Re-demonstration of Committed Capacity Sample Clauses

Re-demonstration of Committed Capacity. Each Party will have the right to request a Performance Test to re-determine the Facility’s Committed Capacity to be performed during the period from March 15 to April 15 of each Annual Period upon ten (10) Business Days’ written notice to the other Party; provided, however, that the Committed Capacity will not exceed one hundred and ten percent (110%) of the Contract Capacity; provided, further, that upon consent by both Parties, such Performance Test may be performed outside the period of March 15 to April 15 of each Annual Period; provided, further, that no such Performance Test may be scheduled during any period of an outage or Force Majeure Event. The requesting Party will bear the costs and expenses of any such Performance Test to re-determine the Committed Capacity; provided, however, that QF will bear such costs and expenses of any Performance Test requested by Georgia Power if the Committed Capacity determined in such Performance Test is less than the Committed Capacity immediately prior to such Performance Test.
AutoNDA by SimpleDocs

Related to Re-demonstration of Committed Capacity

  • Local Circuit Switching Capability, including Tandem Switching Capability 4.2.1 Local circuit switching capability is defined as: (A) line-side facilities, which include, but are not limited to, the connection between a loop termination at a main distribution frame and a switch line card; (B) trunk-side facilities, which include, but are not limited to, the connection between trunk termination at a trunk-side cross-connect panel and a switch trunk card; (C) switching provided by remote switching modules; and (D) all features, functions, and capabilities of the switch, which include, but are not limited to: (1) the basic switching function of connecting lines to lines, line to trunks, trunks to lines, and trunks to trunks, as well as the same basic capabilities made available to BellSouth’s customers, such as a telephone number, white page listings, and dial tone; and (2) all other features that the switch is capable of providing, including but not limited to customer calling, customer local area signaling service features, and Centrex, as well as any technically feasible customized routing functions provided by the switch. Any features that are not currently available but are technically feasible through the switch can be requested through the BFR/NBR process.

  • Under-Frequency and Over Frequency Conditions The New York State Transmission System is designed to automatically activate a load- shed program as required by the NPCC in the event of an under-frequency system disturbance. Developer shall implement under-frequency and over-frequency relay set points for the Large Generating Facility as required by the NPCC to ensure “ride through” capability of the New York State Transmission System. Large Generating Facility response to frequency deviations of predetermined magnitudes, both under-frequency and over-frequency deviations, shall be studied and coordinated with the NYISO and Connecting Transmission Owner in accordance with Good Utility Practice. The term “ride through” as used herein shall mean the ability of a Generating Facility to stay connected to and synchronized with the New York State Transmission System during system disturbances within a range of under-frequency and over-frequency conditions, in accordance with Good Utility Practice and with NPCC Regional Reliability Reference Directory # 12, or its successor.

  • System Availability System Availability percentage is calculated as follows:  Total MinutesintheMonth −Downtime   System Availability%age =  Total MinutesintheMonth *100    System Availability SLA (“SLA”) 99.5% System Availability percentage during each Month for productive versions Credit 2% of Monthly Subscription Fees for each 1% below SLA, not to exceed 100% of Monthly Subscription Fees Excluded Downtime Total Minutes in the Month attributable to: (i) a Scheduled Downtime for which a Regular Maintenance Window is described in Section 4 below, or (ii) any other Scheduled Downtime according to Section 4 for which the customer has been notified at least five (5) business days prior to such Scheduled Downtime or (iii) unavailability caused by factors outside of SAP’s reasonable control, such as unpredictable and unforeseeable events that could not have been avoided even if reasonable care had been exercised. Scheduled Downtime Scheduled Downtime for the applicable Cloud Services to which customer has subscribed is set forth in Section 4 below entitled “Maintenance Windows for Cloud Services”.

  • General Availability The commitment to availability specified in the letter of appointment shall be subject to mutually acceptable revision. Such revision will occur once per year, or, if mutually agreed between the Employer and the employee, on a more frequent basis. The Employer will issue a revised letter of appointment to reflect approved changes to employee’s general availability.

  • Purchase and sale of Contracted Capacity 4.3.1 Subject to the terms and conditions of this Agreement, the SPD undertakes to sell to SECI and SECI undertakes to pay Tariff for all the energy supplied at the Delivery Point corresponding to the Contracted Capacity.

  • Requesting Price Increase/Required Documentation Contractor must submit a written notification at least thirty (30) calendar days prior to the requested effective date of the change, setting the amount of the increase, along with an itemized list of any increased prices, showing the Contractor’s current price, revised price, the actual dollar difference and the percentage of the price increase by line item. Price change requests must include H-GAC Forms D Offered Item Pricing and E Options Pricing, or the documentation used to submit pricing in the original Response and be supported with substantive documentation (e.g. manufacturer's price increase notices, copies of invoices from suppliers, etc.) clearly showing that Contractor's actual costs have increased per the applicable line item bid. The Producer Price Index (PPI) may be used as partial justification, subject to approval by H-GAC, but no price increase based solely on an increase in the PPI will be allowed. This documentation should be submitted in Excel format to facilitate analysis and updating of the website. The letter and documentation must be sent to the Bids and Specifications manager, Xxxxxxx Xxxxxx, at Xxxxxxx.Xxxxxx@x-xxx.xxx Review/Approval of Requests If H-GAC approves the price increase, Contractor will be notified in writing; no price increase will be effective until Contractor receives this notice. If H-GAC does not approve Contractor’s price increase, Contractor may terminate its performance upon sixty (60) days advance written notice to H-GAC, however Contractor must fulfill any outstanding Purchase Orders. Termination of performance is Contractor’s only remedy if H-GAC does not approve the price increase. H-GAC reserves the right to accept or reject any price change request.

  • Reserved Capacity The maximum amount of capacity and energy that the Transmission Provider agrees to transmit for the Transmission Customer over the Transmission Provider’s Transmission System between the Point(s) of Receipt and the Point(s) of Delivery under Part II of the Tariff. Reserved Capacity shall be expressed in terms of whole megawatts on a sixty (60) minute interval (commencing on the clock hour) basis.

  • DNS name server availability Refers to the ability of a public-­‐DNS registered “IP address” of a particular name server listed as authoritative for a domain name, to answer DNS queries from an Internet user. All the public DNS-­‐registered “IP address” of all name servers of the domain name being monitored shall be tested individually. If 51% or more of the DNS testing probes get undefined/unanswered results from “DNS tests” to a name server “IP address” during a given time, the name server “IP address” will be considered unavailable.

  • Drawings Submitted During the Contract Term Where required to develop maintain and deliver diagrams or other technical schematics regarding the scope of work, Contractor shall do so on an ongoing basis at no additional charge, and must, as a condition of payment, update drawings and plans during the Contract term to reflect additions, alterations, and deletions. Such drawings and diagrams shall be delivered to the Authorized User’s representative.

  • Adjustment to Installed Capacity Estimate Permitted reduction

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!