Reading Data Sample Clauses

Reading Data. Various windows are displayed on the main screen for reading data recorded on a PC Card with the 3196. The data to be read is specified by folder. The following data files within folder can be read: • SET files Setting data • ITV files TIME PLOT data • EVT files EVENT data (lists, voltage/current waveforms, transient waveforms and numerical values) • FLC files Flicker data (Delta V10, IEC) • TRN files Transient waveform data • WDU files Event voltage fluctuation data
AutoNDA by SimpleDocs
Reading Data. Estimated Reading Time Reading time: About 1 minute (reading directly from the flash ATA card to the computer): The reading time is estimated based on the system configuration below. (Example) Computer System Configuration Computer 400-MHz Pentium II OS Microsoft Windows 2000 Professional Memory 128 MB 3196 Data Capacity 256 MB ITV files TIME PLOT (ALL DATA, MAX/MIN/AVE) EVT files 1000 items (all transients) • New data can be read after having read data previously, in which case only the new data is displayed. • Reading a folder containing a large amount of data may take some time. The time required to read the data depends on the computer system. Screen Structures and Common Operations Chapter 3

Related to Reading Data

  • Metering Data At Developer’s expense, the metered data shall be telemetered to one or more locations designated by Connecting Transmission Owner, Developer and NYISO. Such telemetered data shall be used, under normal operating conditions, as the official measurement of the amount of energy delivered from the Large Generating Facility to the Point of Interconnection.

  • Encounter Data Party shall provide encounter data to the Agency of Human Services and/or its departments and ensure further that the data and services provided can be linked to and supported by enrollee eligibility files maintained by the State.

  • Data To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers: Foreign and Domestic Construction Materials Cost Comparison Construction material description Unit of measure Quantity Cost (dollars) * Item 1: Foreign construction material Domestic construction material Item 2 Foreign construction material Domestic construction material [List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.] (*Include all delivery costs to the construction site.]

  • SAMPLE (i) Unless agreed otherwise, wheeled or track lay- ing equipment shall not be operated in areas identified as needing special measures except on roads, landings, tractor roads, or skid trails approved under B5.1 or B6.422. Purchaser may be required to backblade skid trails and other ground disturbed by Purchaser’s Opera- tions within such areas in lieu of cross ditching required under B6.6. Additional special protection measures needed to protect such known areas are identified in C6.24.

  • Other Data The statistical, industry-related and market-related data included in the Registration Statement, the Statutory Prospectus and the Prospectus, if any, are based on or derived from sources that the Company reasonably and in good faith believes are reliable and accurate, and such data agree with the sources from which they are derived.

  • Line Information Database 9.1 LIDB is a transaction-oriented database accessible through Common Channel Signaling (CCS) networks. For access to LIDB, e-Tel must purchase appropriate signaling links pursuant to Section 10 of this Attachment. LIDB contains records associated with End User Line Numbers and Special Billing Numbers. LIDB accepts queries from other Network Elements and provides appropriate responses. The query originator need not be the owner of LIDB data. LIDB queries include functions such as screening billed numbers that provides the ability to accept Collect or Third Number Billing calls and validation of Telephone Line Number based non-proprietary calling cards. The interface for the LIDB functionality is the interface between BellSouth’s CCS network and other CCS networks. LIDB also interfaces to administrative systems.

  • How to Update Your Records You agree to promptly update your registration records if your e-mail address or other information changes. You may update your records, such as your e-mail address, by using the Profile page.

  • Invoice Data The Contractor shall report invoice data from each paid or remitted invoice within 30 calendar days after the end of the reporting quarter, including the invoice data on task orders issued through the GSA AAS Business System Portal. (Note: Whatever method the Contractor chooses (e.g., “each paid” or “remitted”) the Contractor must be consistent in their reporting method throughout the term of the OASIS Contract). If no Invoice Data was received during a required reporting period for a specific task order, the Contractor shall report in the “Zero Invoice Data” screen located in the CPRM system for that particular task order. Regardless of contract type, the Contractor shall report the following into the CPRM:

  • Updated Information Submission by Interconnection Customer The updated information submission by the Interconnection Customer, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days prior to the Trial Operation. The Interconnection Customer shall submit a completed copy of the Electric Generating Unit data requirements contained in Appendix 1 to the LGIP. It shall also include any additional information provided to the Participating TO and the CAISO for the Interconnection Studies. Information in this submission shall be the most current Electric Generating Unit design or expected performance data. Information submitted for stability models shall be compatible with the Participating TO and CAISO standard models. If there is no compatible model, the Interconnection Customer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information. If the Interconnection Customer's data is materially different from what was originally provided to the Participating TO and the CAISO for the Interconnection Studies, then the Participating TO and the CAISO will conduct appropriate studies pursuant to the LGIP to determine the impact on the Participating TO’s Transmission System and affected portions of the CAISO Controlled Grid based on the actual data submitted pursuant to this Article 24.3. The Interconnection Customer shall not begin Trial Operation until such studies are completed and all other requirements of this LGIA are satisfied.

  • Reference Materials The Board agrees to continue to make available to employees the reference materials maintained by the district. Principals are encouraged to provide additional reference materials of high use in schools where feasible.

Time is Money Join Law Insider Premium to draft better contracts faster.