Receptor Designation Sample Clauses

Receptor Designation. During the term of this Agreement, and in accordance with the terms and conditions of this Agreement, and for the sole purpose of establishing a Receptor Pool as provided hereunder, Arena Receptor(s) and Lilly Receptor(s), shall be designated as Collaboration Receptor(s) (Arena) or as Collaboration Receptor(s) (Lilly) as provided in this Article IV ("Designation", "Designated", or "Designation Process"). The Designation of
AutoNDA by SimpleDocs

Related to Receptor Designation

  • Board Composition and Board Designations The Company shall ensure that: (i) the qualifications of the persons serving as members of the Board of Directors and the overall composition of the Board comply with the Sxxxxxxx-Xxxxx Act, with the Exchange Act and with the listing rules of the Exchange or any other national securities exchange, as the case may be, in the event the Company seeks to have its Public Securities listed on another exchange or quoted on an automated quotation system, and (ii) if applicable, at least one member of the Audit Committee of the Board of Directors qualifies as an “audit committee financial expert,” as such term is defined under Regulation S-K and the listing rules of the Exchange.

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Timber Designations Timber designated for cutting shall be confined to Sale Area, except as provided in B2.131, B2.14, B2.15, B2.32, and B5. 1. Sale Area Map

  • Series Designation The Series Designation establishing a Series may: (i) specify a name or names under which the business and affairs of such Series may be conducted; (ii) designate, fix and determine the relative rights, powers, authority, privileges, preferences, duties, responsibilities, liabilities and obligations in respect of Interests of such Series and the Members associated therewith (to the extent such terms differ from those set forth in this Agreement) and (iii) designate or authorize the designation of specific Officers to be associated with such Series. A Series Designation (or any resolution of the Managing Member amending any Series Designation) shall be effective when a duly executed original of the same is included by the Managing Member among the permanent records of the Company, and shall be annexed to, and constitute part of, this Agreement (it being understood and agreed that, upon such effective date, the Series described in such Series Designation shall be deemed to have been established and the Interests of such Series shall be deemed to have been authorized in accordance with the provisions thereof). The Series Designation establishing a Series may set forth specific provisions governing the rights of such Series against a Member associated with such Series who fails to comply with the applicable provisions of this Agreement (including, for the avoidance of doubt, the applicable provisions of such Series Designation). In the event of a conflict between the terms and conditions of this Agreement and a Series Designation, the terms and conditions of the Series Designation shall prevail.

  • Project Administration Designation Pursuant to Paragraph (B) of Rule 164-1-21 of the Administrative Code, the Recipient shall designate its Chief Executive Officer, Chief Fiscal Officer and Project Manager in Appendix B of this Agreement. Changes in these designations must be made in writing.

  • Separation of Components The SOFTWARE PRODUCT is licensed as a single product. Its component parts may not be separated for use on more than one computer.

  • Unbundled Copper Loop – Non-Designed (UCL-ND 2.4.3.1 The UCL–ND is provisioned as a dedicated 2-wire metallic transmission facility from BellSouth’s Main Distribution Frame to a customer’s premises (including the NID). The UCL-ND will be a “dry copper” facility in that it will not have any intervening equipment such as load coils, repeaters, or digital access main lines (“DAMLs”), and may have up to 6,000 feet of bridged tap between the end user’s premises and the serving wire center. The UCL-ND typically will be 1300 Ohms resistance and in most cases will not exceed 18,000 feet in length, although the UCL-ND will not have a specific length limitation. For loops less than 18,000 feet and with less than 1300 Ohms resistance, the loop will provide a voice grade transmission channel suitable for loop start signaling and the transport of analog voice grade signals. The UCL-ND will not be designed and will not be provisioned with either a DLR or a test point. 2.4.3.2 The UCL-ND facilities may be mechanically assigned using BellSouth’s assignment systems. Therefore, the Loop Make Up process is not required to order and provision the UCL-ND. However, Lightyear can request Loop Make Up for which additional charges would apply. 2.4.3.3 At an additional charge, BellSouth also will make available Loop Testing so that Lightyear may request further testing on the UCL-ND. Rates for Loop Testing are as set forth in Exhibit B of this Attachment. 2.4.3.4 UCL-ND loops are not intended to support any particular service and may be utilized by Lightyear to provide a wide-range of telecommunications services so long as those services do not adversely affect BellSouth’s network. The UCL-ND will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the loop to the customer’s inside wire. 2.4.3.5 Order Coordination (OC) will be provided as a chargeable option and may be utilized when the UCL-ND provisioning is associated with the reuse of BellSouth facilities. Order Coordination -Time Specific (OC-TS) does not apply to this product. 2.4.3.6 Lightyear may use BellSouth’s Unbundled Loop Modification (ULM) offering to remove bridge tap and/or load coils from any loop within the BellSouth network. Therefore, some loops that would not qualify as UCL-ND could be transformed into loops that do qualify, using the ULM process.

  • Failure to Designate a Board Member In the absence of any designation from the Persons or groups with the right to designate a director as specified above, the director previously designated by them and then serving shall be reelected if still eligible to serve as provided herein.

  • Unbundled Copper Loop – Designed (UCL-D) 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters). 2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance. 2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Telepak Networks. 2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Telepak Networks to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire. 2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Telepak Networks or BellSouth provides ninety

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!