Recall Campaign Corrective Measures Sample Clauses

Recall Campaign Corrective Measures 
AutoNDA by SimpleDocs

Related to Recall Campaign Corrective Measures

  • Corrective Measures If the Participating Generator fails to meet or maintain the requirements set forth in this Agreement and/or the CAISO Tariff, the CAISO shall be permitted to take any of the measures, contained or referenced in the CAISO Tariff, which the CAISO deems to be necessary to correct the situation.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • Protective Measures We have implemented and will maintain appropriate technical and organisational measures in relation to the Services taking into account the state of the art, the costs of implementation, and the nature, scope, context and purposes of Processing, as well as the likelihood and severity of risk to the rights and freedoms of data subjects. This includes measures relating to the physical security of Our facilities used to deliver them, measures to control access rights to Our assets and relevant networks, and processes for testing these measures. In accordance with Our obligations under applicable law, We may undertake digital forensic investigations in relation to the use of the Services and Subscriptions. You are responsible for using, and ensuring that your Users use, the controls and advice provided by the Services correctly and consistently.

  • Loop Testing/Trouble Reporting 2.1.6.1 Telepak Networks will be responsible for testing and isolating troubles on the Loops. Telepak Networks must test and isolate trouble to the BellSouth portion of a designed/non-designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, Telepak Networks will be required to provide the results of the Telepak Networks test which indicate a problem on the BellSouth provided Loop. 2.1.6.2 Once Telepak Networks has isolated a trouble to the BellSouth provided Loop, and had issued a trouble report to BellSouth on the Loop, BellSouth will take the actions necessary to repair the Loop if a trouble actually exists. BellSouth will repair these Loops in the same time frames that BellSouth repairs similarly situated Loops to its End Users. 2.1.6.3 If Telepak Networks reports a trouble on a non-designed or designed Loop and no trouble actually exists, BellSouth will charge Telepak Networks for any dispatching and testing (both inside and outside the CO) required by BellSouth in order to confirm the Loop’s working status. 2.1.6.4 In the event BellSouth must dispatch to the end-user’s location more than once due to incorrect or incomplete information provided by Telepak Networks (e.g., incomplete address, incorrect contact name/number, etc.), BellSouth will xxxx Xxxxxxx Networks for each additional dispatch required to repair the circuit due to the incorrect/incomplete information provided. BellSouth will assess the applicable Trouble Determination rates from BellSouth’s FCC or state tariffs.

  • Safety Measures Awarded vendor shall take all reasonable precautions for the safety of employees on the worksite, and shall erect and properly maintain all necessary safeguards for protection of workers and the public. Awarded vendor shall post warning signs against all hazards created by the operation and work in progress. Proper precautions shall be taken pursuant to state law and standard practices to protect workers, general public and existing structures from injury or damage.

  • Remedial Measures Upon becoming aware of an alleged security breach, Contractor’s Contract Manager must set up a conference call with the Department’s and the Customer’s Contract Manager. The conference call invitation must contain a brief description of the nature of the event. When possible, a thirty (30)- minute notice will be given to allow Department personnel to be available for the call. If the designated time is not practical for the Customer, an alternate time for the call will be scheduled. Contractor must share all available information on the call. The Contractor must answer all questions based on the information known at that time and answer additional questions as additional information becomes known. The Contractor must provide the Department and Customer with final documentation of the incident including all actions that took place. If the Contractor becomes aware of a security breach or security incident outside of normal business hours, the Contractor must notify the Department’s and the Customer’s Contract Manager and in all events, within one business day.

  • Provisional Measures 1. The judicial authorities shall have the authority to order prompt and effective provisional measures: (a) to prevent an infringement of any intellectual property right from occurring, and in particular to prevent the entry into the channels of commerce in their jurisdiction of goods, including imported goods immediately after customs clearance; (b) to preserve relevant evidence in regard to the alleged infringement. 2. The judicial authorities shall have the authority to adopt provisional measures inaudita altera parte where appropriate, in particular where any delay is likely to cause irreparable harm to the right holder, or where there is a demonstrable risk of evidence being destroyed. 3. The judicial authorities shall have the authority to require the applicant to provide any reasonably available evidence in order to satisfy themselves with a sufficient degree of certainty that the applicant is the right holder and that the applicant’s right is being infringed or that such infringement is imminent, and to order the applicant to provide a security or equivalent assurance sufficient to protect the defendant and to prevent abuse. 4. Where provisional measures have been adopted inaudita altera parte, the parties affected shall be given notice, without delay after the execution of the measures at the latest. A review, including a right to be heard, shall take place upon request of the defendant with a view to deciding, within a reasonable period after the notification of the measures, whether these measures shall be modified, revoked or confirmed. 5. The applicant may be required to supply other information necessary for the identification of the goods concerned by the authority that will execute the provisional measures. 6. Without prejudice to paragraph 4, provisional measures taken on the basis of paragraphs 1 and 2 shall, upon request by the defendant, be revoked or otherwise cease to have effect, if proceedings leading to a decision on the merits of the case are not initiated within a reasonable period, to be determined by the judicial authority ordering the measures where a Member's law so permits or, in the absence of such a determination, not to exceed 20 working days or 31 calendar days, whichever is the longer. 7. Where the provisional measures are revoked or where they lapse due to any act or omission by the applicant, or where it is subsequently found that there has been no infringement or threat of infringement of an intellectual property right, the judicial authorities shall have the authority to order the applicant, upon request of the defendant, to provide the defendant appropriate compensation for any injury caused by these measures. 8. To the extent that any provisional measure can be ordered as a result of administrative procedures, such procedures shall conform to principles equivalent in substance to those set forth in this Section. SECTION 4: SPECIAL REQUIREMENTS RELATED TO BORDER MEASURES12

  • Usage Measurement Usage measurement for calls shall begin when answer supervision or equivalent Signaling System 7 (SS7) message is received from the terminating office and shall end at the time of call disconnect by the calling or called subscriber, whichever occurs first.

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!