Reactive Power Supply / Absorption Requirements. Reactive power support shall be provided as specified in Article 9.5 concurrently with meeting all harmonic performance requirements.
AutoNDA by SimpleDocs

Related to Reactive Power Supply / Absorption Requirements

  • ARRANGING FOR FIRM ALL-REQUIREMENTS POWER SUPPLY Competitive Supplier shall participate in or make appropriate arrangements with the ISO-NE, any relevant regional transmission organization, wholesale suppliers or any other entity to ensure an uninterrupted flow of reliable, safe, firm, All-Requirements Power Supply to the Local Distributor for delivery to Participating Consumers, and take Commercially Reasonable steps to cooperate with the NEPOOL, the ISO-NE or any other entity to ensure a source of back-up power in the event that the facilities owned or controlled by Competitive Supplier's affiliates or other sources of power supply are unable to generate and/or deliver All-Requirements Power Supply to the Point of Delivery. In the event the Competitive Supplier is unable to deliver sufficient electricity to the grid to serve Participating Consumers, the Competitive Supplier shall utilize such arrangements as may be necessary to continue to serve Participating Consumers under the terms of this ESA, and shall bear any costs it may incur in carrying out these obligations. Competitive Supplier shall not be responsible to the Town or any Participating Consumers in the event the Local Distributor disconnects, curtails or reduces service to Participating Consumers (notwithstanding whether such disconnection is directed by the ISO- NE) in order to facilitate construction, installation, maintenance, repair, replacement or inspection of any of the Local Distributor’s facilities, to maintain the safety and reliability of the Local Distributor’s electrical system, or due to any other reason, including emergencies, forced outages, potential overloading of the Local Distributor’s transmission and/or distribution circuits, Force Majeure or the non-payment of any distribution service costs or other such costs due for services provided by the Local Distributor to a Participating Consumer.

  • Reactive Power 1.8.1 The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all similarly situated generators in the New York Control Area on a comparable basis.

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • All-Requirements Power Supply The service under which the Competitive Supplier provides all of the electrical energy, capacity, reserves, and ancillary services, transmission services, transmission and distribution losses, congestion management, and other such services or products necessary to provide firm power supply to Participating Consumers at the Point of Delivery.

  • Food Service Waste Reduction Requirements Contractor shall comply with the Food Service Waste Reduction Ordinance, as set forth in San Francisco Environment Code Chapter 16, including but not limited to the remedies for noncompliance provided therein.

  • Occupational First Aid Requirements and Courses (a) The Union and the Employer agree that First Aid Regulations made pursuant to the Workers' Compensation Act shall be fully complied with.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Dangerous Goods, Special Wastes, Pesticides and Harmful Substances Where employees are required to work with or are exposed to any dangerous good, special waste, pesticide or harmful substance, the Employer shall ensure that the employees are adequately trained in the identification, safe handling, use, storage, and/or disposal of same.

  • Specific Order Processes and Requirements 1. Distributor will order Software from SAP using and filling out completely such forms and minimum order requirements as SAP may prescribe from time to time and must comply with any then-current order process for the specific Software product. Where applicable, Distributor agrees to use the electronic means provided by SAP for placing orders.

  • Fire, Life Safety, and Accessibility Codes The following codes, in the versions approved by the Georgia State Fire Marshal/Fire Safety Commissioner and Department of Human Resources, shall be used. The Design Professional will designate any additional codes or special modifications in the Supplementary General Conditions.

Time is Money Join Law Insider Premium to draft better contracts faster.