fund Grant Agreement, Grant Agreement, Global Environment Facility Trust Fund Grant Agreement

AutoNDA by SimpleDocs

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of the indicators agreed with the World Bank. Each Project Report shall cover the period of one six (16) calendar semestermonths, and shall be furnished to the World Bank not later than one forty five (145) month days after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 3 contracts

Samples: Trust Fund Grant Agreement, Trust Fund Grant Agreement, Trust Fund Grant Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of the indicators agreed with acceptable to the World Bank. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than one (1) month after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) three months after the Closing Date.

Appears in 2 contracts

Samples: Grant Agreement, Avian and Human Influenza Facility Grant Agreement

Project Reports; Completion Report. 1. The Recipient Borrower shall monitor and evaluate the progress of Part B of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of the indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than one (1) month after the end of the period covered by such report. 2. The Recipient Borrower shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 2 contracts

Samples: Clean Technology Fund Loan Agreement, Loan Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of the indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than forty five (45) days one (1) month after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date. In order to assist the Recipient in preparing the Completion Report, the Recipient shall employ consultants in accordance with the provisions of Section III of this Schedule.

Appears in 2 contracts

Samples: Grant Agreement, Global Environment Facility Grant Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the World Bank not later than one forty five (145) month days after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 2 contracts

Samples: Grant Agreement, Grant Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with acceptable to the World Bank. Each Project Report shall cover the period of one (1) calendar semesterFiscal Year, and shall be furnished to the World Bank not later than one four (14) month months after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 2 contracts

Samples: Grant Agreement, Grant Agreement

Project Reports; Completion Report. 1. The Through the Project Implementing Entity the Recipient shall shall: (a) monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of the indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than one forty five (145) month days after the end of the period covered by such report. 2. The Recipient shall ; and (b) prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished Conditions and furnish it to the World Bank not later than six (6) months after the Closing Date.

Appears in 2 contracts

Samples: Grant Agreement, Grant Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with acceptable to the World Bank. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than one sixty (160) month days after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date. In order to assist the Recipient in preparing the Completion Report, the Recipient shall employ consultants in accordance with the provisions of Section III of this Schedule.

Appears in 2 contracts

Samples: Trust Fund Grant Agreement, Global Environment Facility Trust Fund Grant Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of the indicators agreed with set forth in the World BankOperational Manual. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the World Bank not later than one (1) month forty five days after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 2 contracts

Samples: Grant Agreement, Grant Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of the indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the World Bank not later than one (1) month after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 2 contracts

Samples: Grant Agreement, World Bank Iraq Trust Fund Grant Agreement

Project Reports; Completion Report. 1. The Recipient Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of the indicators agreed with the World BankBank and set forth in the Operational Manual. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than one (1) month three months after the end of the period covered by such report. 2. The Recipient Borrower shall prepare the Completion Report in accordance with the provisions of Section 2.06 (c) of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 2 contracts

Samples: Clean Technology Fund Loan Agreement, Clean Technology Fund Loan Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of the indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than one (1) month after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six three (63) months after the Closing Date.

Appears in 2 contracts

Samples: Grant Agreement, Global Environment Facility Grant Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with acceptable to the World Bank. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the World Bank not later than one (1) month after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 1 contract

Samples: Trust Fund Grant Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the World Bank not later than one (1) month after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 1 contract

Samples: Grant Agreement

Project Reports; Completion Report. 1. The Recipient Borrower shall monitor and evaluate the progress of Part A of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of the indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than one (1) month after the end of the period covered by such report. 2. The Recipient Borrower shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 1 contract

Samples: Clean Technology Fund Loan Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with the World BankIndicators. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than one (1) two month after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) four months after the Closing Date.

Appears in 1 contract

Samples: Grant Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the World Bank not later than one forty five (145) month days after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months month after the Closing Date.

Appears in 1 contract

Samples: Grant Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with acceptable to the World Bank. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than one (1) month after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 1 contract

Samples: Grant Agreement

AutoNDA by SimpleDocs

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semesterFiscal Year trimester, and shall be furnished to the World Bank not later than one forty-five (145) month days after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 1 contract

Samples: Food Price Crisis Response Trust Fund Grant Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the World Bank not later than one (1) month after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 1 contract

Samples: Trust Fund Grant Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than one (1) month after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 1 contract

Samples: Grant Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than one sixty (160) month days after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 1 contract

Samples: Trust Fund Grant Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with acceptable to the World Bank. Each Project Report shall cover the period of one six (16) calendar semester, months and shall be furnished to the World Bank not later than one (1) month after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 1 contract

Samples: Grant Agreement

Project Reports; Completion Report. 1. The Recipient Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with acceptable to the World Bank. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the World Bank not later than one forty-five (145) month days after the end of the period covered by such report. 2. The Recipient Borrower shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 1 contract

Samples: Loan Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of the indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than one forty-five (145) month days after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 1 contract

Samples: Grant Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of the indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the World Bank not later than one (1) month after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 1 contract

Samples: Grant Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with the World BankIndicators. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than one (1) month after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 1 contract

Samples: Trust Fund Grant Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis and of indicators agreed with acceptable to the World Bank. Each Project Report shall cover the period of one (1) calendar semestersix months, and shall be furnished to the World Bank not later than one (1) month after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 1 contract

Samples: Global Environment Facility Grant Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with acceptable to the World Bank. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than one sixty (160) month days after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 1 contract

Samples: Global Environment Facility Grant Agreement

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!