Common use of Record Drawings Clause in Contracts

Record Drawings. During the progress of the work, the Contractor shall require the plumbing, air conditioning, heating, ventilating, elevator, and electrical subcontractors to record on their field sets of drawings the exact locations, as installed, of all conduit, pipe and duct lines whether concealed or exposed which were not installed exactly as shown on the contract drawings. The Contractor shall also record all drawing revisions that have been authorized by change order that effect wall or partition locations, door and window locations and other template changes. The exact routing of conduit runs shall be shown on these drawings. Each drawing shall be noted “As Built” and shall bear the date and name of the subcontractors that performed the work. Where the work was installed exactly as shown on the contract drawings the sheets shall not be distributed except as noted above. The Contractor shall review the completed As Built drawings and ascertain that all data furnished on the drawings are accurate and truly represent the work as actually installed. When manholes, boxes, underground conduits, plumbing, hot or chilled water lines, inverts, etc. are involved as part of the work, the Contractor shall furnish true elevations and locations, all properly referenced by using the original benchmark used for the institution or for this project. These As Built drawings shall be sent to the Architect-Engineer who will prepare final record drawings.

Appears in 6 contracts

Samples: Master Agreement Construction Management Services For, Master Agreement, Master Agreement

AutoNDA by SimpleDocs

Record Drawings. During the progress of the work, the Contractor Construction Manager shall require the site, plumbing, air conditioning, heating, ventilating, elevator, and electrical subcontractors to record on their field sets of drawings the exact locations, as installed, of all conduit, pipe and duct lines whether concealed or exposed which were not installed exactly as shown on the contract drawings. The Contractor Construction Manager shall also record all drawing revisions that have been authorized by change order that effect wall or partition locations, door and window locations and other template changes. The exact routing of piping, conduit runs shall be shown on these drawings. Upon completion of the work, this data shall be recorded to scale utilizing a computer aided design and drafting application (CADD). Two (2) sets of disk files will be furnished to the Construction Manager by the Architect-Engineer, but the cost shall be borne by the Construction Manager. Each drawing shall be noted "As Built" and shall bear the date and name of the subcontractors that performed the work. Where the work was installed exactly as shown on the contract drawings the sheets shall not be distributed disturbed except as noted above. The Contractor Construction Manager shall review the completed As As-Built drawings and ascertain that all data furnished on the drawings are accurate and truly represent the work as actually installed. When manholes, boxes, underground conduits, plumbing, hot or chilled water lines, inverts, etc. are involved as part of the work, the Contractor Construction Manager shall furnish true elevations and locations, all properly referenced by using the original benchmark bench mark used for the institution or for this project. These As Built drawings project The disks shall be sent submitted to the Architect-Engineer who will prepare when completed, together with two sets of blue line or black line prints for certification and forwarding to the Owner at the time of final record drawingscompletion.

Appears in 3 contracts

Samples: Agreement, Agreement Between Owner and Construction, cdn.boarddocs.com

Record Drawings. During the progress of the work, the Contractor Construction Manager shall require the site, plumbing, air conditioning, heating, ventilating, elevator, and electrical subcontractors to record on their field sets of drawings the exact locations, as installed, of all conduit, pipe and duct lines whether concealed or exposed which were not installed exactly as shown on the contract drawings. The Contractor Construction Manager shall also record all drawing revisions that have been authorized by change order that effect wall or partition locations, door and window locations and other template changes. The exact routing of piping, conduit runs shall be shown on these drawings. Upon completion of the work, this data shall be recorded to scale utilizing a computer aided design and drafting application (CADD). Two (2) thumb drive files will be furnished to the Construction Manager by the Architect-Engineer, but the cost shall be borne by the Construction Manager. Each drawing shall be noted "As Built" and shall bear the date and name of the subcontractors that performed the work. Where the work was installed exactly as shown on the contract drawings the sheets shall not be distributed disturbed except as noted above. The Contractor Construction Manager shall review the completed As As-Built drawings and ascertain that all data furnished on the drawings are accurate and truly represent the work as actually installed. When manholes, boxes, underground conduits, plumbing, hot or chilled water lines, inverts, etc. are involved as part of the work, the Contractor Construction Manager shall furnish true elevations and locations, all properly referenced by using the original benchmark bench mark used for the institution or for this project. These As Built drawings project The disks shall be sent submitted to the Architect-Engineer who will prepare when completed, together with two sets of blue line or black line prints for certification and forwarding to the Owner at the time of final record drawingscompletion.

Appears in 2 contracts

Samples: Agreement Between Owner and Construction, Agreement Between Owner and Construction

Record Drawings. During the progress of the work, the Contractor Construction Manager shall require the plumbing, air conditioning, heating, ventilating, elevator, and electrical subcontractors to record on their field sets of drawings the exact locations, as installed, of all conduit, pipe and duct lines whether concealed or exposed which were not installed exactly as shown on the contract drawings. The Contractor Construction Manager shall also record all drawing revisions that have been authorized by change order that effect wall or partition locations, door and window locations and other template changes. The exact routing of conduit runs shall be shown on these drawings. Each drawing shall be noted "As Built" and shall bear the date and name of the subcontractors that performed the work. Where the work was installed exactly as shown on the contract drawings the sheets shall not be distributed disturbed except as noted above. The Contractor Construction Manager shall review the completed As As-Built drawings and ascertain that all data furnished on the drawings are accurate and truly represent the work as actually installed. When manholes, boxes, underground conduits, plumbing, hot or chilled water lines, inverts, etc. are involved as part of the work, the Contractor Construction Manager shall furnish true elevations and locations, all properly referenced by using the original benchmark bench xxxx used for the institution or for this project. These As Built drawings shall be sent to the Architect-Engineer who will prepare final record drawings.

Appears in 2 contracts

Samples: Real Estate Development and Management, Real Estate Development and Management

Record Drawings. During the progress of the workWork, the Contractor Construction Manager shall require the plumbing, air conditioning, heating, ventilating, elevator, and electrical subcontractors to record on their field sets of drawings the exact locations, as installed, of all conduit, pipe and duct lines whether concealed or exposed which were not installed exactly as shown on the contract drawings. The Contractor Construction Manager shall also record all drawing revisions that have been authorized by change order that effect wall or partition locations, door and window locations and other template changes. The exact routing of conduit runs shall be shown on these drawings. Each drawing shall be noted "As Built" and shall bear the date and name of the subcontractors that performed the workWork. Where the work Work was installed exactly as shown on the contract drawings the sheets shall not be distributed disturbed except as noted above. The Contractor Construction Manager shall review the completed As As-Built drawings and ascertain that all data furnished on the drawings are accurate and truly represent the work Work as actually installed. When manholes, boxes, underground conduits, plumbing, hot or chilled water lines, inverts, etc. are involved as part of the work, the Contractor Construction Manager shall furnish true elevations and locations, all properly referenced by using the original benchmark bench xxxx used for the institution or for this project. These As Built drawings shall be sent to the Architect-Engineer who will prepare final record drawings.Project

Appears in 2 contracts

Samples: Building Construction Agreement, Building Construction Agreement

Record Drawings. During the progress of the work, the Contractor Construction Manager shall require the plumbing, air conditioning, heating, ventilating, elevator, and electrical subcontractors to record on their field sets of drawings the exact locations, as installed, of all conduit, pipe and duct lines whether concealed or exposed which were not installed exactly as shown on the contract drawings. The Contractor Construction Manager shall also record all drawing revisions that have been authorized by change order that effect wall or partition locations, door and window locations and other template changes. The exact routing of conduit runs shall be shown on these drawings. Each drawing shall be noted "As Built" and shall bear the date and name of the subcontractors that performed the work. Where the work was installed exactly as shown on the contract drawings the sheets shall not be distributed disturbed except as noted above. The Contractor Construction Manager shall review the completed As As-Built drawings and ascertain that all data furnished on the drawings are accurate and truly represent the work as actually installed. When manholes, boxes, underground conduits, plumbing, hot or chilled water lines, inverts, etc. are involved as part of the work, the Contractor Construction Manager shall furnish true elevations and locations, all properly referenced by using the original benchmark bench mark used for the institution or for this project. These As Built drawings shall be sent to the Architect-Engineer who will prepare final record drawings.

Appears in 1 contract

Samples: Real Estate Development and Management

Record Drawings. During the progress of the work, the Contractor shall require the plumbing, utility, sitework, air conditioning, heating, ventilating, elevator, and electrical subcontractors to record on their field sets of drawings the exact locations, as installed, of all conduit, pipe and duct lines whether concealed or exposed which were not installed exactly as shown on the contract drawings. The Contractor shall also record all drawing revisions that have been authorized by change order that effect wall or partition locations, door and window locations and other template changes. The exact routing of conduit runs shall be shown on these drawings. Each drawing shall be noted "As Built" and shall bear the date and name of the subcontractors that performed the work. Where the work was installed exactly as shown on the contract drawings the sheets shall not be distributed disturbed except as noted above. The Contractor shall review the completed As As-Built drawings and ascertain that all data furnished on the drawings are accurate and truly represent the work as actually installed. When manholes, boxes, underground conduits, plumbing, hot or chilled water lines, inverts, etc. are involved as part of the work, the Contractor shall furnish true elevations and locations, all properly referenced by using the original benchmark bench mark used for the institution or for this project. These As Built drawings shall be sent to the Architect-Engineer who will prepare final record drawings.

Appears in 1 contract

Samples: Construction Project Agreement

AutoNDA by SimpleDocs

Record Drawings. During the progress of the work, the Contractor shall require the plumbing, utility, sitework, air conditioning, heating, ventilating, elevator, and electrical subcontractors to record on their field sets of drawings the exact locations, as installed, of all conduit, pipe and duct lines whether concealed or exposed which were not installed exactly as shown on the contract drawings. The Contractor shall also record all drawing revisions that have been authorized by change order that effect wall or partition locations, door and window locations and other template changes. The exact routing of conduit runs shall be shown on these drawings. Each drawing shall be noted "As Built" and shall bear the date and name of the subcontractors that performed the work. Where the work was installed exactly as shown on the contract drawings the sheets shall not be distributed disturbed except as noted above. The Contractor shall review the completed As As-Built drawings and ascertain that all data furnished on the drawings are accurate and truly represent the work as actually installed. When manholes, boxes, underground conduits, plumbing, hot or chilled water lines, inverts, etc. are involved as part of the work, the Contractor shall furnish true elevations and locations, all properly referenced by using the original benchmark bench xxxx used for the institution or for this project. These As Built drawings shall be sent to the Architect-Engineer who will prepare final record drawings.

Appears in 1 contract

Samples: Construction Project Agreement

Record Drawings. During the progress of the work, the Contractor Construction Manager shall require the plumbing, air conditioning, heating, ventilating, elevator, and electrical subcontractors to record on their field sets of drawings the exact locations, as installed, of all conduit, pipe and duct lines whether concealed or exposed which were not installed exactly as shown on the contract drawings. The Contractor Construction Manager shall also record all drawing revisions that have been authorized by change order that effect wall or partition locations, door and window locations and other template changes. The exact routing of conduit runs shall be shown on these drawings. Each drawing shall be noted “As Built” "Record Drawings" and shall bear the date and name of the subcontractors that performed the work. Where the work was installed exactly as shown on the contract drawings drawings, the sheets shall not be distributed disturbed except as noted above. The Contractor Construction Manager shall review the completed As Built record drawings and ascertain that all data furnished on the drawings are accurate and truly represent the work as actually installed. When manholes, boxes, underground conduits, plumbing, hot or chilled water lines, inverts, etc. are involved as part of the work, the Contractor Construction Manager shall furnish true elevations and locations, all properly referenced by using the original benchmark bench xxxx used for the institution or for this project. These As Built drawings shall be sent to the Architect-Engineer who will prepare final record drawings.

Appears in 1 contract

Samples: Agreement

Record Drawings. During the progress of the work, the Contractor Construction Manager shall require the plumbing, air conditioning, heating, ventilating, elevator, and electrical subcontractors to record on their field sets of drawings the exact locations, as installed, of all conduit, pipe and duct lines whether concealed or exposed which were not installed exactly as shown on the contract drawings. The Contractor Construction Manager shall also record all drawing revisions that have been authorized by change order that effect wall or partition locations, door and window locations and other template changes. The exact routing of conduit runs shall be shown on these drawings. Upon completion of the work, this data shall be recorded to scale utilizing a computer aided design and drafting application (CADD). Two (2) sets of disk files will be furnished to the Construction Manager by the Architect-Engineer, but the cost shall be borne by the Construction Manager. Each drawing shall be noted "As Built" and shall bear the date and name of the subcontractors that performed the work. Where the work was installed exactly as shown on the contract drawings the sheets shall not be distributed disturbed except as noted above. The Contractor Construction Manager shall review the completed As As-Built drawings and ascertain that all data furnished on the drawings are accurate and truly represent the work as actually installed. When manholes, boxes, underground conduits, plumbing, hot or chilled water lines, inverts, etc. are involved as part of the work, the Contractor Construction Manager shall furnish true elevations and locations, all properly referenced by using the original benchmark bench mark used for the institution or for this project. These As Built drawings project The disks shall be sent submitted to the Architect-Engineer who will prepare when completed, together with two sets of blue line or black line prints for certification and forwarding to the Owner at the time of final record drawingscompletion.

Appears in 1 contract

Samples: Agreement Between Owner and Construction

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!