Reconstruction or Repair of Damaged Patio Homes Sample Clauses

Reconstruction or Repair of Damaged Patio Homes. If any Patio Home shall be damaged by casualty, the Owner of such Patio Home shall promptly reconstruct or repair it so as to restore such Patio Home nearly as possible to its condition prior to suffering the damage. All such reconstruction and repair work shall be done in accordance with plans and specifications therefore, approved by the Association. Encroachments upon or in favor of Patio Homes or Lots, which may be necessary for or created as a result of such reconstruction or repair, shall not constitute a claim or basis of a proceeding or action by the Owner on whose Patio Home or Lot such encroachment exists, provided that such reconstruction or repair is done substantially in accordance with the plans and specifications approved by the Association or as the building was originally constructed. A number of Patio Homes constructed on the Lots appear from the exterior to have a common party wall with the Patio Home or Patio Homes constructed on contiguous Lots. However, all Patio Homes have been constructed with separate exterior stud walls where there appears to be a party wall. The boundary line between these Lots runs along the air space between any such Patio Homes. This air space has been concealed on the exterior by covering it with facie boards which are common to both Patio Homes. The exterior of the two walls on either side of this small air space are unfinished so that if one of the Patio Homes is destroyed and not rebuilt, an unsightly condition will exist. Therefore, if a structure is destroyed in whole or in part, and the Owner thereof elects not to rebuild, such Owner shall be responsible for the cost of finishing the exterior of those walls on contiguous Patio Homes which are unfinished and which are exposed to view as the result of such destruction. The finish placed on these exterior walls shall be subject to the approval of the Architectural Review Board and shall be compatible with the finish of the other visible exterior walls of the structure. In addition, the Owner of the damaged or destroyed structure shall be responsible for the cost of immediately weatherproofing the exposed unfinished walls on contiguous Patio Homes, if necessary.
AutoNDA by SimpleDocs

Related to Reconstruction or Repair of Damaged Patio Homes

  • Repair of Damage If the Relevant Space is damaged by fire, storm, flood, earthquake or other insured casualty, Landlord and Tenant shall work cooperatively and diligently with one another to obtain estimates of the cost and time required to repair and restore such damage to the Building and the Relevant Space (which estimates Landlord shall be responsible for obtaining and sharing with Tenant) and to negotiate a settlement payment with the relevant insurance company as quickly as feasible following the date of the casualty event and in any event within ninety (90) days after the date of such casualty event (the “90-Day Casualty Assessment Period”). If it is determined that the damage to the Building and the Relevant Space can be substantially repaired and restored within one hundred eighty (180) days from the expiration of the 90-Day Casualty Assessment Period using standard working methods and procedures, Landlord shall use reasonable efforts to repair and restore the Relevant Space and the Building to its previous condition. Provided, however, if it is determined that the Building and the Relevant Space cannot be repaired and restored within such one hundred eighty (180) day period, then either party may, within ten (10) days after such determination is made and communicated to both Landlord and Tenant, terminate this Lease by giving notice to the other party; provided further, however, Tenant shall not be able to terminate this Lease if the damage was caused by Tenant’s willful misconduct. Notwithstanding the foregoing, Tenant shall reimburse Landlord for the cost of repairing and restoring the Building, the Building-Specific Common Areas, the Exterior Common Areas and/or the Land, or any part thereof, to the extent that any water damage is due to the malfunction, leaking or misuse of any Tenant personal property, equipment, or non- Building Standard Improvements, including, without limitation, refrigerators, fish tanks, icemakers, water fountains and water coolers, to the extent specified in Section 6.4 herein. Additionally, if it is determined that the Building and the Relevant Space will be repaired and restored as provided above, Tenant shall be entitled, by so notifying Landlord in writing during the 90-Day Casualty Assessment Period, to have Landlord’s repair and restoration obligations encompass only a scope of work that is consistent with the Building Shell Improvements originally completed by Landlord prior to the Commencement Date and, in such case, (i) Tenant shall be responsible for all additional work required to repair and restore the Building and the Relevant Space to the condition that existed immediately prior to the casualty event or to a modified condition and receive the relevant insurance proceeds related thereto which remain following the completion of Landlord’s repair and restoration obligations, subject to Landlord’s prior written approval of the plans and specifications for such modifications pursuant to Section 6.1(b) herein (and Tenant shall bear the risk of any shortfall in insurance proceeds to fully pay for such additional work if and to the extent such additional work exceeds the scope of work that would be required to restore the Improvements that existed in the Premises immediately prior to the casualty event), (ii) the foregoing one hundred eighty (180) day period for the completion of the repair and restoration project shall no longer be applicable and (iii) Tenant shall cause such additional work to be completed in an expeditious manner (so that rent hereunder will again be payable with respect to the Relevant Space) and otherwise in compliance with all relevant terms and provisions in this Lease relating to the installation of Improvements by Tenant.

  • Repair (a) Tenant, at its sole cost and expense, shall take good care of the Premises, including all building equipment and systems located therein and serving the Premises. Tenant shall make all repairs, interior or exterior, structural or otherwise, as and when needed, to preserve the Premises, the need for which repair arises out of (i) the performance or existence of any Alteration to the Premises made by Tenant, (ii) the installation or operation of Tenant's property or fixtures, and the movement of same in or about the Premises or the Building, (iii) the acts, failures to act or negligence of Tenant or Tenant's servants, employees, contractors, agents, visitors or licensees, or (iv) the use, of the Premises by Tenant or Tenant's servants, employees, contractors, agents, visitors or licensees. Landlord shall not be liable for and, except as provided in Paragraph 20, there shall be no abatement of Rent with respect to any injury to or interference with Tenant's business arising from any repairs, maintenance, alteration or interruption of services in or to any portion of the Office Park or Building, including the Premises, or to the fixtures, appurtenances and equipment therein. (b) All repairs and replacements made by or on behalf of Tenant shall be made and performed in a workmanlike manner (i) at Tenant's cost and expense and at such time and in such manner as Landlord may designate, (ii) by contractors approved by Landlord, (iii) such work shall be at least equal in quality, value, and utility to the original work or installation, and (iv) in accordance with the Rules and Regulations for the Building adopted by Landlord from time to time and in accordance with all applicable laws and regulations of governmental authorities having jurisdiction over the Premises. If Tenant shall fail after 10 days' notice by Landlord to proceed with due diligence to make repairs required to be made by Tenant, Landlord may make the repairs at the expense of Tenant and the expenses thereof incurred by Landlord shall be reimbursed immediately as Additional Rent after submission of a xxxx or statement there for.

  • Repair or Replacement Except where an appraisal has been made, the Insurer, instead of making payment, may, within a reasonable time, repair, rebuild or replace the property damaged or lost with other of like kind and quality if, within seven days after the receipt of the proof of loss, it gives written notice of its intention to do so.

  • Construction of the Improvements Once development of the Property has commenced, the construction of the Improvements shall be pursued with due diligence and continuity, in a good and workmanlike manner, and in accordance with sound building and engineering practices, all applicable governmental requirements, and the Development Plan. Borrower shall not permit cessation of work for a period in excess of thirty (30) days during any period of time during which development on the Property is scheduled to be performed without the prior written consent of Lender, which may be given or withheld in Lender’s sole discretion, except for delays due to strikes, riots, acts of God, war, unavailability of labor or materials, governmental laws, regulations or restrictions and Borrower shall promptly notify Lender of any such delays; provided, however, that in no event shall work cease for a period in excess of sixty (60) days regardless of the cause. Borrower shall cause all materials supplied for, or intended to be utilized in, the development of any part of the Property, but not affixed to or incorporated into the Property, to be stored on the Property or at such other location as may be approved by Lender in writing, with adequate safeguards, as required by Lender, to prevent loss, theft, damage, or commingling with other materials or projects.

  • Maintenance, Alteration and Repair (a) Resident is responsible for and agrees to take good care of the premises, fixtures and all common areas. Resident may not remove any of Owner’s property and will not perform any repairs, upgrades, painting, wallpapering, electric changes or other alterations of the premises without prior written consent from Owner. Resident will be responsible for damage from waste stoppages caused by foreign or improper objects or improper use in lines serving bathrooms, damage to fixtures, appliances, doors, windows, screens, damage from water faucets left on or from doors left open, and repairs or replacements to alarm devices necessitated by misuse or damage by Resident and/or guests. Extraordinary appliances or furnishings such as satellite dishes, hot tubs, pool tables, water beds or high utility-consuming devices may not be installed or placed on the premises or anywhere at the Property without Owner’s prior written consent, in its sole discretion. SAMPLE (b) In the case of a malfunction of any utilities or damage by fire, water or similar cause, or any water leak, suspected mold or microbial growth, electrical problem, broken glass, broken lock or any other condition that Resident reasonably believes poses a hazard to health and safety, Resident must promptly notify Owner in writing. Owner will act with reasonable time and diligence in making repairs and reconnections; Resident may not withhold or reduce payment of rent or other charges during such time. Maintenance and repair requested by Resident will generally be performed between 8am and 8pm, unless the work is considered an emergency, in which case work may take place at any time. Owner may temporarily disconnect equipment or utilities to avoid property damage and/or to perform repairs requiring such interruption, in Owner’s sole discretion. Owner will not be liable for any inconvenience, discomfort, disruption or interference with Resident use of the premises because of ongoing repairs, alterations or improvements to the Property or any apartment. (c) Following move-in, Resident is responsible for providing and changing all light bulbs and batteries (for smoke detectors and remote controls) in the assigned apartment. A written maintenance report requesting assistance in changing these items may be submitted for maintenance staff assistance, with extra charges payable by Resident as applicable per Owner’s published rates. From time to time, maintenance staff may enter the assigned apartment with or without notice to inspect and change furnace filters and to provide pest control.

  • MAINTENANCE, REPAIRS, OR ALTERATIONS The Tenant shall, at their own expense and at all times, maintain premises in a clean and sanitary manner, and shall surrender the same at termination hereof, in as good condition as received, normal wear and tear excepted. The Tenant may not make any alterations to the leased premises without the consent in writing of the Landlord. The Landlord shall be responsible for repairs to the interior and exterior of the building. If the Premises includes a washer, dryer, freezer, dehumidifier unit and/or air conditioning unit, the Landlord makes no warranty as to the repair or replacement of units if one or all shall fail to operate. The Landlord will place fresh batteries in all battery-operated smoke detectors when the Tenant moves into the premises. After the initial placement of the fresh batteries it is the responsibility of the Tenant to replace batteries when needed. A monthly "cursory" inspection may be required for all fire extinguishers to make sure they are fully charged.

  • Construction of the Project Highway (i) The Contractor shall construct the Project Highway as specified in Schedule- B and Schedule-C, and in conformity with the Specifications and Standards set forth in Schedule-D. The Contractor shall be responsible for the correct positioning of all parts of the Works, and shall rectify any error in the positions, levels, dimensions or alignment of the Works. The [650th (six hundred and fiftieth) day] from the Appointed Date shall be the scheduled completion date (the “Scheduled Completion Date”) and the Contractor agrees and undertakes that the construction shall be completed on or before the Scheduled Completion Date, including any extension thereof. (ii) The Contractor shall construct the Project Highway in accordance with the Project Completion Schedule set forth in Schedule-J. In the event that the Contractor fails to achieve any Project Milestone or the Scheduled Completion Date within a period of 30 (thirty) days from the date set forth in Schedule-J, unless such failure has occurred due to Force Majeure or for reasons solely attributable to the Authority, it shall pay Damages to the Authority of a sum calculated at the rate of 0.05% (zero point zero five percent) of the Contract Price for delay of each day reckoned from the date specified in Schedule –J and until such Project Milestone is achieved or the Project Highway is completed; provided that if the period for any or all Project Milestones or the Scheduled Completion Date is extended in accordance with the provisions of this Agreement, the dates set forth in Schedule-J shall be deemed to be modified accordingly and the provisions of this Agreement shall apply as if Schedule-J has been amended as above; provided further that in the event the Project Highway is completed within or before the Scheduled Completion Date including any Time Extension, applicable for that work or section, the Damages paid under this Clause 10.3 (ii) shall be refunded by the Authority to the Contractor, but without any interest thereon. The Parties agree that for determining achievement or delays in completion of the Project Milestones or the Project on the due date, the works affected due to delay in providing the site for which time extension has been granted beyond the Scheduled Completion Date will be excluded. For example on the due date to achieve the Project Milestone-I (i.e., Stage Payments of 10% (ten percent) of Contract Price on 180th (one hundred and eighty) day from the Appointed Date), if 5% (five percent) of the project length corresponding to the Project Milestone-I is not handed over or lately handed over resulting in the extension of completion of this 5% (five percent) length beyond Scheduled Completion Date, Stage Payment of 10% X 0.95 = 9.5% only is to be achieved by 180th (one hundred and eighty) day. For the avoidance of doubt, it is agreed that recovery of Damages under this Clause 10.3 (ii) shall be without prejudice to the rights of the Authority under this Agreement including the right of Termination thereof. The Parties further agree that Time Extension hereunder shall only be reckoned for and in respect of the affected Works as specified in Clause 10.5 (ii). (iii) The Authority shall notify the Contractor of its decision to impose Damages in pursuance with the provisions of this Clause 10.3. Provided that no deduction on account of Damages shall be effected by the Authority without notifying the Contractor of its decision to impose the Damages, and taking into consideration the representation, if any, made by the Contractor within 20 (twenty) days of such notice. The Parties expressly agree that the total amount of Damages under Clause 10.3 (ii) shall not exceed 10% (ten percent) of the Contract Price. If the damages exceed 10% (ten percent) of the Contract Price, the Contractor shall be deemed to be in default of this agreement having no cure and the Authority shall be entitled to terminate this Agreement by issuing a Termination Notice in accordance with the provisions of Clause 23.1 (ii). (iv) In the event that the Contractor fails to achieve the Project Completion within a period of 90 (ninety) days from the Schedule Completion Date set forth in Schedule-J, unless such failure has occurred due to Force Majeure or for reasons solely attributable to the Authority, the contractor shall be deemed to be ineligible for bidding any future projects of the Authority, both as the sole party or as one of the parties of Joint Venture/ Consortium during the period from Scheduled Completion Date to issuance of Completion Certificate. This restriction is applicable if the contract value of the delayed project is not less than Rs. 300 Crore.

  • Construction of the Tenant Improvements (a) Tenant shall construct and install the Tenant Improvements in a good and workmanlike manner, in compliance with all Laws and in accordance with this Exhibit B. Tenant’s proposed architect/engineer, general contractor, and fire protection, plumbing, HVAC and electrical subcontractors are subject to Landlord’s prior approval. Promptly following the selection and approval of the architect/engineer, Tenant shall forward to said architect/engineer (and copy Landlord on the transmittal) Landlord’s building standards heretofore delivered to Tenant, and Tenant shall cause said architect/engineer to comply with said building standards. Promptly following the selection and approval of the general contractor, Tenant shall forward to said general contractor (and copy Landlord on the transmittal) Landlord’s fire protection, plumbing, HVAC and electrical specifications and Landlord’s rules of conduct, all of which have been delivered to Tenant prior to the date of this Lease, and Tenant shall cause said general contractor to comply with said specifications and rules of conduct. At Landlord’s request, Tenant shall coordinate a meeting among Landlord (who will reasonably make its representative available for such meeting), Tenant and Tenant’s general contractor to discuss the Building systems and other matters related to the construction of the Tenant Improvements. (b) Promptly following the date hereof, Tenant shall prepare and submit to Landlord a set of permittable construction drawings (the “CDs”), based on the preliminary plans attached hereto as Exhibit B-2 and made a part hereof (the “Preliminary Plans”), covering all work to be performed by Tenant in constructing the Tenant Improvements. Tenant shall have no right to make any Tenant Improvements that would materially alter the exterior appearance of the Building or the Building systems without Landlord’s prior approval. Landlord shall have fifteen (15) days after receipt of the CDs in which to review the CDs and in which to give Tenant written notice of its approval of the CDs or its requested changes to the CDs in reasonably sufficient detail so as to allow Tenant to make the requested changes (provided that Landlord shall not be permitted to request a change that is inconsistent with the Preliminary Plans). If Landlord requests any changes to the CDs, Tenant shall make such changes and shall, within fifteen (15) days of its receipt of Landlord’s requested changes (if any), submit the revised portion of the CDs to Landlord. Landlord shall have five (5) business days after receipt of the revised CDs in which to review said revised CDs and in which to give to Tenant written notice of its approval of the revised CDs or its requested changes thereto. This process shall continue until such time, if at all, that Landlord approves the CDs in accordance with this Section 2. Tenant shall at all times in its preparation of the CDs, and of any revisions thereto, act reasonably and in good faith. Landlord shall at all times in its review of the CDs, and any revisions thereto, act reasonably and in good faith.

  • Maintenance Repairs Utility Installations Trade Fixtures and Alterations (a) Section 8.1(a) is amended in its entirety to read as follows: Subject to the provisions of Sections 8.2, 10, and 15, Tenant shall, at Tenant's sole cost and expense and at all times, keep the Building Complex and every part thereof in good order, condition and repair (whether or not the need for such repairs occurs as a result of Tenant's use, any prior use, the elements or the age of such portion of the Building Complex), including, without limiting the generality of the foregoing, plumbing, electrical lighting facilities, boilers, fired or unfired pressure vessels, fire hose connections, fixtures, interior walls, exterior walls, roof, ceilings, floors, windows, doors, plate glass, and skylights, parking areas and lighting, driveways, sidewalks, landscaping, irrigation systems, and subject to Section 8.1(b) below, heating, air conditioning and ventilating systems, but excluding any items which are the responsibility of Landlord pursuant to Section 8.2 below. Tenant, in keeping the Building Complex in good order, condition and repair, shall exercise and perform good maintenance practices, including, without limitation, providing janitorial services to the Building Complex substantially equivalent to those attached hereto as Exhibit I and, snow, ice and trash removal service. Tenant's obligations shall include restorations, replacements or renewals when necessary to keep the Building Complex and all improvements thereon or a part thereof in good order, condition and state of repair. (b) Section 8.1(b) is amended in its entirety to read as follows: Tenant shall procure and pay the cost of a contract for maintenance of the heating, air conditioning and ventilating systems for the Building Complex with a reputable contractor licensed in the State of Colorado and reasonably satisfactory to Landlord. (c) Section 8.1(c) is amended to replace, in both places where it is used, the word "Premises" with the words "Building Complex" and to add the words "including, without limitation, the Premises," before the words "after twenty". (d) Section 8.2 is amended in its entirety to read as follows:

  • Maintenance Repairs and Alterations 7.1 Lessee's Obligations. -------------------- (a) Subject to Lessor's obligations under Paragraphs 6.2(b), 6.3(a), 7.3, 9 and 40, Lessee shall keep in good order, condition and repair the non- structural elements of the Premises and every part thereof, (whether or not the need for such repairs occurs as a result of Lessee's use, any prior use, the elements or the age of such portion of the Premises) including, without limiting the generality of the foregoing, all exposed plumbing, heating and air conditioning, ventilating, electrical, lighting facilities and equipment within the Premises, fixtures, walls (interior and nonstructural elements of exterior), ceilings, floors, windows, doors, plate glass and skylights located within the Premises, and all driveways, parking lots and striping thereon, landscaping, exterior lighting, fences and signs located on the Premises and sidewalks and parkways adjacent to the Premises. If the cost of repairing an element of the Premises is covered by a warranty obtained by Lessor from a third party contractor, subcontractor, consultant or material supplier in connection with construction work performed on the Premises prior to the Effective Date, Lessor shall make available such warranty to Lessee and shall assign to Lessee Lessor's rights thereunder, provided that Lessee shall not take any action which shall invalidate any such warranty or derogate from Lessor's remedies or recourse thereunder. (b) Lessee shall maintain the Premises as provided in Paragraph 7. I (a) and in accordance with the requirements of all Laws and any covenants or restrictions as may from time to time be applicable to Lessee's specific manner of use of the Premises and the conduct and operation of Lessee's business. Lessee, in keeping the Premises in good order, condition and repair, shall exercise and perform good maintenance practices and any damage or deterioration shall not be deemed "ordinary wear and tear" if the same could have been prevented by good maintenance practice. Lessee's obligations shall include restorations, replacements or renewals when determined not to be due to ordinary wear and tear or when made necessary due to failure to perform proper maintenance. (c) If the term of this Lease, as the same may be extended or renewed, exceeds five (5) years, Lessor shall have the right to require Lessee to repaint the exterior of THE improvements. but not more often than once every five (5) years, as reasonably necessary. (d) Lessee's obligations under this Paragraph 7.1 shall not apply to replacement, repair or restoration of items which are Lessor's obligation to replace, repair or restore pursuant to the terms of Paragraph 6.3(a) (relating to Existing Defects) Paragraph 7.3(a) relating to structural repairs and certain replacements) Paragraph 9 (relating to destruction of the Premises) or Paragraph 14 (relating to condemnation of the Premises).

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!