Pumping Unit Field Performance Test Sample Clauses

Pumping Unit Field Performance Test. (Acceptance Test) After equipment has been completely installed, field tests shall be performed by the Contractor which shall be witnessed by District. Each pumping unit furnished hereunder shall be operated for a period of two weeks during which time acceptance tests may be conducted. Head capacity, overall efficiency, and input and output horsepower shall be determined for at least three different operating conditions in the operating range of the pumping unit, including the specified design point, for comparison with the certified pump curves and the factory performance test results, both as approved by District. Pumping units (pump and motor) shall perform in the field substantially in accordance with the certified pump curves and the factory performance test results as adjusted for field conditions. If, in the opinion of District, the equipment furnished does not perform in accordance with these Specifications, Contractor shall promptly make all necessary repairs or corrections so that the equipment fully complies with these Specifications. Contractor shall remove, restore, and replace the equipment if required. Factory and field performance tests shall be rerun if necessary. Pump manufacturer's field service engineer shall assist District in the proper conduct of the above field acceptance tests.
AutoNDA by SimpleDocs

Related to Pumping Unit Field Performance Test

  • Acceptance/Performance Test 4.7.1 Prior to synchronization of the Power Project, the SPD shall be required to get the Project certified for the requisite acceptance/performance test as may be laid down by Central Electricity Authority or an agency identified by the central government to carry out testing and certification for the solar power projects.

  • Performance Testing 7.2.1 The Design-Builder shall direct and supervise the tests and, if necessary, the retests of the Plant using Design-Builder’s supervisory personnel and the Air Emissions Tester shall conduct the air emissions test, in each case, in accordance with the testing procedures set forth in Exhibit A (the “Performance Tests”), to demonstrate, at a minimum, compliance with the Performance Guarantee Criteria. Owner is responsible for obtaining Air Emissions Tester and for ensuring Air Emissions Tester’s timely performance. Design-Builder shall cooperate with the Air Emissions Tester to facilitate performance of all air emissions tests. Design-Builder shall not be held responsible for the actions of Owner’s employees and third parties involved in the Performance Testing, including but not limited to Air Emissions Tester.

  • Ongoing Performance Measures The Department intends to use performance-reporting tools in order to measure the performance of Contractor(s). These tools will include the Contractor Performance Survey (Exhibit H), to be completed by Customers on a quarterly basis. Such measures will allow the Department to better track Vendor performance through the term of the Contract(s) and ensure that Contractor(s) consistently provide quality services to the State and its Customers. The Department reserves the right to modify the Contractor Performance Survey document and introduce additional performance-reporting tools as they are developed, including online tools (e.g. tools within MFMP or on the Department's website).

  • OUTCOME IF GRANTEE CANNOT COMPLETE REQUIRED PERFORMANCE Unless otherwise specified in this Statement of Work, if Grantee cannot complete or otherwise comply with a requirement included in this Statement of Work, HHSC, at its sole discretion, may impose remedies or sanctions outlined under Contract Attachment C, Local Mental Health Authority Special Conditions, Section 7.09 (Remedies and Sanctions).

  • Direct Trunked Transport 7.3.2.1 Either Party may elect to purchase direct trunked transport from the other Party.

  • Registry Performance Specifications Registry Performance Specifications for operation of the TLD will be as set forth in Specification 10 attached hereto (“Specification 10”). Registry Operator shall comply with such Performance Specifications and, for a period of at least one (1) year, shall keep technical and operational records sufficient to evidence compliance with such specifications for each calendar year during the Term.

  • PERFORMANCE OUTCOMES 8 A. CONTRACTOR shall achieve performance objectives, tracking and reporting Performance 9 Outcome Objective statistics in monthly programmatic reports, as appropriate. ADMINISTRATOR 10 recognizes that alterations may be necessary to the following services to meet the objectives, and,

  • CORRECTIVE MEASURE The contractor shall repair any deficiencies in excess of the performance guideline.

  • CONTRACTOR PERFORMANCE AUDIT The Contractor shall allow the Authorized User to assess Contractor’s performance by providing any materials requested in the Authorized User Agreement (e.g., page load times, response times, uptime, and fail over time). The Authorized User may perform this Contractor performance audit with a third party at its discretion, at the Authorized User’s expense. The Contractor shall perform an independent audit of its Data Centers, at least annually, at Contractor expense. The Contractor will provide a data owner facing audit report upon request by the Authorized User. The Contractor shall identify any confidential, trade secret, or proprietary information in accordance with Appendix B, Section 9(a), Confidential/Trade Secret Materials.

  • Drug Test The compulsory production and submission of urine and/or blood, in accordance with departmental procedures, by an employee for chemical analysis to detect prohibited drug usage.