Refilling. After the sewer or other work has been laid and proved to be water tight, the trench or other excavations shall be refilled. Utmost care shall be taken in doing this, so that no damage shall be caused to the sewer and other permanent work. The filling in the haunches and upto 75 cm above the crown of the sewer shall consist of the finest selected materials place carefully in 15 cm. Layers and flooded and consolidated. After this has laid the trench and other excavation shall be refilled carefully in 15 cm layers with materials taken from the excavation, each layer being watered to assist in the consolidation unless the Independent Engineer shall otherwise direct.

Appears in 3 contracts

Samples: Concession Agreement, Concession Agreement, Concession Agreement

AutoNDA by SimpleDocs

Refilling. After the sewer pipes or other work has been laid and proved to be water tightlight, the trench or other excavations shall be refilled. Utmost care shall be taken in doing this, so that no damage shall be caused to the sewer site and other permanent work. The filling in the haunches hunches and upto 75 cm above the crown of the sewer shall consist of the finest selected materials place placed carefully in 15 cm. Layers cm layers and flooded and consolidated. After this has laid been laid, the trench and other excavation shall be refilled carefully in 15 cm layers with materials taken from the excavation, each layer being watered to assist in the consolidation unless the Independent Engineer shall otherwise direct.

Appears in 3 contracts

Samples: Concession Agreement, Concession Agreement, Concession Agreement

AutoNDA by SimpleDocs

Refilling. After Only after the sewer or sewers and other related work has been laid laid, installed and proved proven after testing to be water tight, the trench or and other excavations shall be refilled. Utmost care shall be taken in doing this, so that no damage shall be caused to the sewer and other permanent workworks. The filling in the haunches and upto 75 cm trenches up to 75cms above the crown of the sewer and other lines shall consist consists of the finest selected sand and related materials place placed carefully in 15 cm. Layers 15cms layers and flooded and consolidatedto consolidation. After this layer has been laid the trench and other excavation shall be refilled carefully in 15 cm 15cms layers with materials taken from the excavation, each layer being watered compacted to assist in the consolidation unless the Independent Engineer shall otherwise direct.

Appears in 1 contract

Samples: Contract Agreement