Reactive Power 1.8.1 The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all similarly situated generators in the New York Control Area on a comparable basis. 1.8.2 The NYISO is required to pay the Interconnection Customer for reactive power, or voltage support service, that the Interconnection Customer provides from the Small Generating Facility in accordance with Rate Schedule 2 of the NYISO Services Tariff.
Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria
Food Service Waste Reduction Requirements Contractor shall comply with the Food Service Waste Reduction Ordinance, as set forth in San Francisco Environment Code Chapter 16, including but not limited to the remedies for noncompliance provided therein.
Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.
Closet I Urinal Requirements Employees Closets Urinals
Materials of Environmental Concern have not been transported or disposed of from the Properties in violation of, or in a manner or to a location that could give rise to liability under, any Environmental Law, nor have any Materials of Environmental Concern been generated, treated, stored or disposed of at, on or under any of the Properties in violation of, or in a manner that could give rise to liability under, any applicable Environmental Law;
Installation requirements As may be further described and set forth in the Scope of services, all installation, integration, and other potentially public works construction activities which may be contemplated by Contractor, shall be performed in accordance with all applicable, laws, rules, and regulations of the District.
GRADUATION REQUIREMENTS I understand that in order to graduate from the program and to receive a certificate of completion, diploma or degree I must successfully complete the required number of scheduled clock hours as specified in the catalog and on the Enrollment Agreement, pass all written and practical examinations with a minimum score of 80%, and complete all required clinical hours and satisfy all financial obligations to the College.
Payment for Reactive Power NYISO shall pay Developer for reactive power or voltage support service that Developer provides from the Large Generating Facility in accordance with the provisions of Rate Schedule 2 of the NYISO Services Tariff.
Encryption Requirements DST will not locally store Fund Data on any laptops or mobile devices (e.g., Blackberries, PDAs) managed by DST.