Common use of Provisional Interconnection Service Clause in Contracts

Provisional Interconnection Service. Upon the request of Interconnection Customer, and prior to completion of requisite Interconnection Facilities, Network Upgrades, Local Upgrades, or system protection facilities Interconnection Customer may request limited Interconnection Service at the discretion of Transmission Provider based upon an evaluation that will consider the results of available studies, which terms shall be memorialized in the Interconnection Service Agreement. Consistent with Tariff, Part VI, Subpart B, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted with the Commission. Transmission Provider shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer interconnects without modifications to the Generating Facility or the Transmission System. Transmission Provider shall determine whether any Interconnection Facilities, Network Upgrades, Local Upgrades, or system protection facilities that are necessary to meet the requirements of NERC, or any applicable Regional Entity for the interconnection of a new, modified and/or expanded Generating Facility are in place prior to the commencement of Interconnection Service from the Generating Facility. Where available studies indicate that such Interconnection Facilities, Network Upgrades, Local Upgrades, and/or system protection facilities that are required for the interconnection of a new, modified and/or expanded Generating Facility are not currently in place, Transmission Provider will perform a study, at the Interconnection Customer’s expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Generating Facility shall be studied and updated annually and at the Interconnection Customer’s expense. The results will be communicated to the Interconnection Customer in writing upon completion of the study. Interconnection Customer assumes all risk and liabilities with respect to the Provisional Interconnection Service, including changes in output limits and Interconnection Facilities, Network Upgrades, Local Upgrades, and/or system protection facilities cost responsibilities.

Appears in 62 contracts

Samples: Service Agreement, Service Agreement, Service Agreement

AutoNDA by SimpleDocs

Provisional Interconnection Service. Upon the request of Interconnection Customer, and prior to completion of requisite Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, or system protection facilities System Protection Facilities Transmission Provider may execute a Provisional Generator Interconnection Agreement or Interconnection Customer may request the filing of an unexecuted Provisional Generator Interconnection Agreement with the Interconnection Customer for limited Interconnection Service interconnection service at the discretion of Transmission Provider based upon an evaluation that will consider the results of available studies, which terms shall be memorialized in the Interconnection Service Agreement. Consistent with Tariff, Part VI, Subpart B, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted with the Commission. Transmission Provider shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer interconnects without modifications to the Generating Facility or the Transmission SystemProvider’s system. Transmission Provider shall determine whether any Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, or system protection facilities System Protection Facilities that are necessary to meet the requirements of NERC, or any applicable Regional Entity for the interconnection of a new, modified and/or expanded Generating Facility are in place prior to the commencement of Interconnection Service interconnection service from the Generating Facility. Where available studies indicate that such Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, and/or system protection facilities System Protection Facilities that are required for the interconnection of a new, modified and/or expanded Generating Facility are not currently in place, Transmission Provider will perform a study, at the Interconnection Customer’s expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Generating Facility in the Provisional Generator Interconnection Agreement shall be studied and updated annually and at the Interconnection Customer’s expense. The results will be communicated to the Interconnection Customer in writing upon completion of the studyon a quarterly basis. Interconnection Customer assumes all risk and liabilities with respect to changes between the Provisional Generator Interconnection ServiceAgreement and the Generator Interconnection Agreement, including changes in output limits and Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, and/or system protection facilities System Protection Facilities cost responsibilities.

Appears in 25 contracts

Samples: Generator Interconnection Agreement, Generator Interconnection Agreement, Generator Interconnection Agreement

Provisional Interconnection Service. Upon Prior to the request completion of the Large Facility Interconnection Customer, Procedures and prior to completion of requisite Interconnection Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Distribution Upgrades, or system protection facilities Interconnection Customer System Protection Facilities, the Developer may request limited Interconnection Service at the discretion of Transmission Provider based upon an evaluation that will consider the results of available studiesfor Provisional Interconnection Service. NYISO, which terms shall be memorialized in the Interconnection Service Agreement. Consistent with Tariff, Part VI, Subpart B, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted conjunction with the Commission. Connecting Transmission Provider Owner, shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer the Developer interconnects without modifications to the Large Generating Facility or the New York State Transmission SystemSystem (or Distribution System as applicable). NYISO, in conjunction with the Connecting Transmission Provider Owner, shall determine whether any Interconnection Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, or system protection facilities that System Protection Facilities, which are necessary to meet the requirements of NERCApplicable Laws and Regulations, or any applicable Regional Entity for the interconnection of a newApplicable Reliability Standards, modified and/or expanded Generating Facility and Good Utility Practice, are in place prior to the commencement of Interconnection Service interconnection service from the Generating Large Facility. Where available studies indicate that such Interconnection the Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, and/or system protection facilities that or System Protection Facilities are required for the interconnection of a new, modified and/or expanded Generating Large Facility but such facilities are not currently in place, NYISO, in conjunction with the Connecting Transmission Provider Owner, will perform a study, at the Interconnection CustomerDeveloper’s expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Generating Large Facility in the Provisional Large Facility Interconnection Agreement shall be studied studied, at the Developer’s expense, and updated annually and at the Interconnection Customer’s expenseannually. The results will be communicated NYISO shall issue the study’s findings in writing to the Developer and Connecting Transmission Owner(s). Following a determination by NYISO, in conjunction with the Connecting Transmission Owner, that the Developer may reliably provide Provisional Interconnection Customer in writing upon completion Service, NYISO shall tender to the Developer and Connecting Transmission Owner, a Provisional Large Facility Interconnection Agreement. NYISO, Developer, and Connecting Transmission Owner may execute the Provisional Large Facility Interconnection Agreement, or the Developer may request the filing of an unexecuted Provisional Large Facility Interconnection Agreement with the studyCommission. Interconnection Customer assumes The Developer shall assume all risk and liabilities with respect to changes between the Provisional Large Facility Interconnection ServiceAgreement and the Large Generator Interconnection Agreement, including changes in output limits and Interconnection the cost responsibilities for the Attachment Facilities, Network UpgradesSystem Upgrade Facilities, Local System Deliverability Upgrades, and/or system protection facilities cost responsibilitiesSystem Protection Facilities.

Appears in 23 contracts

Samples: , and Construction Agreement, Standard Large Generator Interconnection Agreement, Large Generator Interconnection Agreement

Provisional Interconnection Service. Upon Prior to the request completion of the Large Facility Interconnection Customer, Procedures and prior to completion of requisite Interconnection Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Distribution Upgrades, or system protection facilities Interconnection Customer System Protection Facilities, the Developer may request limited Interconnection Service at the discretion of Transmission Provider based upon an evaluation that will consider the results of available studiesfor Provisional Interconnection Service. NYISO, which terms shall be memorialized in the Interconnection Service Agreement. Consistent with Tariff, Part VI, Subpart B, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted conjunction with the Commission. Connecting Transmission Provider Owner, shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer the Developer interconnects without modifications to the Large Generating Facility or the New York State Transmission SystemSystem (or Distribution System as applicable). NYISO, in conjunction with the Connecting Transmission Provider Owner, shall determine whether any Interconnection Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, or system protection facilities that System Protection Facilities, which are necessary to meet the requirements of NERCApplicable Laws and Regulations, or any applicable Regional Entity for the interconnection of a newApplicable Reliability Standards, modified and/or expanded Generating Facility and Good Utility Practice, are in place prior to the commencement of Interconnection Service interconnection service from the Generating Large Facility. Where available studies indicate that such Interconnection the Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, and/or system protection facilities that or System Protection Facilities are required for the interconnection of a new, modified and/or expanded Generating Large Facility but such facilities are not currently in place, NYISO, in conjunction with the Connecting Transmission Provider Owner, will perform a study, at the Interconnection CustomerDeveloper’s expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Generating Large Facility in the Provisional Large Facility Interconnection Agreement shall be studied studied, at the Developer’s expense, and updated annually and at the Interconnection Customer’s expenseannually. The results will be communicated NYISO shall issue the study’s findings in writing to the Developer and Connecting Transmission Owner(s). Following a determination by XXXXX, in conjunction with the Connecting Transmission Owner, that the Developer may reliably provide Provisional Interconnection Customer in writing upon completion Service, NYISO shall tender to the Developer and Connecting Transmission Owner, a Provisional Large Facility Interconnection Agreement. NYISO, Developer, and Connecting Transmission Owner may execute the Provisional Large Facility Interconnection Agreement, or the Developer may request the filing of an unexecuted Provisional Large Facility Interconnection Agreement with the studyCommission. Interconnection Customer assumes The Developer shall assume all risk and liabilities with respect to changes between the Provisional Large Facility Interconnection ServiceAgreement and the Large Generator Interconnection Agreement, including changes in output limits and Interconnection the cost responsibilities for the Attachment Facilities, Network UpgradesSystem Upgrade Facilities, Local System Deliverability Upgrades, and/or system protection facilities cost responsibilitiesSystem Protection Facilities.

Appears in 20 contracts

Samples: Study Agreement, , and Construction Agreement, Service Agreement

Provisional Interconnection Service. Upon the request of Interconnection Customer, and prior to completion of requisite Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, or system protection facilities System Protection Facilities, System Operator and the Interconnecting Transmission Owner may execute a Provisional Large Generator Interconnection Agreement or Interconnection Customer may request limited the filing of an unexecuted Provisional Large Generator Interconnection Agreement with the Interconnection Customer for Provisional Interconnection Service at the discretion of System Operator and Interconnecting Transmission Provider Owner based upon an evaluation that will consider the results of available studies, which terms shall be memorialized in the Interconnection Service Agreement. Consistent with Tariff, Part VI, Subpart B, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted with the Commission. System Operator and Interconnecting Transmission Provider Owner shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer interconnects without modifications to the Large Generating Facility or the New England Transmission System. System Operator and Interconnecting Transmission Provider Owner shall determine whether any Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, or system protection facilities System Protection Facilities that are necessary to meet the requirements of NERC, or any applicable Regional Entity for the interconnection of a new, modified and/or expanded Large Generating Facility are in place prior to the commencement of Interconnection Service from the Large Generating Facility. Where available studies indicate that such Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, and/or system protection facilities System Protection Facilities that are required for the interconnection of a new, modified and/or expanded Large Generating Facility are not currently in place, Transmission Provider System Operator will perform a study, at the Interconnection Customer’s expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Large Generating Facility in the Provisional Large Generator Interconnection Agreement shall be studied and updated annually each time the conditions assumed in the studies supporting the Provisional Interconnection Service change. Provisional Interconnection Service is an optional procedure and at it will not alter the Interconnection Customer’s expense. The results will be communicated to the Interconnection Customer in writing upon completion of the studyQueue Position and associated cost and upgrade responsibilities. Interconnection Customer assumes all risk and liabilities with respect to changes between the Provisional Large Generator Interconnection ServiceAgreement and the Large Generator Interconnection Agreement, including changes in output limits and Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, and/or system protection facilities System Protection Facilities cost responsibilities.

Appears in 13 contracts

Samples: Interconnection Agreement, Via Electronic Filing, Interconnection Agreement

Provisional Interconnection Service. Upon the request of Interconnection CustomerProject Developer, and prior to completion of requisite Interconnection Facilities, Distribution Upgrades, Network Upgrades, Local Stand Alone Network Upgrades, or system protection facilities Interconnection Customer Project Developer may request limited Interconnection Service at the discretion of Transmission Provider based upon an evaluation that will consider the results of available studies, which terms shall be memorialized in the Generation Interconnection Service Agreement. Consistent with Agreement to be tendered by Transmission Provider to Project subject to the execution timelines and provisions set forth in Tariff, Part VI, Subpart BIX, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted with the Commission1. Transmission Provider shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer Project Developer interconnects without modifications to the Generating Facility or Merchant Transmission Facility or the Transmission System. Transmission Provider shall determine whether any Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, or Stand Alone Network Upgrades, or system protection facilities that are necessary to meet the requirements of NERC, or any applicable Regional Entity for the interconnection of a new, modified and/or expanded Generating Facility or Merchant Transmission Facility are in place prior to the commencement of Interconnection Service from the Generating Facility or Merchant Transmission Facility. Where available studies indicate that such Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, or Stand Alone Network Upgrades, and/or system protection facilities that are required for the interconnection of a new, modified and/or expanded Generating Facility or Merchant Transmission Facility are not currently in place, Transmission Provider will perform a study, at the Interconnection CustomerProject Developer’s expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Generating Facility or Merchant Transmission Facility shall be studied and updated annually and at the Interconnection CustomerProject Developer’s expense. The results will be communicated to the Interconnection Customer Project Developer in writing upon completion of the study. Interconnection Customer Project Developer assumes all risk and liabilities with respect to the Provisional Interconnection Service, including changes in output limits and Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, or Stand Alone Network Upgrades, and/or system protection facilities cost responsibilities.

Appears in 10 contracts

Samples: Generation Interconnection Agreement, Generation Interconnection Agreement, Generation Interconnection Agreement

Provisional Interconnection Service. Upon Subject to the request requirements of Section 30.11.4 of this Attachment X, prior to the completion of the Large Facility Interconnection Customer, Procedures and prior to completion of requisite Interconnection Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Distribution Upgrades, or system protection facilities Interconnection Customer System Protection Facilities, the Developer may request limited Interconnection Service at the discretion of Transmission Provider based upon an evaluation that will consider the results of available studiesfor Provisional Interconnection Service. The ISO, which terms shall be memorialized in the Interconnection Service Agreement. Consistent with Tariff, Part VI, Subpart B, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted conjunction with the Commission. Connecting Transmission Provider Owner(s), shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer the Developer interconnects without modifications to the Generating Large Facility or the New York State Transmission SystemSystem (or Distribution System as applicable). The ISO, in conjunction with the Connecting Transmission Provider Owner, shall determine whether any Interconnection Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, or system protection facilities that System Protection Facilities, which are necessary to meet the requirements of NERCApplicable Laws and Regulations, or any applicable Regional Entity for the interconnection of a newApplicable Reliability Standards, modified and/or expanded Generating Facility and Good Utility Practice, are in place prior to the commencement of Interconnection Service interconnection service from the Generating Large Facility. Where available studies indicate that such Interconnection the Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, and/or system protection facilities that or System Protection Facilities are required for the interconnection of a new, modified and/or expanded Generating Large Facility but such facilities are not currently in place, the ISO, in conjunction with the Connecting Transmission Provider Owner, will perform a study, at the Interconnection CustomerDeveloper’s expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Generating Large Facility in the Provisional Large Facility Interconnection Agreement shall be studied studied, at the Developer’s expense, and updated annually and at the Interconnection Customer’s expenseannually. The results will be communicated NYISO shall issue the study’s findings in writing to the Developer and Connecting Transmission Owner(s). Following a determination by the ISO, in conjunction with the Connecting Transmission Owner, that the Developer may reliably provide Provisional Interconnection Customer in writing upon completion Service, the ISO shall tender to the Developer and Connecting Transmission Owner, a Provisional Large Facility Interconnection Agreement. The ISO, Developer, and Connecting Transmission Owner may execute the Provisional Large Facility Interconnection Agreement, or the Developer may request the filing of an unexecuted Provisional Large Faciltiy Interconnection Agreement with the studyCommission. Interconnection Customer assumes The Developer shall assume all risk and liabilities with respect to changes between the Provisional Large Facility Interconnection ServiceAgreement and the Large Generator Interconnection Agreement, including changes in output limits and Interconnection the cost responsibilities for the Attachment Facilities, Network UpgradesSystem Upgrade Facilities, Local System Deliverability Upgrades, and/or system protection facilities cost responsibilitiesSystem Protection Facilities.

Appears in 9 contracts

Samples: Standard Large Generator Interconnection Agreement, Large Generator Interconnection Agreement, Interconnection Agreement

Provisional Interconnection Service. Upon Subject to the request requirements of Section 30.11.4 of this Attachment X, prior to the completion of the Large Facility Interconnection Customer, Procedures and prior to completion of requisite Interconnection Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Distribution Upgrades, or system protection facilities Interconnection Customer System Protection Facilities, the Developer may request limited Interconnection Service at the discretion of Transmission Provider based upon an evaluation that will consider the results of available studiesfor Provisional Interconnection Service. The ISO, which terms shall be memorialized in the Interconnection Service Agreement. Consistent with Tariff, Part VI, Subpart B, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted conjunction with the Commission. Connecting Transmission Provider Owner(s), shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer the Developer interconnects without modifications to the Generating Large Facility or the New York State Transmission SystemSystem (or Distribution System as applicable). The ISO, in conjunction with the Connecting Transmission Provider Owner, shall determine whether any Interconnection Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, or system protection facilities that System Protection Facilities, which are necessary to meet the requirements of NERCApplicable Laws and Regulations, or any applicable Regional Entity for the interconnection of a newApplicable Reliability Standards, modified and/or expanded Generating Facility and Good Utility Practice, are in place prior to the commencement of Interconnection Service interconnection service from the Generating Large Facility. Where available studies indicate that such Interconnection the Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, and/or system protection facilities that or System Protection Facilities are required for the interconnection of a new, modified and/or expanded Generating Large Facility but such facilities are not currently in place, the ISO, in conjunction with the Connecting Transmission Provider Owner, will perform a study, at the Interconnection CustomerDeveloper’s expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Generating Large Facility in the Provisional Large Facility Interconnection Agreement shall be studied studied, at the Developer’s expense, and updated annually and at the Interconnection Customer’s expenseannually. The results will be communicated NYISO shall issue the study’s findings in writing to the Interconnection Customer Developer and Connecting Transmission Owner(s). Following a determination by the ISO, in writing upon completion of conjunction with the study. Interconnection Customer assumes all risk and liabilities with respect to Connecting Transmission Owner, that the Provisional Interconnection Service, including changes in output limits and Interconnection Facilities, Network Upgrades, Local Upgrades, and/or system protection facilities cost responsibilities.Developer may

Appears in 5 contracts

Samples: nyisoviewer.etariff.biz, nyisoviewer.etariff.biz, nyisoviewer.etariff.biz

Provisional Interconnection Service. Upon Prior to the request completion of the Large Facility Interconnection Customer, Procedures and prior to completion of requisite Interconnection Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Distribution Upgrades, or system protection facilities Interconnection Customer System Protection Facilities, the Developer may request limited Interconnection Service at the discretion of Transmission Provider based upon an evaluation that will consider the results of available studiesfor Provisional Interconnection Service. NYISO, which terms shall be memorialized in the Interconnection Service Agreement. Consistent with Tariff, Part VI, Subpart B, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted conjunction with the Commission. Connecting Transmission Provider Owner, shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer the Developer interconnects without modifications to the Large Generating Facility or the New York State Transmission SystemSystem (or Distribution System as applicable). NYISO, in conjunction with the Connecting Transmission Provider Owner, shall determine whether any Interconnection Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, or system protection facilities that System Protection Facilities, which are necessary to meet the requirements of NERCApplicable Laws and Regulations, or any applicable Regional Entity for the interconnection of a newApplicable Reliability Standards, modified and/or expanded Generating Facility and Good Utility Practice, are in place prior to the commencement of Interconnection Service interconnection service from the Generating Large Facility. Where available studies indicate that such Interconnection the Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, and/or system protection facilities that or System Protection Facilities are required for the interconnection of a new, modified and/or expanded Generating Large Facility but such facilities are not currently in place, NYISO, in conjunction with the Connecting Transmission Provider Owner, will perform a study, at the Interconnection CustomerDeveloper’s SERVICE AGREEMENT NO. 2535 expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Generating Large Facility in the Provisional Large Facility Interconnection Agreement shall be studied studied, at the Developer’s expense, and updated annually and at the Interconnection Customer’s expenseannually. The results will be communicated NYISO shall issue the study’s findings in writing to the Developer and Connecting Transmission Owner(s). Following a determination by NYISO, in conjunction with the Connecting Transmission Owner, that the Developer may reliably provide Provisional Interconnection Customer in writing upon completion Service, NYISO shall tender to the Developer and Connecting Transmission Owner, a Provisional Large Facility Interconnection Agreement. NYISO, Developer, and Connecting Transmission Owner may execute the Provisional Large Facility Interconnection Agreement, or the Developer may request the filing of an unexecuted Provisional Large Facility Interconnection Agreement with the studyCommission. Interconnection Customer assumes The Developer shall assume all risk and liabilities with respect to changes between the Provisional Large Facility Interconnection ServiceAgreement and the Large Generator Interconnection Agreement, including changes in output limits and Interconnection the cost responsibilities for the Attachment Facilities, Network UpgradesSystem Upgrade Facilities, Local System Deliverability Upgrades, and/or system protection facilities cost responsibilitiesSystem Protection Facilities.

Appears in 4 contracts

Samples: Service Agreement, Service Agreement, Service Agreement

Provisional Interconnection Service. Upon Prior to the request completion of the Large Facility Interconnection Customer, Procedures and prior to completion of requisite Interconnection Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Distribution Upgrades, or system protection facilities Interconnection Customer System Protection Facilities, the Developer may request limited Interconnection Service at the discretion of Transmission Provider based upon an evaluation that will consider the results of available studiesfor Provisional Interconnection Service. NYISO, which terms shall be memorialized in the Interconnection Service Agreement. Consistent with Tariff, Part VI, Subpart B, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted conjunction with the Commission. Connecting Transmission Provider Owner, shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer the Developer interconnects without modifications to the Large Generating Facility or the New York State Transmission SystemSystem (or Distribution System as applicable). NYISO, in conjunction with the Connecting Transmission Provider Owner, shall determine whether any Interconnection Attachment Facilities, Network SERVICE AGREEMENT NO. 2593 Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, or system protection facilities that System Protection Facilities, which are necessary to meet the requirements of NERCApplicable Laws and Regulations, or any applicable Regional Entity for the interconnection of a newApplicable Reliability Standards, modified and/or expanded Generating Facility and Good Utility Practice, are in place prior to the commencement of Interconnection Service interconnection service from the Generating Large Facility. Where available studies indicate that such Interconnection the Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, and/or system protection facilities that or System Protection Facilities are required for the interconnection of a new, modified and/or expanded Generating Large Facility but such facilities are not currently in place, NYISO, in conjunction with the Connecting Transmission Provider Owner, will perform a study, at the Interconnection CustomerDeveloper’s expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Generating Large Facility in the Provisional Large Facility Interconnection Agreement shall be studied studied, at the Developer’s expense, and updated annually and at the Interconnection Customer’s expenseannually. The results will be communicated NYISO shall issue the study’s findings in writing to the Developer and Connecting Transmission Owner(s). Following a determination by NYISO, in conjunction with the Connecting Transmission Owner, that the Developer may reliably provide Provisional Interconnection Customer in writing upon completion Service, NYISO shall tender to the Developer and Connecting Transmission Owner, a Provisional Large Facility Interconnection Agreement. NYISO, Developer, and Connecting Transmission Owner may execute the Provisional Large Facility Interconnection Agreement, or the Developer may request the filing of an unexecuted Provisional Large Facility Interconnection Agreement with the studyCommission. Interconnection Customer assumes The Developer shall assume all risk and liabilities with respect to changes between the Provisional Large Facility Interconnection ServiceAgreement and the Large Generator Interconnection Agreement, including changes in output limits and Interconnection the cost responsibilities for the Attachment Facilities, Network UpgradesSystem Upgrade Facilities, Local System Deliverability Upgrades, and/or system protection facilities cost responsibilitiesSystem Protection Facilities.

Appears in 3 contracts

Samples: Service Agreement, Service Agreement, Service Agreement

Provisional Interconnection Service. Upon Prior to the request completion of the Large Facility Interconnection Customer, Procedures and prior to completion of requisite Interconnection Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Distribution Upgrades, or system protection facilities Interconnection Customer System Protection Facilities, the Developer may request limited Interconnection Service at the discretion of Transmission Provider based upon an evaluation that will consider the results of available studiesfor Provisional Interconnection Service. NYISO, which terms shall be memorialized in the Interconnection Service Agreement. Consistent with Tariff, Part VI, Subpart B, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted conjunction with the Commission. Connecting Transmission Provider Owner, shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer the Developer interconnects without modifications to the Large Generating Facility or the New York State Transmission SystemSystem (or Distribution System as applicable). NYISO, in conjunction with the Connecting Transmission Provider Owner, shall determine whether any Interconnection Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, or system protection facilities that System Protection Facilities, which are necessary to meet the requirements of NERCApplicable Laws and Regulations, or any applicable Regional Entity for the interconnection of a newApplicable Reliability Standards, modified and/or expanded Generating Facility and Good Utility Practice, are in place prior to the commencement of Interconnection Service interconnection service from the Generating Large Facility. Where available studies indicate that such Interconnection the Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, and/or system protection facilities that or System Protection Facilities are required for the interconnection of a new, modified and/or expanded Generating Large Facility but such facilities are not currently in place, NYISO, in conjunction with the Connecting Transmission Provider Owner, will perform a study, at the Interconnection CustomerDeveloper’s expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Generating Large Facility in the Provisional Large Facility Interconnection Agreement shall be studied studied, at the Developer’s expense, and updated annually and at the Interconnection Customer’s expense. The results will be communicated to the Interconnection Customer in writing upon completion of the study. Interconnection Customer assumes all risk and liabilities with respect to the Provisional Interconnection Service, including changes in output limits and Interconnection Facilities, Network Upgrades, Local Upgrades, and/or system protection facilities cost responsibilitiesannually.

Appears in 2 contracts

Samples: Service Agreement, Service Agreement

Provisional Interconnection Service. Upon the request of Interconnection Customer, and prior to completion of requisite Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, or system protection facilities System Protection Facilities Transmission Provider may execute a Provisional Large Generator Interconnection Agreement or Interconnection Customer may request the filing of an unexecuted Provisional Large Generator Interconnection Agreement with the Interconnection Customer for limited Interconnection Service at the discretion of Transmission Provider based upon an evaluation that will consider the results of available studies, which terms shall be memorialized in the Interconnection Service Agreement. Consistent with Tariff, Part VI, Subpart B, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted with the Commission. Transmission Provider shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer interconnects without modifications to the Generating Facility or the Transmission System. Transmission Provider shall determine whether any Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, or system protection facilities System Protection Facilities that are necessary to meet the requirements of NERC, or any applicable Regional Entity for the interconnection of a new, modified and/or expanded Generating Facility are in place prior to the commencement of Interconnection Service from the Generating Facility. Where available studies indicate that such such, Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, and/or system protection facilities System Protection Facilities that are required for the interconnection of a new, modified and/or expanded Generating Facility are not currently in place, Transmission Provider will perform a study, at the Interconnection Customer’s expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Generating Facility in the Provisional Large Generator Interconnection Agreement shall be studied and updated annually and at the Interconnection Customer’s expense. The results will be communicated to the Interconnection Customer in writing upon completion of the study. Interconnection Customer assumes all risk and liabilities with respect to changes between the Provisional Large Generator Interconnection ServiceAgreement and the Large Generator Interconnection Agreement, including changes in output limits and Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, and/or system protection facilities System Protection Facilities cost responsibilities.

Appears in 2 contracts

Samples: Agreement, Assignment Agreement

Provisional Interconnection Service. Upon the request of Interconnection Customer, and prior to completion of requisite Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, or system protection facilities System Protection Facilities, System Operator and the Interconnecting Transmission Owner may execute a Provisional Small Generator Interconnection Agreement or Interconnection Customer may request limited the filing of an unexecuted Provisional Small Generator Interconnection Agreement with the Interconnection Customer for Provisional Interconnection Service at the discretion of System Operator and Interconnecting Transmission Provider Owner based upon an evaluation that will consider the results of available studies, which terms shall be memorialized in the Interconnection Service Agreement. Consistent with Tariff, Part VI, Subpart B, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted with the Commission. System Operator and Interconnecting Transmission Provider Owner shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer interconnects without modifications to the Small Generating Facility or the New England Transmission System. System Operator and Interconnecting Transmission Provider Owner shall determine whether any Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, or system protection facilities System Protection Facilities that are necessary to meet the requirements of NERC, or any applicable Regional Entity for the interconnection of a new, modified and/or expanded Small Generating Facility are in place prior to the commencement of Interconnection Service from the Small Generating Facility. Where available studies indicate that such Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, and/or system protection facilities System Protection Facilities that are required for the interconnection of a new, modified and/or expanded Small Generating Facility are not currently in place, Transmission Provider System Operator will perform a study, at the Interconnection Customer’s expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Small Generating Facility in the Provisional Small Generator Interconnection Agreement shall be studied and updated annually each time the conditions assumed in the studies supporting the Provisional Interconnection Service change. Provisional Interconnection Service is an optional procedure and at it will not alter the Interconnection Customer’s expense. The results will be communicated to the Interconnection Customer in writing upon completion of the studyQueue Position and associated cost and upgrade responsibilities. Interconnection Customer assumes all risk and liabilities with respect to changes between the Provisional Small Generator Interconnection ServiceAgreement and the Small Generator Interconnection Agreement, including changes in output limits and Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, and/or system protection facilities System Protection Facilities cost responsibilities.

Appears in 2 contracts

Samples: Small Generator Interconnection Agreement, Small Generator Interconnection Agreement

Provisional Interconnection Service. Upon Prior to the request completion of the Large Facility Interconnection Customer, Procedures and prior to completion of requisite Interconnection Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Distribution Upgrades, or system protection facilities Interconnection Customer System Protection Facilities, the Developer may request limited Interconnection Service at the discretion of Transmission Provider based upon an evaluation that will consider the results of available studiesfor Provisional Interconnection Service. NYISO, which terms shall be memorialized in the Interconnection Service Agreement. Consistent with Tariff, Part VI, Subpart B, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted conjunction with the Commission. Connecting Transmission Provider Owner, shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer the Developer interconnects without modifications to the Large Generating Facility or the New York State Transmission SystemSystem (or Distribution System as applicable). NYISO, in conjunction with the Connecting Transmission Provider Owner, shall determine whether any Interconnection Attachment Facilities, Network SERVICE AGREEMENT NO. 2682 Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, or system protection facilities that System Protection Facilities, which are necessary to meet the requirements of NERCApplicable Laws and Regulations, or any applicable Regional Entity for the interconnection of a newApplicable Reliability Standards, modified and/or expanded Generating Facility and Good Utility Practice, are in place prior to the commencement of Interconnection Service interconnection service from the Generating Large Facility. Where available studies indicate that such Interconnection the Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, and/or system protection facilities that or System Protection Facilities are required for the interconnection of a new, modified and/or expanded Generating Large Facility but such facilities are not currently in place, NYISO, in conjunction with the Connecting Transmission Provider Owner, will perform a study, at the Interconnection CustomerDeveloper’s expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Generating Large Facility in the Provisional Large Facility Interconnection Agreement shall be studied studied, at the Developer’s expense, and updated annually and at the Interconnection Customer’s expenseannually. The results will be communicated NYISO shall issue the study’s findings in writing to the Developer and Connecting Transmission Owner(s). Following a determination by XXXXX, in conjunction with the Connecting Transmission Owner, that the Developer may reliably provide Provisional Interconnection Customer in writing upon completion Service, NYISO shall tender to the Developer and Connecting Transmission Owner, a Provisional Large Facility Interconnection Agreement. NYISO, Developer, and Connecting Transmission Owner may execute the Provisional Large Facility Interconnection Agreement, or the Developer may request the filing of an unexecuted Provisional Large Facility Interconnection Agreement with the studyCommission. Interconnection Customer assumes The Developer shall assume all risk and liabilities with respect to changes between the Provisional Large Facility Interconnection ServiceAgreement and the Large Generator Interconnection Agreement, including changes in output limits and Interconnection the cost responsibilities for the Attachment Facilities, Network UpgradesSystem Upgrade Facilities, Local System Deliverability Upgrades, and/or system protection facilities cost responsibilitiesSystem Protection Facilities.

Appears in 2 contracts

Samples: Service Agreement, Service Agreement

Provisional Interconnection Service. Upon Prior to the request completion of the Large Facility Interconnection Customer, Procedures and prior to completion of requisite Interconnection Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Distribution Upgrades, or system protection facilities Interconnection Customer System Protection Facilities, the Developer may request limited Interconnection Service at the discretion of Transmission Provider based upon an evaluation that will consider the results of available studiesfor Provisional Interconnection Service. NYISO, which terms shall be memorialized in the Interconnection Service Agreement. Consistent with Tariff, Part VI, Subpart B, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted conjunction with the Commission. Connecting Transmission Provider Owner, shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer the Developer interconnects without modifications to the Large Generating Facility or the New York State Transmission SystemSystem (or Distribution System as applicable). NYISO, in conjunction with the Connecting Transmission Provider Owner, shall determine whether any Interconnection Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, or system protection facilities that System Protection Facilities, which are necessary to meet the requirements of NERCApplicable Laws and Regulations, or any applicable Regional Entity for the interconnection of a newApplicable Reliability Standards, modified and/or expanded Generating Facility and Good Utility Practice, are in place prior to the commencement of Interconnection Service interconnection service from the Generating Large Facility. Where available studies indicate that such Interconnection the Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, and/or system protection facilities that or System Protection Facilities are required for the interconnection of a new, modified and/or expanded Generating Large Facility but such facilities are not currently in place, NYISO, in conjunction with the Connecting Transmission Provider Owner, will perform a study, at the Interconnection CustomerDeveloper’s SERVICE AGREEMENT NO. 2535 expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Generating Large Facility in the Provisional Large Facility Interconnection Agreement shall be studied studied, at the Developer’s expense, and updated annually and at the Interconnection Customer’s expenseannually. The results will be communicated NYISO shall issue the study’s findings in writing to the Developer and Connecting Transmission Owner(s). Following a determination by XXXXX, in conjunction with the Connecting Transmission Owner, that the Developer may reliably provide Provisional Interconnection Customer in writing upon completion Service, NYISO shall tender to the Developer and Connecting Transmission Owner, a Provisional Large Facility Interconnection Agreement. NYISO, Developer, and Connecting Transmission Owner may execute the Provisional Large Facility Interconnection Agreement, or the Developer may request the filing of an unexecuted Provisional Large Facility Interconnection Agreement with the studyCommission. Interconnection Customer assumes The Developer shall assume all risk and liabilities with respect to changes between the Provisional Large Facility Interconnection ServiceAgreement and the Large Generator Interconnection Agreement, including changes in output limits and Interconnection the cost responsibilities for the Attachment Facilities, Network UpgradesSystem Upgrade Facilities, Local System Deliverability Upgrades, and/or system protection facilities cost responsibilitiesSystem Protection Facilities.

Appears in 2 contracts

Samples: Service Agreement, Service Agreement

Provisional Interconnection Service. Upon Prior to the request completion of the Large Facility Interconnection Customer, Procedures and prior to completion of requisite Interconnection Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Distribution Upgrades, or system protection facilities Interconnection Customer System Protection Facilities, the Developer may request limited Interconnection Service at the discretion of Transmission Provider based upon an evaluation that will consider the results of available studiesfor Provisional Interconnection Service. NYISO, which terms shall be memorialized in the Interconnection Service Agreement. Consistent with Tariff, Part VI, Subpart B, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted conjunction with the Commission. Connecting Transmission Provider Owner, shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer the Developer interconnects without modifications to the Large Generating Facility or the New York State Transmission SystemSystem (or Distribution System as applicable). NYISO, in conjunction with the Connecting Transmission Provider Owner, shall determine whether any Interconnection Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, or system protection facilities that System Protection Facilities, which are necessary to meet the requirements of NERCApplicable Laws and Regulations, or any applicable Regional Entity for the interconnection of a newApplicable Reliability Standards, modified and/or expanded Generating Facility and Good Utility Practice, are in place prior to the commencement of Interconnection Service interconnection service from the Generating Large Facility. Where available studies indicate that such Interconnection the Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, and/or system protection facilities that or System Protection Facilities are required for the interconnection of a new, modified and/or expanded Generating Large Facility but such facilities are not currently in place, NYISO, in conjunction with the Connecting Transmission Provider Owner, will perform a study, at the Interconnection CustomerDeveloper’s expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Generating Large Facility in the Provisional Large Facility Interconnection Agreement shall be studied studied, at the Developer’s expense, and updated annually and at the Interconnection Customer’s expenseannually. The results will be communicated NYISO shall issue the study’s findings in writing to the Interconnection Customer Developer and Connecting Transmission Owner(s). Following a determination by XXXXX, in writing upon completion of conjunction with the study. Interconnection Customer assumes all risk and liabilities with respect to Connecting Transmission Owner, that the Developer may reliably provide Provisional Interconnection Service, including changes in output limits NYISO shall tender to the Developer and Connecting Transmission Owner, a Provisional Large Facility Interconnection FacilitiesAgreement. NYISO, Network UpgradesDeveloper, Local Upgradesand Connecting Transmission Owner may execute the Provisional Large Facility Interconnection Agreement, and/or system protection facilities cost responsibilities.or the Developer may request the filing of an unexecuted Provisional Large Facility

Appears in 2 contracts

Samples: Service Agreement, Service Agreement

Provisional Interconnection Service. Upon the request of Interconnection Customer, and prior to completion of requisite Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, Contingent Facilities, or system protection facilities System Protection Facilities, Transmission Provider may execute a Provisional Large Generator Interconnection Agreement with the Interconnection Customer may request for limited Interconnection Service at the discretion of Transmission Provider based upon an evaluation that will consider the results of available studies, which terms shall be memorialized in the Interconnection Service Agreement. Consistent with Tariff, Part VI, Subpart B, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted with the Commission. Transmission Provider shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer interconnects without modifications to the Generating Facility or the Transmission System. Transmission Provider shall determine whether any Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, Contingent Facilities, or system protection facilities System Protection Facilities that are necessary to meet the requirements of NERC, or any applicable Regional Entity for the interconnection of a new, modified and/or expanded Generating Facility are in place prior to the commencement of Interconnection Service from the Generating Facility. Where available studies indicate that such Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, Contingent Facilities, and/or system protection facilities System Protection Facilities that are required for the interconnection of a new, modified and/or expanded Generating Facility are not currently in place, Transmission Provider will perform a study, at the Interconnection Customer’s expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Generating Facility in the Provisional Large Generator Interconnection Agreement shall be studied and updated annually on an annual basis and at the Interconnection Customer’s expense. The results will be communicated to expense unless there have been no changes on Transmission Provider’s Transmission System since the Interconnection Customer in writing upon completion of the Customer’s last completed study. Interconnection Customer assumes all risk and liabilities with respect to changes between the Provisional Large Generator Interconnection ServiceAgreement and the Large Generator Interconnection Agreement, including changes in output limits and Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, Contingent Facilities, and/or system protection facilities System Protection Facilities cost responsibilities.

Appears in 2 contracts

Samples: Agreement, Agreement

Provisional Interconnection Service. Upon Prior to the request completion of the Large Facility Interconnection Customer, Procedures and prior to completion of requisite Interconnection Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Distribution Upgrades, or system protection facilities Interconnection Customer System Protection Facilities, the Developer may request limited Interconnection Service at the discretion of Transmission Provider based upon an evaluation that will consider the results of available studiesfor Provisional Interconnection Service. NYISO, which terms shall be memorialized in the Interconnection Service Agreement. Consistent with Tariff, Part VI, Subpart B, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted conjunction with the Commission. Connecting Transmission Provider Owner, shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer the Developer interconnects without modifications to the Large Generating Facility or the New York State Transmission SystemSystem (or Distribution System as applicable). NYISO, in conjunction with the Connecting Transmission Provider Owner, shall determine whether any Interconnection Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, or system protection facilities that System Protection Facilities, which are necessary to meet the requirements of NERCApplicable Laws and Regulations, or any applicable Regional Entity for the interconnection of a newApplicable Reliability Standards, modified and/or expanded Generating Facility and Good Utility Practice, are in place prior to the commencement of Interconnection Service interconnection service from the Generating Large Facility. Where available studies indicate that such Interconnection the Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, and/or system protection facilities that or System Protection Facilities are required for the interconnection of a new, modified and/or expanded Generating Large Facility but such facilities are not currently in place, NYISO, in conjunction with the Connecting Transmission Provider Owner, will perform a study, at the Interconnection CustomerDeveloper’s expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Generating Large Facility in the Provisional Large Facility Interconnection Agreement shall be studied studied, at the Developer’s expense, and updated annually and at the Interconnection Customer’s expenseannually. The results will be communicated NYISO shall issue the study’s findings in writing to the Developer and Connecting Transmission Owner(s). Following a determination by XXXXX, in conjunction with the Connecting Transmission Owner, that the Developer may reliably provide Provisional Interconnection Customer in writing upon completion Service, NYISO shall tender to the Developer and Connecting Transmission Owner, a Provisional Large Facility Interconnection Agreement. NYISO, Developer, and Connecting Transmission Owner may execute the Provisional Large Facility Interconnection Agreement, or the Developer may request the filing of an unexecuted Provisional Large Facility Interconnection Agreement with the studyCommission. Interconnection Customer assumes The Developer shall assume all risk and liabilities with respect to changes between the Provisional Large Facility Interconnection ServiceAgreement and the Large Generator Interconnection Agreement, including changes in output limits and Interconnection the cost responsibilities for the Attachment Facilities, Network UpgradesSystem Upgrade Facilities, Local System Deliverability Upgrades, and/or system protection facilities cost responsibilities.System Protection Facilities.‌

Appears in 2 contracts

Samples: Service Agreement, Service Agreement

Provisional Interconnection Service. Upon Prior to the request completion of the Large Facility Interconnection Customer, Procedures and prior to completion of requisite Interconnection Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Distribution Upgrades, or system protection facilities Interconnection Customer System Protection Facilities, the Developer may request limited Interconnection Service at the discretion of Transmission Provider based upon an evaluation that will consider the results of available studiesfor Provisional Interconnection Service. NYISO, which terms shall be memorialized in the Interconnection Service Agreement. Consistent with Tariff, Part VI, Subpart B, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted conjunction with the Commission. Connecting Transmission Provider Owner, shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer the SERVICE AGREEMENT NO. 2710 Developer interconnects without modifications to the Generating Merchant Transmission Facility or the New York State Transmission SystemSystem (or Distribution System as applicable). NYISO, in conjunction with the Connecting Transmission Provider Owner, shall determine whether any Interconnection Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, or system protection facilities that System Protection Facilities, which are necessary to meet the requirements of NERCApplicable Laws and Regulations, or any applicable Regional Entity for the interconnection of a newApplicable Reliability Standards, modified and/or expanded Generating Facility and Good Utility Practice, are in place prior to the commencement of Interconnection Service interconnection service from the Generating Merchant Transmission Facility. Where available studies indicate that such Interconnection the Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, and/or system protection facilities that or System Protection Facilities are required for the interconnection of a new, modified and/or expanded Generating Merchant Transmission Facility but such facilities are not currently in place, NYISO, in conjunction with the Connecting Transmission Provider Owner, will perform a study, at the Interconnection CustomerDeveloper’s expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Generating Merchant Transmission Facility in the Provisional Merchant Transmission Facility Interconnection Agreement shall be studied studied, at the Developer’s expense, and updated annually and at the Interconnection Customer’s expenseannually. The results will be communicated NYISO shall issue the study’s findings in writing to the Developer and Connecting Transmission Owner(s). Following a determination by XXXXX, in conjunction with the Connecting Transmission Owner, that the Developer may reliably provide Provisional Interconnection Customer in writing upon completion Service, NYISO shall tender to the Developer and Connecting Transmission Owner, a Provisional Large Facility Interconnection Agreement. NYISO, Developer, and Connecting Transmission Owner may execute the Provisional Merchant Transmission Facility Interconnection Agreement, or the Developer may request the filing of an unexecuted Provisional Merchant Transmission Facility Interconnection Agreement with the studyCommission. Interconnection Customer assumes The Developer shall assume all risk and liabilities with respect to changes between the Provisional Merchant Transmission Facility Interconnection ServiceAgreement and the Merchant Transmission Facility Interconnection Agreement, including changes in output limits and Interconnection the cost responsibilities for the Attachment Facilities, Network UpgradesSystem Upgrade Facilities, Local System Deliverability Upgrades, and/or system protection facilities cost responsibilitiesSystem Protection Facilities.

Appears in 2 contracts

Samples: Service Agreement, Service Agreement

Provisional Interconnection Service. Upon the request of Prior to: (i) Interconnection Customer, ’s eligibility under the Standard Large Facility Interconnection Procedures or Standard Interconnection Procedures pursuant to which it may enter into an interconnection agreement before the completion of the Class Year Study or Cluster Study and prior to (ii) the completion of requisite Interconnection Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Distribution Upgrades, or system protection facilities System Protection Facilities, Interconnection Customer may request limited Interconnection Service at the discretion of Transmission Provider based upon an evaluation that will consider the results of available studiesfor Provisional Interconnection Service. NYISO, which terms shall be memorialized in the Interconnection Service Agreement. Consistent with Tariff, Part VI, Subpart B, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted conjunction with the Commission. Connecting Transmission Provider Owner, shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer interconnects without modifications to the Generating Facility or the New York State Transmission SystemSystem (or Distribution System as applicable). NYISO, in conjunction with the Connecting Transmission Provider Owner, shall determine whether any Interconnection Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, or system protection facilities that System Protection Facilities, which are necessary to meet the requirements of NERCApplicable Laws and Regulations, or any applicable Regional Entity for the interconnection of a newApplicable Reliability Standards, modified and/or expanded Generating Facility and Good Utility Practice, are in place prior to the commencement of Interconnection Service interconnection service from the Generating Facility. Where available studies indicate that such Interconnection the Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, and/or system protection facilities that or System Protection Facilities are required for the interconnection of a new, modified and/or expanded Generating Facility but such facilities are not currently in place, NYISO, in conjunction with the Connecting Transmission Provider Owner, will perform a study, at the Interconnection Customer’s expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Generating Facility in the Provisional Standard Interconnection Agreement shall be studied and updated annually and studied, at the Interconnection Customer’s expense, and updated annually. The results will be communicated NYISO shall issue the study’s findings in writing to the Interconnection Customer and Connecting Transmission Owner(s). Following a determination by NYISO, in writing upon completion conjunction with the Connecting Transmission Owner, that Interconnection Customer may reliably provide Provisional Interconnection Service, NYISO shall tender to Interconnection Customer and Connecting Transmission Owner, a Provisional Standard Interconnection Agreement. NYISO, Interconnection Customer, and Connecting Transmission Owner may execute the Provisional Standard Interconnection Agreement, or Interconnection Customer may request the filing of an unexecuted Provisional Standard Interconnection Agreement with the studyCommission. Interconnection Customer assumes shall assume all risk and liabilities with respect to changes between the Provisional Standard Interconnection ServiceAgreement and the Standard Interconnection Agreement, including changes in output limits and Interconnection the cost responsibilities for the Attachment Facilities, Network UpgradesSystem Upgrade Facilities, Local System Deliverability Upgrades, and/or system protection facilities cost responsibilitiesSystem Protection Facilities.

Appears in 2 contracts

Samples: Standard Interconnection Agreement, Standard Interconnection Agreement

Provisional Interconnection Service. Upon Prior to the request completion of the Large Facility Interconnection Customer, Procedures and prior to completion of requisite Interconnection Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Distribution Upgrades, or system protection facilities Interconnection Customer System Protection Facilities, the Developer may request limited Interconnection Service at the discretion of Transmission Provider based upon an evaluation that will consider the results of available studiesfor Provisional Interconnection Service. NYISO, which terms shall be memorialized in the Interconnection Service Agreement. Consistent with Tariff, Part VI, Subpart B, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted conjunction with the Commission. Connecting Transmission Provider Owner, shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer the SERVICE AGREEMENT NO. 2672 Developer interconnects without modifications to the Large Generating Facility or the New York State Transmission SystemSystem (or Distribution System as applicable). NYISO, in conjunction with the Connecting Transmission Provider Owner, shall determine whether any Interconnection Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, or system protection facilities that System Protection Facilities, which are necessary to meet the requirements of NERCApplicable Laws and Regulations, or any applicable Regional Entity for the interconnection of a newApplicable Reliability Standards, modified and/or expanded Generating Facility and Good Utility Practice, are in place prior to the commencement of Interconnection Service interconnection service from the Generating Large Facility. Where available studies indicate that such Interconnection the Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, and/or system protection facilities that or System Protection Facilities are required for the interconnection of a new, modified and/or expanded Generating Large Facility but such facilities are not currently in place, NYISO, in conjunction with the Connecting Transmission Provider Owner, will perform a study, at the Interconnection CustomerDeveloper’s expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Generating Large Facility in the Provisional Large Facility Interconnection Agreement shall be studied studied, at the Developer’s expense, and updated annually and at the Interconnection Customer’s expenseannually. The results will be communicated NYISO shall issue the study’s findings in writing to the Developer and Connecting Transmission Owner(s). Following a determination by NYISO, in conjunction with the Connecting Transmission Owner, that the Developer may reliably provide Provisional Interconnection Customer in writing upon completion Service, NYISO shall tender to the Developer and Connecting Transmission Owner, a Provisional Large Facility Interconnection Agreement. NYISO, Developer, and Connecting Transmission Owner may execute the Provisional Large Facility Interconnection Agreement, or the Developer may request the filing of an unexecuted Provisional Large Facility Interconnection Agreement with the studyCommission. Interconnection Customer assumes The Developer shall assume all risk and liabilities with respect to changes between the Provisional Large Facility Interconnection ServiceAgreement and the Large Generator Interconnection Agreement, including changes in output limits and Interconnection the cost responsibilities for the Attachment Facilities, Network UpgradesSystem Upgrade Facilities, Local System Deliverability Upgrades, and/or system protection facilities cost responsibilitiesSystem Protection Facilities.

Appears in 2 contracts

Samples: Service Agreement, Service Agreement

Provisional Interconnection Service. Upon the request of Interconnection Customer, and prior to completion of requisite Interconnection Facilities, Network Upgrades, Local Upgrades, or system protection facilities System Protection Facilities TVA may execute a Large Generator Interconnection Customer may request Agreement for limited Interconnection Service at the discretion of Transmission Provider TVA based upon an evaluation that will consider the results of available studies, which terms shall be memorialized in the Interconnection Service Agreement. Consistent with Tariff, Part VI, Subpart B, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted with the Commission. Transmission Provider TVA shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer interconnects without modifications to the Generating Facility or the Transmission System. Transmission Provider TVA shall determine whether any Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, or system protection facilities System Protection Facilities that are necessary to meet the requirements of NERC, or any applicable Regional Entity for the interconnection of a new, modified and/or expanded Generating Facility are in place prior to the commencement of Interconnection Service from the Generating Facility. Where available studies indicate that such such, Interconnection Facilities, Network Upgrades, Local Upgrades, and/or system protection facilities System Protection Facilities that are required for the interconnection of a new, modified and/or expanded Generating Facility are not currently in place, Transmission Provider TVA will perform a study, at the Interconnection Customer’s expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Generating Facility in the Large Generator Interconnection Agreement shall be studied and updated annually [on a frequency determined by TVA and at the Interconnection Customer’s expense. The results will be communicated to the Interconnection Customer in writing upon completion of the study]. Interconnection Customer assumes all risk and liabilities with respect to changes between the Provisional Interconnection Serviceprovisional interconnection service and full interconnection service, including changes in output limits and Interconnection Facilities, Network Upgrades, Local Upgrades, and/or system protection facilities System Protection Facilities cost responsibilities.

Appears in 1 contract

Samples: Interconnection Agreement

Provisional Interconnection Service. Upon the request of Interconnection Customer, and prior to completion of requisite Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, or system protection facilities System Protection Facilities, the Participants may execute a Provisional Large Generator Interconnection Agreement or Interconnection Customer may request the filing of an unexecuted Provisional Large Generator Interconnection Agreement with the Interconnection Customer for limited Interconnection Service at the discretion of Transmission Provider Participants based upon an evaluation that will consider the results of available studies, which terms shall be memorialized in the Interconnection Service Agreement. Consistent with Tariff, Part VI, Subpart B, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted with the Commission. Transmission Provider Participants shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer interconnects without modifications to the Generating Facility or the Transmission System. Transmission Provider Participants shall determine whether any Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, or system protection facilities System Protection Facilities that are necessary to meet the requirements of NERC, or any applicable Regional Entity for the interconnection of a new, modified and/or expanded Generating Facility are in place prior to the commencement of Interconnection Service from the Generating Facility. Where available studies indicate that such such, Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, and/or system protection facilities System Protection Facilities that are required for the interconnection of a new, modified and/or expanded Generating Facility are not currently in place, Transmission Provider Participants will perform a study, at the Interconnection Customer’s expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Generating Facility in the Provisional Large Generator Interconnection Agreement shall be studied and updated annually and at the every time: (1) an Interconnection Customer’s expense. The results will be communicated System Impact Study is completed for an Interconnection Request with a Point of Interconnection that is electrically proximate to the Point of Interconnection Customer in writing upon completion for the existing Provisional Interconnection Service; or (2) a reliability study is completed for a portion of the studyTransmission System that is electrically proximate to the Point of Interconnection of the existing Provisional Interconnection Service. Interconnection Customer assumes all risk and liabilities with respect to changes between the Provisional Large Generator Interconnection ServiceAgreement and the Large Generator Interconnection Agreement, including changes in output limits and Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, and/or system protection facilities System Protection Facilities cost responsibilities.

Appears in 1 contract

Samples: Large Generator Interconnection Agreement

Provisional Interconnection Service. Upon the request of Interconnection CustomerProject Developer, and prior to completion of requisite Interconnection Facilities, Distribution Upgrades, Network Upgrades, Local Stand Alone Network Upgrades, or system protection facilities Interconnection Customer Project Developer may request limited Interconnection Service at the discretion of Transmission Provider based upon an evaluation that will consider the results of available studies, which terms shall be memorialized in the Generation Interconnection Service Agreement. Consistent with Agreement to be tendered by Transmission Provider to Project subject to the execution timelines and provisions set forth in Tariff, Part VI, Subpart BIX, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted with the Commission500. Transmission Provider shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer Project Developer interconnects without modifications to the Generating Facility or Merchant Transmission Facility or the Transmission System. Transmission Provider shall determine whether any Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, or Stand Alone Network Upgrades, or system protection facilities that are necessary to meet the requirements of NERC, or any applicable Regional Entity for the interconnection of a new, modified and/or expanded Generating Facility or Merchant Transmission Facility are in place prior to the commencement of Interconnection Service from the Generating Facility or Merchant Transmission Facility. Where available studies indicate that such Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, or Stand Alone Network Upgrades, and/or system protection facilities that are required for the interconnection of a new, modified and/or expanded Generating Facility or Merchant Transmission Facility are not currently in place, Transmission Provider will perform a study, at the Interconnection CustomerProject Developer’s expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Generating Facility or Merchant Transmission Facility shall be studied and updated annually and at the Interconnection CustomerProject Developer’s expense. The results will be communicated to the Interconnection Customer Project Developer in writing upon completion of the study. Interconnection Customer Project Developer assumes all risk and liabilities with respect to the Provisional Interconnection Service, including changes in output limits and Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, or Stand Alone Network Upgrades, and/or system protection facilities cost responsibilities.

Appears in 1 contract

Samples: Generation Interconnection Agreement

Provisional Interconnection Service. Upon the request of Interconnection Customer, and prior to completion of requisite Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, or system protection facilities System Protection Facilities Transmission Provider may execute a Provisional Generator Interconnection Agreement or Interconnection Customer may request the filing of an unexecuted Provisional Generator Interconnection Agreement with the Interconnection Customer for limited Interconnection Service at the discretion of Transmission Provider based upon an evaluation that will consider the results of available studies, which terms shall be memorialized in the Interconnection Service Agreement. Consistent with Tariff, Part VI, Subpart B, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted with the Commission. Transmission Provider shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer interconnects without modifications to the Generating Facility or the Transmission System. Transmission Provider shall determine whether any Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, or system protection facilities System Protection Facilities that are necessary to meet the requirements of NERC, or any applicable Regional Entity for the interconnection of a new, modified and/or expanded Generating Facility are in place prior to the commencement of Interconnection Service from the Generating Facility. Where available studies indicate that such such, Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, and/or system protection facilities System Protection Facilities that are required for the interconnection of a new, modified and/or expanded Generating Facility are not currently in place, Transmission Provider will perform a study, at the Interconnection Customer’s expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Generating Facility in the Provisional Generator Interconnection Agreement shall be studied and updated annually [on a frequency determined by Transmission Provider and at the Interconnection Customer’s expense. The results will be communicated to the Interconnection Customer in writing upon completion of the study]. Interconnection Customer assumes all risk and liabilities with respect to changes between the Provisional Generator Interconnection ServiceAgreement and the Generator Interconnection Agreement, including changes in output limits and Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, and/or system protection facilities System Protection Facilities cost responsibilities.

Appears in 1 contract

Samples: Generator Interconnection Agreement

Provisional Interconnection Service. Upon the request of Interconnection Customer, and prior to completion of requisite Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, or system protection facilities System Protection Facilities Transmission Provider may execute a Provisional Large Generator Interconnection Agreement or Interconnection Customer may request the filing of an unexecuted Provisional Large Generator Interconnection Agreement with the Interconnection Customer for limited Interconnection Service at the discretion of Transmission Provider based upon an evaluation that will consider the results of available studies, which terms shall be memorialized in the Interconnection Service Agreement. Consistent with Tariff, Part VI, Subpart B, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted with the Commission. Transmission Provider shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer interconnects without modifications to the Generating Facility or the Transmission System. Transmission Provider shall determine whether any Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, or system protection facilities System Protection Facilities that are necessary to meet the requirements of NERC, or any applicable Regional Entity for the interconnection of a new, modified and/or expanded Generating Facility are in place prior to the commencement of Interconnection Service from the Generating Facility. Where available studies indicate that such such, Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, and/or system protection facilities System Protection Facilities that are required for the interconnection of a new, modified and/or expanded Generating Facility are not currently in place, Transmission Provider will perform a study, at the Interconnection Customer’s expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Generating Facility in the Provisional Large Generator Interconnection Agreement shall be studied and updated annually [on a frequency determined by Transmission Provider and at the Interconnection Customer’s expense. The results will be communicated to the Interconnection Customer in writing upon completion of the study]. Interconnection Customer assumes all risk and liabilities with respect to changes between the Provisional Large Generator Interconnection ServiceAgreement and the Large Generator Interconnection Agreement, including changes in output limits and Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, and/or system protection facilities System Protection Facilities cost responsibilities.

Appears in 1 contract

Samples: Revision History*

AutoNDA by SimpleDocs

Provisional Interconnection Service. Upon Prior to the request completion of the Large Facility Interconnection Customer, Procedures and prior to completion of requisite Interconnection Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Distribution Upgrades, or system protection facilities Interconnection Customer System Protection Facilities, the Developer may request limited Interconnection Service at the discretion of Transmission Provider based upon an evaluation that will consider the results of available studiesfor Provisional Interconnection Service. NYISO, which terms shall be memorialized in the Interconnection Service Agreement. Consistent with Tariff, Part VI, Subpart B, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted conjunction with the Commission. Connecting Transmission Provider Owner, shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer the Developer interconnects without modifications to the Large Generating Facility or the New York State Transmission SystemSystem (or Distribution System as applicable). NYISO, in conjunction with the Connecting Transmission Provider Owner, shall determine whether any Interconnection Attachment Facilities, Network SERVICE AGREEMENT NO. 2683 Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, or system protection facilities that System Protection Facilities, which are necessary to meet the requirements of NERCApplicable Laws and Regulations, or any applicable Regional Entity for the interconnection of a newApplicable Reliability Standards, modified and/or expanded Generating Facility and Good Utility Practice, are in place prior to the commencement of Interconnection Service interconnection service from the Generating Large Facility. Where available studies indicate that such Interconnection the Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, and/or system protection facilities that or System Protection Facilities are required for the interconnection of a new, modified and/or expanded Generating Large Facility but such facilities are not currently in place, NYISO, in conjunction with the Connecting Transmission Provider Owner, will perform a study, at the Interconnection CustomerDeveloper’s expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Generating Large Facility in the Provisional Large Facility Interconnection Agreement shall be studied studied, at the Developer’s expense, and updated annually and at the Interconnection Customer’s expenseannually. The results will be communicated NYISO shall issue the study’s findings in writing to the Developer and Connecting Transmission Owner(s). Following a determination by NYISO, in conjunction with the Connecting Transmission Owner, that the Developer may reliably provide Provisional Interconnection Customer in writing upon completion Service, NYISO shall tender to the Developer and Connecting Transmission Owner, a Provisional Large Facility Interconnection Agreement. NYISO, Developer, and Connecting Transmission Owner may execute the Provisional Large Facility Interconnection Agreement, or the Developer may request the filing of an unexecuted Provisional Large Facility Interconnection Agreement with the studyCommission. Interconnection Customer assumes The Developer shall assume all risk and liabilities with respect to changes between the Provisional Large Facility Interconnection ServiceAgreement and the Large Generator Interconnection Agreement, including changes in output limits and Interconnection the cost responsibilities for the Attachment Facilities, Network UpgradesSystem Upgrade Facilities, Local System Deliverability Upgrades, and/or system protection facilities cost responsibilitiesSystem Protection Facilities.

Appears in 1 contract

Samples: Service Agreement

Provisional Interconnection Service. Upon the request of The Interconnection CustomerCustomer may request, and prior to completion of requisite Interconnection Facilities, Network Upgrades, Local Upgradesand/or System Protection Facilities, or system protection facilities Provisional Interconnection Customer may request limited Interconnection Service at the discretion of Transmission Provider based upon an evaluation that will consider the results of available studies, which terms shall be memorialized in the Interconnection Service AgreementService. Consistent with Tariff, Part VI, Subpart B, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted with the Commission. The Transmission Provider shall determine, through available studies or additional studies as necessarynecessary and at the Interconnection Customer’s expense, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer interconnects without modifications to the Generating Facility or the Transmission System. Transmission Provider shall determine whether any for Provisional Interconnection Facilities, Network Upgrades, Local Upgrades, or system protection facilities that are necessary to meet the requirements of NERC, or any applicable Regional Entity for the interconnection of a new, modified and/or expanded Generating Facility are in place prior to the commencement of Interconnection Service from the Generating FacilityService. Where such available or additional studies indicate that such Interconnection Facilities, Network Upgrades, Local Upgrades, Upgrades and/or system protection facilities System Protection Facilities that are required for the interconnection standard Interconnection Service of a new, modified and/or expanded Generating Facility are not currently in place, Transmission Provider will perform a study, at the Interconnection Customer’s expense, to confirm identify the facilities that are required for Provisional Interconnection Service. If the facilities that are required for Provisional Interconnection Service are in place, Transmission Provider may execute a Provisional Standard Generator Interconnection Agreement, or Interconnection Customer may request the filing of a Provisional Standard Generator Interconnection Agreement, in unexecuted form, with the Commission for Provisional Interconnection Service. The maximum permissible output of the Generating Facility in the Provisional Standard Generator Interconnection Agreement shall be studied and updated annually on a frequency determined by Transmission Provider and at the Interconnection Customer’s expense. The results will be communicated to the Interconnection Customer in writing upon completion of the study. Interconnection Customer assumes all risk and liabilities with respect to changes between the Provisional Standard Generator Interconnection ServiceAgreement and the Standard Generator Interconnection Agreement, including changes in output limits and cost responsibilities for Interconnection Facilities, Network Upgrades, Local Upgrades, Upgrades and/or system protection facilities cost responsibilitiesSystem Protection Facilities.

Appears in 1 contract

Samples: Interconnection Agreement

Provisional Interconnection Service. Upon Prior to the request completion of the Large Facility Interconnection Customer, Procedures and prior to completion of requisite Interconnection Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Distribution Upgrades, or system protection facilities Interconnection Customer System Protection Facilities, the Developer may request limited Interconnection Service at the discretion of Transmission Provider based upon an evaluation that will consider the results of available studiesfor Provisional Interconnection Service. NYISO, which terms shall be memorialized in the Interconnection Service Agreement. Consistent with Tariff, Part VI, Subpart B, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted conjunction with the Commission. Connecting Transmission Provider Owner, shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer the SERVICE AGREEMENT NO. 2672 Developer interconnects without modifications to the Large Generating Facility or the New York State Transmission SystemSystem (or Distribution System as applicable). NYISO, in conjunction with the Connecting Transmission Provider Owner, shall determine whether any Interconnection Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, or system protection facilities that System Protection Facilities, which are necessary to meet the requirements of NERCApplicable Laws and Regulations, or any applicable Regional Entity for the interconnection of a newApplicable Reliability Standards, modified and/or expanded Generating Facility and Good Utility Practice, are in place prior to the commencement of Interconnection Service interconnection service from the Generating Large Facility. Where available studies indicate that such Interconnection the Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, and/or system protection facilities that or System Protection Facilities are required for the interconnection of a new, modified and/or expanded Generating Large Facility but such facilities are not currently in place, NYISO, in conjunction with the Connecting Transmission Provider Owner, will perform a study, at the Interconnection CustomerDeveloper’s expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Generating Large Facility in the Provisional Large Facility Interconnection Agreement shall be studied studied, at the Developer’s expense, and updated annually and at the Interconnection Customer’s expenseannually. The results will be communicated NYISO shall issue the study’s findings in writing to the Developer and Connecting Transmission Owner(s). Following a determination by XXXXX, in conjunction with the Connecting Transmission Owner, that the Developer may reliably provide Provisional Interconnection Customer in writing upon completion Service, NYISO shall tender to the Developer and Connecting Transmission Owner, a Provisional Large Facility Interconnection Agreement. NYISO, Developer, and Connecting Transmission Owner may execute the Provisional Large Facility Interconnection Agreement, or the Developer may request the filing of an unexecuted Provisional Large Facility Interconnection Agreement with the studyCommission. Interconnection Customer assumes The Developer shall assume all risk and liabilities with respect to changes between the Provisional Large Facility Interconnection ServiceAgreement and the Large Generator Interconnection Agreement, including changes in output limits and Interconnection the cost responsibilities for the Attachment Facilities, Network UpgradesSystem Upgrade Facilities, Local System Deliverability Upgrades, and/or system protection facilities cost responsibilitiesSystem Protection Facilities.

Appears in 1 contract

Samples: Service Agreement

Provisional Interconnection Service. Upon Prior to the request completion of the Large Facility Interconnection Customer, Procedures and prior to completion of requisite Interconnection Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Distribution Upgrades, or system protection facilities Interconnection Customer System Protection Facilities, the Developer may request limited Interconnection Service at the discretion of Transmission Provider based upon an evaluation that will consider the results of available studiesfor Provisional Interconnection Service. NYISO, which terms shall be memorialized in the Interconnection Service Agreement. Consistent with Tariff, Part VI, Subpart B, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted conjunction with the Commission. Connecting Transmission Provider Owner, shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer the Developer interconnects without modifications to the Large Generating Facility or the New York State Transmission SystemSystem (or Distribution System as applicable). NYISO, in conjunction with the Connecting Transmission Provider Owner, shall determine whether any Interconnection Attachment Facilities, Network SERVICE AGREEMENT NO. 2452 Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, or system protection facilities that System Protection Facilities, which are necessary to meet the requirements of NERCApplicable Laws and Regulations, or any applicable Regional Entity for the interconnection of a newApplicable Reliability Standards, modified and/or expanded Generating Facility and Good Utility Practice, are in place prior to the commencement of Interconnection Service interconnection service from the Generating Large Facility. Where available studies indicate that such Interconnection the Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, and/or system protection facilities that or System Protection Facilities are required for the interconnection of a new, modified and/or expanded Generating Large Facility but such facilities are not currently in place, NYISO, in conjunction with the Connecting Transmission Provider Owner, will perform a study, at the Interconnection CustomerDeveloper’s expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Generating Large Facility in the Provisional Large Facility Interconnection Agreement shall be studied studied, at the Developer’s expense, and updated annually and at the Interconnection Customer’s expenseannually. The results will be communicated NYISO shall issue the study’s findings in writing to the Developer and Connecting Transmission Owner(s). Following a determination by NYISO, in conjunction with the Connecting Transmission Owner, that the Developer may reliably provide Provisional Interconnection Customer in writing upon completion Service, NYISO shall tender to the Developer and Connecting Transmission Owner, a Provisional Large Facility Interconnection Agreement. NYISO, Developer, and Connecting Transmission Owner may execute the Provisional Large Facility Interconnection Agreement, or the Developer may request the filing of an unexecuted Provisional Large Facility Interconnection Agreement with the studyCommission. Interconnection Customer assumes The Developer shall assume all risk and liabilities with respect to changes between the Provisional Large Facility Interconnection ServiceAgreement and the Large Generator Interconnection Agreement, including changes in output limits and Interconnection the cost responsibilities for the Attachment Facilities, Network UpgradesSystem Upgrade Facilities, Local System Deliverability Upgrades, and/or system protection facilities cost responsibilitiesSystem Protection Facilities.

Appears in 1 contract

Samples: Service Agreement

Provisional Interconnection Service. Upon the request of Interconnection Customer, and prior to completion of requisite Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, or system protection facilities System Protection Facilities Transmission Provider may execute a Provisional Generator Interconnection Agreement or Interconnection Customer may request the filing of an unexecuted Provisional Generator Interconnection Agreement with the Interconnection Customer for limited Interconnection Service interconnection service at the discretion of Transmission Provider based upon an evaluation that will consider the results of available studies, which terms shall be memorialized in the Interconnection Service Agreement. Consistent with Tariff, Part VI, Subpart B, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted with the Commission. Transmission Provider shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer interconnects without modifications to the Generating Facility or the Transmission SystemProvider’s system. Transmission Provider shall determine whether any Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, or system protection facilities System Protection Facilities that are necessary to meet the requirements of NERC, or any applicable Regional Entity for the interconnection of a new, modified and/or expanded Generating Facility are in place prior to the commencement of Interconnection Service interconnection service from the Generating Facility. Where available studies FERC Electric Tariff Generator Interconnection Agreement (GIA) ATTACHMENTS 92.0.0 indicate that such Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, and/or system protection facilities System Protection Facilities that are required for the interconnection of a new, modified and/or expanded Generating Facility are not currently in place, Transmission Provider will perform a study, at the Interconnection Customer’s expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Generating Facility in the Provisional Generator Interconnection Agreement shall be studied and updated annually and at the Interconnection Customer’s expense. The results will be communicated to the Interconnection Customer in writing upon completion of the studyon a quarterly basis. Interconnection Customer assumes all risk and liabilities with respect to changes between the Provisional Generator Interconnection ServiceAgreement and the Generator Interconnection Agreement, including changes in output limits and Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, and/or system protection facilities System Protection Facilities cost responsibilities.

Appears in 1 contract

Samples: Generator Interconnection Agreement

Provisional Interconnection Service. Upon Prior to the request completion of the Large Facility Interconnection Customer, Procedures and prior to completion of requisite Interconnection Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Distribution Upgrades, or system protection facilities Interconnection Customer System Protection Facilities, the Developer may request limited Interconnection Service at the discretion of Transmission Provider based upon an evaluation that will consider the results of available studiesfor Provisional Interconnection Service. NYISO, which terms shall be memorialized in the Interconnection Service Agreement. Consistent with Tariff, Part VI, Subpart B, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted conjunction with the Commission. Connecting Transmission Provider Owner, shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer the Developer interconnects without modifications to the Large Generating Facility or the New York State Transmission SystemSystem (or Distribution System as applicable). NYISO, in conjunction with the Connecting Transmission Provider Owner, shall determine whether any Interconnection Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, or system protection facilities that System Protection Facilities, which are necessary to meet the requirements of NERCApplicable Laws and Regulations, or any applicable Regional Entity for the interconnection of a newApplicable Reliability Standards, modified and/or expanded Generating Facility and Good Utility Practice, are in place prior to the commencement of Interconnection Service interconnection service from the Generating Large Facility. Where available studies indicate that such Interconnection the Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, and/or system protection facilities that or System Protection Facilities are required for the interconnection of a new, modified and/or expanded Generating Large Facility but such facilities are not currently in place, NYISO, in conjunction with the Connecting Transmission Provider Owner, will perform a study, at the Interconnection CustomerDeveloper’s SERVICE AGREEMENT NO. 1894 expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Generating Large Facility in the Provisional Large Facility Interconnection Agreement shall be studied studied, at the Developer’s expense, and updated annually and at the Interconnection Customer’s expenseannually. The results will be communicated NYISO shall issue the study’s findings in writing to the Developer and Connecting Transmission Owner(s). Following a determination by NYISO, in conjunction with the Connecting Transmission Owner, that the Developer may reliably provide Provisional Interconnection Customer in writing upon completion Service, NYISO shall tender to the Developer and Connecting Transmission Owner, a Provisional Large Facility Interconnection Agreement. NYISO, Developer, and Connecting Transmission Owner may execute the Provisional Large Facility Interconnection Agreement, or the Developer may request the filing of an unexecuted Provisional Large Facility Interconnection Agreement with the studyCommission. Interconnection Customer assumes The Developer shall assume all risk and liabilities with respect to changes between the Provisional Large Facility Interconnection ServiceAgreement and the Large Generator Interconnection Agreement, including changes in output limits and Interconnection the cost responsibilities for the Attachment Facilities, Network UpgradesSystem Upgrade Facilities, Local System Deliverability Upgrades, and/or system protection facilities cost responsibilitiesSystem Protection Facilities.

Appears in 1 contract

Samples: Service Agreement

Provisional Interconnection Service. Upon Prior to the request completion of the Large Facility Interconnection Customer, Procedures and prior to completion of requisite Interconnection Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Distribution Upgrades, or system protection facilities Interconnection Customer System Protection Facilities, the Developer may request limited Interconnection Service at the discretion of Transmission Provider based upon an evaluation that will consider the results of available studiesfor Provisional Interconnection Service. NYISO, which terms shall be memorialized in the Interconnection Service Agreement. Consistent with Tariff, Part VI, Subpart B, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted conjunction with the Commission. Connecting Transmission Provider Owner, shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer the Developer interconnects without modifications to the Large Generating Facility or the New York State Transmission SystemSystem (or Distribution System as applicable). NYISO, in conjunction with the Connecting Transmission Provider Owner, shall determine whether any Interconnection Attachment Facilities, Network SERVICE AGREEMENT NO. 2473 Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, or system protection facilities that System Protection Facilities, which are necessary to meet the requirements of NERCApplicable Laws and Regulations, or any applicable Regional Entity for the interconnection of a newApplicable Reliability Standards, modified and/or expanded Generating Facility and Good Utility Practice, are in place prior to the commencement of Interconnection Service interconnection service from the Generating Large Facility. Where available studies indicate that such Interconnection the Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, and/or system protection facilities that or System Protection Facilities are required for the interconnection of a new, modified and/or expanded Generating Large Facility but such facilities are not currently in place, NYISO, in conjunction with the Connecting Transmission Provider Owner, will perform a study, at the Interconnection CustomerDeveloper’s expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Generating Large Facility in the Provisional Large Facility Interconnection Agreement shall be studied studied, at the Developer’s expense, and updated annually and at the Interconnection Customer’s expenseannually. The results will be communicated NYISO shall issue the study’s findings in writing to the Developer and Connecting Transmission Owner(s). Following a determination by XXXXX, in conjunction with the Connecting Transmission Owner, that the Developer may reliably provide Provisional Interconnection Customer in writing upon completion Service, NYISO shall tender to the Developer and Connecting Transmission Owner, a Provisional Large Facility Interconnection Agreement. NYISO, Developer, and Connecting Transmission Owner may execute the Provisional Large Facility Interconnection Agreement, or the Developer may request the filing of an unexecuted Provisional Large Facility Interconnection Agreement with the studyCommission. Interconnection Customer assumes The Developer shall assume all risk and liabilities with respect to changes between the Provisional Large Facility Interconnection ServiceAgreement and the Large Generator Interconnection Agreement, including changes in output limits and Interconnection the cost responsibilities for the Attachment Facilities, Network UpgradesSystem Upgrade Facilities, Local System Deliverability Upgrades, and/or system protection facilities cost responsibilitiesSystem Protection Facilities.

Appears in 1 contract

Samples: Service Agreement

Provisional Interconnection Service. Upon the request of Interconnection Customer, and prior to completion of requisite Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, or system protection facilities System Protection Facilities Transmission Provider may execute a Provisional Large Generator Interconnection Agreement or Interconnection Customer may request the filing of an unexecuted Provisional Large Generator Interconnection Agreement with the Interconnection Customer for limited Interconnection Service at the discretion of Transmission Provider based upon an evaluation that will consider the results of available studies, which terms shall be memorialized in the Interconnection Service Agreement. Consistent with Tariff, Part VI, Subpart B, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted with the Commission. Transmission Provider shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer interconnects without modifications to the Generating Facility or the Transmission System. Transmission Provider shall determine whether any Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, or system protection facilities System Protection Facilities that are necessary to meet the requirements of NERC, or any applicable Regional Entity for the interconnection of a new, modified and/or expanded Generating Facility are in place prior to the commencement of Interconnection Service from the Generating Facility. Where available studies indicate that such such, Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, and/or system protection facilities System Protection Facilities that are required for the interconnection of a new, modified and/or expanded Generating Facility are not currently in place, Transmission Provider will perform a study, at the Interconnection Customer’s expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Generating Facility in the Provisional Large Generator Interconnection Agreement shall be studied and updated annually quarterly and at the Interconnection Customer’s expense. The results will be communicated to the Interconnection Customer in writing upon completion of the study. Interconnection Customer assumes all risk and liabilities with respect to changes between the Provisional Large Generator Interconnection ServiceAgreement and the Large Generator Interconnection Agreement, including changes in output limits and Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, and/or system protection facilities System Protection Facilities cost responsibilities.

Appears in 1 contract

Samples: Large Generator Interconnection Agreement

Provisional Interconnection Service. Upon the request of Interconnection Customer, Customer and prior to completion of requisite Interconnection Facilities, Network Upgrades, Local Upgradesor System Protection Facilities, Transmission Provider may execute a Provisional Standard Generator Interconnection Agreement or system protection facilities Interconnection Customer may request the filing of an unexecuted Provisional Standard Generator Interconnection Agreement with the Interconnection Customer for limited Interconnection Service at the discretion of Transmission Provider based upon an evaluation that will consider the results of available studies, which terms shall be memorialized in the Interconnection Service Agreement. Consistent with Tariff, Part VI, Subpart B, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted with the Commission. Transmission Provider shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer interconnects without modifications to the Generating Facility or the Transmission System. Transmission Provider shall determine whether any Interconnection Facilities, Network Upgrades, Local Upgrades, Upgrades or system protection facilities System Protection Facilities that are necessary to meet the Applicable Reliability Standards requirements of NERC, or any applicable Regional Entity for the interconnection of a new, modified and/or expanded Generating Facility are in place prior to the commencement of Interconnection Service from the Generating Facility. Where available studies indicate that such such, Interconnection Facilities, Network Upgrades, Local Upgrades, Upgrades and/or system protection facilities System Protection Facilities that are required for the interconnection of a new, modified and/or expanded Generating Facility are not currently in place, Transmission Provider will perform a study, at the Interconnection Customer’s expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Generating Facility in the Provisional Standard Generator Interconnection Agreement shall be studied and updated annually [on a frequency determined by Transmission Provider and at the Interconnection Customer’s expense. The results will be communicated to the Interconnection Customer in writing upon completion of the study. Interconnection Customer assumes all risk and liabilities with respect to changes between the Provisional Standard Generator Interconnection ServiceAgreement and the Standard Generator Interconnection Agreement, including changes in output limits and Interconnection Facilities, Network Upgrades, Local Upgrades, Upgrades and/or system protection facilities System Protection Facilities cost responsibilities.

Appears in 1 contract

Samples: Interconnection Agreement

Provisional Interconnection Service. Upon the request of Interconnection CustomerProject Developer, and prior to completion of requisite Interconnection Facilities, Distribution Upgrades, Network Upgrades, Local Stand Alone Network Upgrades, or system protection facilities Interconnection Customer Project Developer may request limited Interconnection Service at the discretion of Transmission Provider based upon an evaluation that will consider the results of available studies, which terms shall be memorialized in the Generation Interconnection Service Agreement. Consistent with Agreement to be tendered by Transmission Provider to Project subject to the execution timelines and provisions set forth in Tariff, Part VI, Subpart BIX, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted with the Commission1500. Transmission Provider shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer Project Developer interconnects without modifications to the Generating Facility or Merchant Transmission Facility or the Transmission System. Transmission Provider shall determine whether any Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, or Stand Alone Network Upgrades, or system protection facilities that are necessary to meet the requirements of NERC, or any applicable Regional Entity for the interconnection of a new, modified and/or expanded Generating Facility or Merchant Transmission Facility are in place prior to the commencement of Interconnection Service from the Generating Facility or Merchant Transmission Facility. Where available studies indicate that such Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, or Stand Alone Network Upgrades, and/or system protection facilities that are required for the interconnection of a new, modified and/or expanded Generating Facility or Merchant Transmission Facility are not currently in place, Transmission Provider will perform a study, at the Interconnection CustomerProject Developer’s expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Generating Facility or Merchant Transmission Facility shall be studied and updated annually and at the Interconnection CustomerProject Developer’s expense. The results will be communicated to the Interconnection Customer Project Developer in writing upon completion of the study. Interconnection Customer Project Developer assumes all risk and liabilities with respect to the Provisional Interconnection Service, including changes in output limits and Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, or Stand Alone Network Upgrades, and/or system protection facilities cost responsibilities.

Appears in 1 contract

Samples: Generation Interconnection Agreement

Provisional Interconnection Service. Upon Prior to the request completion of the Large Facility Interconnection Customer, Procedures and prior to completion of requisite Interconnection Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Distribution Upgrades, or system protection facilities Interconnection Customer System Protection Facilities, the Developer may request limited Interconnection Service at the discretion of Transmission Provider based upon an evaluation that will consider the results of available studiesfor Provisional Interconnection Service. NYISO, which terms shall be memorialized in the Interconnection Service Agreement. Consistent with Tariff, Part VI, Subpart B, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted conjunction with the Commission. Connecting Transmission Provider Owner, shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer the Developer interconnects without modifications to the Large Generating Facility or the New York State Transmission SystemSystem (or Distribution System as applicable). NYISO, in conjunction with the Connecting Transmission Provider Owner, shall determine whether any Interconnection Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, or system protection facilities that System Protection Facilities, which are necessary to meet the requirements of NERCApplicable Laws and Regulations, or any applicable Regional Entity for the interconnection of a newApplicable Reliability Standards, modified and/or expanded Generating Facility and Good Utility Practice, are in place prior to the commencement of Interconnection Service interconnection service from the Generating Large Facility. Where available studies indicate that such Interconnection the Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, and/or system protection facilities that or System Protection Facilities are required for the interconnection of a new, modified and/or expanded Generating Large Facility but such facilities are not currently in place, NYISO, in conjunction with the Connecting Transmission Provider Owner, will perform a study, at the Interconnection CustomerDeveloper’s expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Generating Large Facility in the Provisional Large Facility Interconnection Agreement shall be studied studied, at the Developer’s expense, and updated annually and at the Interconnection Customer’s expenseannually. The results will be communicated NYISO shall issue the study’s findings in writing to the Interconnection Customer Developer and Connecting Transmission Owner(s). Following a determination by NYISO, in writing upon completion of conjunction with the study. Interconnection Customer assumes all risk and liabilities with respect to Connecting Transmission Owner, that the Developer may reliably provide Provisional Interconnection Service, including changes in output limits NYISO shall tender to the Developer and Connecting Transmission Owner, a Provisional Large Facility Interconnection FacilitiesAgreement. NYISO, Network UpgradesDeveloper, Local Upgradesand Connecting Transmission Owner may execute the Provisional Large Facility Interconnection Agreement, and/or system protection facilities cost responsibilities.or the Developer may request the filing of an unexecuted Provisional Large Facility

Appears in 1 contract

Samples: Service Agreement

Provisional Interconnection Service. Upon the request of Interconnection Customer, and prior to completion of requisite Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, or system protection facilities System Protection Facilities Transmission Provider may execute a Provisional Large Generator Interconnection Agreement or Interconnection Customer may request the filing of an unexecuted Provisional Large Generator Interconnection Agreement with the Interconnection Customer for limited Interconnection Service at the discretion of Transmission Provider based upon an evaluation that will consider the results of available studies, which terms shall be memorialized in the Interconnection Service Agreement. Consistent with Tariff, Part VI, Subpart B, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted with the Commission. Transmission Provider shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer interconnects without modifications to the Generating Facility or the Transmission System. Transmission Provider shall determine whether any Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, or system protection facilities System Protection Facilities that are necessary to meet the requirements of NERC, or any applicable Regional Entity for the interconnection of a new, modified and/or expanded Generating Facility are in place prior to the commencement of Interconnection Service from the Generating Facility. Where available studies indicate that such such, Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, and/or system protection facilities System Protection Facilities that are required for the interconnection of a new, modified and/or expanded Generating Facility are not currently in place, Transmission Provider will perform a study, at the Interconnection Customer’s Customer’s expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Generating Facility in the Provisional Large Generator Interconnection Agreement shall be studied and updated no more frequently than annually and at the Interconnection Customer’s expense. The results will be communicated unless a relevant change to the Interconnection Customer in writing upon completion of the studyTransmission System occurs. Interconnection Customer assumes all risk and liabilities with respect to changes between the Provisional Large Generator Interconnection ServiceAgreement and the Large Generator Interconnection Agreement, including changes in output limits and Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, and/or system protection facilities System Protection Facilities cost responsibilities.

Appears in 1 contract

Samples: Surplus Large Generator Interconnection Agreement

Provisional Interconnection Service. Upon Prior to the request completion of the Large Facility Interconnection Customer, Procedures and prior to completion of requisite Interconnection Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Distribution Upgrades, or system protection facilities Interconnection Customer System Protection Facilities, the Developer may request limited Interconnection Service at the discretion of Transmission Provider based upon an evaluation that will consider the results of available studiesfor Provisional Interconnection Service. NYISO, which terms shall be memorialized in the Interconnection Service Agreement. Consistent with Tariff, Part VI, Subpart B, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted conjunction with the Commission. Connecting Transmission Provider Owner, shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer the Developer interconnects without modifications to the Large Generating Facility or the New York State Transmission SystemSystem (or Distribution System as applicable). NYISO, in conjunction with the Connecting Transmission Provider Owner, shall determine whether any Interconnection Attachment Facilities, Network SERVICE AGREEMENT NO. 2593 Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, or system protection facilities that System Protection Facilities, which are necessary to meet the requirements of NERCApplicable Laws and Regulations, or any applicable Regional Entity for the interconnection of a newApplicable Reliability Standards, modified and/or expanded Generating Facility and Good Utility Practice, are in place prior to the commencement of Interconnection Service interconnection service from the Generating Large Facility. Where available studies indicate that such Interconnection the Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, and/or system protection facilities that or System Protection Facilities are required for the interconnection of a new, modified and/or expanded Generating Large Facility but such facilities are not currently in place, NYISO, in conjunction with the Connecting Transmission Provider Owner, will perform a study, at the Interconnection CustomerDeveloper’s expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Generating Large Facility in the Provisional Large Facility Interconnection Agreement shall be studied studied, at the Developer’s expense, and updated annually and at the Interconnection Customer’s expenseannually. The results will be communicated NYISO shall issue the study’s findings in writing to the Developer and Connecting Transmission Owner(s). Following a determination by XXXXX, in conjunction with the Connecting Transmission Owner, that the Developer may reliably provide Provisional Interconnection Customer in writing upon completion Service, NYISO shall tender to the Developer and Connecting Transmission Owner, a Provisional Large Facility Interconnection Agreement. NYISO, Developer, and Connecting Transmission Owner may execute the Provisional Large Facility Interconnection Agreement, or the Developer may request the filing of an unexecuted Provisional Large Facility Interconnection Agreement with the studyCommission. Interconnection Customer assumes The Developer shall assume all risk and liabilities with respect to changes between the Provisional Large Facility Interconnection ServiceAgreement and the Large Generator Interconnection Agreement, including changes in output limits and Interconnection the cost responsibilities for the Attachment Facilities, Network UpgradesSystem Upgrade Facilities, Local System Deliverability Upgrades, and/or system protection facilities cost responsibilitiesSystem Protection Facilities.

Appears in 1 contract

Samples: Service Agreement

Provisional Interconnection Service. Upon the request of Interconnection Customer, and prior to completion of requisite Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, or system protection facilities System Protection Facilities Transmission Provider may execute a Provisional Large Generator Interconnection Agreement or Interconnection Customer may request the filing of an unexecuted Provisional Large Generator Interconnection Agreement with the Interconnection Customer for limited Interconnection Service interconnection service at the discretion of Transmission Provider based upon an evaluation that will consider the results of available studies, which terms shall be memorialized in the Interconnection Service Agreement. Consistent with Tariff, Part VI, Subpart B, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted with the Commission. Transmission Provider shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer interconnects without modifications to the Generating Facility or the Transmission System. Transmission Provider shall determine whether any Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, or system protection facilities System Protection Facilities that are necessary to meet the requirements of NERC, or any applicable Regional Entity for the interconnection of a new, modified and/or expanded Generating Facility are in place prior to the commencement of Interconnection Service from the Generating Facility. Where available studies indicate that such such, Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, and/or system protection facilities System Protection Facilities that are required for the interconnection of a new, modified and/or expanded Generating Facility are not currently in place, Transmission Provider will perform a study, at the Interconnection Customer’s expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Generating Facility in the Provisional Large Generator Interconnection Agreement shall be studied and updated annually and at the Interconnection Customer’s expense. The results will be communicated to the Interconnection Customer in writing upon completion of the study. Interconnection Customer assumes all risk and liabilities with respect to changes between the Provisional Large Generator Interconnection ServiceAgreement and the Large Generator Interconnection Agreement, including changes in output limits and Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, and/or system protection facilities System Protection Facilities cost responsibilities.

Appears in 1 contract

Samples: Agreement

Provisional Interconnection Service. Upon the request of Interconnection Customer, and prior to completion of requisite Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, or system protection facilities Interconnection Customer may request limited Interconnection Service at System Protection Facilities and after completion of the discretion of NEPA process and a decision to approve the project Transmission Provider based upon an evaluation that will consider the results of available studies, which terms shall be memorialized in the Interconnection Service Agreement. Consistent with Tariff, Part VI, Subpart B, section 212.4, Interconnection Customer may execute the a Provisional Large Generator Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted with the Commission. Transmission Provider shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer interconnects without modifications to the Generating Facility or the Transmission SystemProvider’s system. Transmission Provider shall determine whether any Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, or system protection facilities System Protection Facilities that are necessary to meet the requirements of NERC, or any applicable Regional Entity for the interconnection of a new, modified and/or expanded Generating Facility are in place prior to the commencement of Interconnection Service from the Generating Facility. Where available studies indicate that such such, Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, and/or system protection facilities System Protection Facilities that are required for the interconnection of a new, modified and/or expanded Generating Facility are not currently in place, Transmission Provider will perform a study, at the Interconnection Customer’s expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Generating Facility in the Provisional Large Generator Interconnection Agreement shall be studied and updated annually an annual basis and at the Interconnection Customer’s expense. The results will be communicated to the Interconnection Customer in writing upon completion of the study. Interconnection Customer assumes all risk and liabilities with respect to changes between the Provisional Large Generator Interconnection ServiceAgreement and the Large Generator Interconnection Agreement, including changes in output limits and Interconnection Facilities, Network Upgrades, Local Distribution Upgrades, and/or system protection facilities System Protection Facilities cost responsibilities.

Appears in 1 contract

Samples: Study Agreement

Provisional Interconnection Service. Upon Prior to the request completion of the Large Facility Interconnection Customer, Procedures and prior to completion of requisite Interconnection Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Distribution Upgrades, or system protection facilities Interconnection Customer System Protection Facilities, the Developer may request limited Interconnection Service at the discretion of Transmission Provider based upon an evaluation that will consider the results of available studiesfor Provisional Interconnection Service. NYISO, which terms shall be memorialized in the Interconnection Service Agreement. Consistent with Tariff, Part VI, Subpart B, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted conjunction with the Commission. Connecting Transmission Provider Owner, shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer the Developer interconnects without modifications to the Large Generating Facility or the New York State Transmission SystemSystem (or Distribution System as applicable). NYISO, in conjunction with the Connecting Transmission Provider Owner, shall determine whether any Interconnection Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, or system protection facilities that System Protection Facilities, which are necessary to meet the requirements of NERCApplicable Laws and Regulations, or any applicable Regional Entity for the interconnection of a newApplicable Reliability Standards, modified and/or expanded Generating Facility and Good Utility Practice, are in place prior to the commencement of Interconnection Service interconnection service from the Generating Large Facility. Where available studies indicate that such Interconnection the Attachment Facilities, Network Distribution Upgrades, Local System Upgrade Facilities, System Deliverability Upgrades, and/or system protection facilities that or System Protection Facilities are required for the interconnection of a new, modified and/or expanded Generating Large Facility but such facilities are not currently in place, NYISO, in conjunction with the Connecting Transmission Provider Owner, will perform a study, at the Interconnection CustomerDeveloper’s expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Generating Large Facility in the Provisional Large Facility Interconnection Agreement shall be studied studied, at the Developer’s expense, and updated annually and at the Interconnection Customer’s expenseannually. The results will be communicated NYISO shall issue the study’s findings in writing to the Developer and Connecting Transmission Owner(s). Following a determination by XXXXX, in conjunction with the Connecting Transmission Owner, that the Developer may reliably provide Provisional Interconnection Customer in writing upon completion Service, NYISO shall tender to the Developer and Connecting Transmission Owner, a Provisional Large Facility Interconnection Agreement. NYISO, Developer, and Connecting Transmission Owner may execute the Provisional Large Facility Interconnection Agreement, or the Developer may request the filing of an unexecuted Provisional Large Facility Interconnection Agreement with the studyCommission. Interconnection Customer assumes The Developer shall assume all risk and liabilities with respect to changes between the Provisional Large Facility Interconnection ServiceAgreement and the Large Generator Interconnection Agreement, including changes in output limits and Interconnection the cost responsibilities for the Attachment Facilities, Network UpgradesSystem Upgrade Facilities, Local System Deliverability Upgrades, and/or system protection facilities cost responsibilities.System Protection Facilities. SERVICE AGREEMENT NO. 2689

Appears in 1 contract

Samples: Service Agreement