Release of the Facilities Sample Clauses

Release of the Facilities. The Facilities shall be utilised in accordance with the terms and conditions contain in the Letter of Offer.
AutoNDA by SimpleDocs

Related to Release of the Facilities

  • The Facilities Subject to the terms of this Agreement, the Lenders make available to the Borrower: (a) a sterling term loan facility in an aggregate amount equal to the Total Facility A Commitments; (b) a sterling term loan facility in an aggregate amount equal to the Total Facility B Commitments; and (c) a sterling term loan facility in an aggregate amount equal to the Total Facility C Commitments.

  • Unbundled Loop Modifications (Line Conditioning 2.5.1 Line Conditioning is defined as routine network modification that BellSouth regularly undertakes to provide xDSL services to its own customers. This may include the removal of any device, from a copper Loop or copper Subloop that may diminish the capability of the Loop or Subloop to deliver high-speed switched wireline telecommunications capability, including xDSL service. Such devices include, load coils, excessive bridged taps, low pass filters, and range extenders. Excessive bridged taps are bridged taps that serves no network design purpose and that are beyond the limits set according to industry standards and/or the BellSouth’s TR 73600 Unbundled Local Loop Technical Specification. 2.5.2 BellSouth will remove load coils only on copper Loops and Subloops that are less than eighteen thousand (18,000) feet in length. 2.5.3 For any copper loop being ordered by NewPhone which has over six thousand (6,000) feet of combined bridged tap will be modified, upon request from NewPhone, so that the loop will have a maximum of six thousand (6,000) feet of bridged tap. This modification will be performed at no additional charge to NewPhone. Loop conditioning orders that require the removal of bridged tap that serves no network design purpose on a copper Loop that will result in a combined total of bridged tap between two thousand five hundred (2,500) and six thousand (6,000) feet will be performed at the rates set forth in Exhibit A. 2.5.4 NewPhone may request removal of any unnecessary and non-excessive bridged tap (bridged tap between zero (0) and two thousand five hundred (2,500) feet which serves no network design purpose), at rates pursuant to BellSouth’s SC Process as mutually agreed to by the Parties. 2.5.5 Rates for ULM are as set forth in Exhibit A. 2.5.6 BellSouth will not modify a Loop in such a way that it no longer meets the technical parameters of the original Loop type (e.g., voice grade, ADSL, etc.) being ordered. 2.5.7 If NewPhone requests ULM on a reserved facility for a new Loop order, BellSouth may perform a pair change and provision a different Loop facility in lieu of the reserved facility with ULM if feasible. The Loop provisioned will meet or exceed specifications of the requested Loop facility as modified. NewPhone will not be charged for ULM if a different Loop is provisioned. For Loops that require a DLR or its equivalent, BellSouth will provide LMU detail of the Loop provisioned. 2.5.8 NewPhone shall request Loop make up information pursuant to this Attachment prior to submitting a service inquiry and/or a LSR for the Loop type that NewPhone desires BellSouth to condition. 2.5.9 When requesting ULM for a Loop that BellSouth has previously provisioned for NewPhone, NewPhone will submit a SI to BellSouth. If a spare Loop facility that meets the Loop modification specifications requested by NewPhone is available at the location for which the ULM was requested, NewPhone will have the option to change the Loop facility to the qualifying spare facility rather than to provide ULM. In the event that BellSouth changes the Loop facility in lieu of providing ULM, NewPhone will not be charged for ULM but will only be charged the service order charges for submitting an order.

  • Unsafe Working Conditions Employees shall be recognized by the Employer to have the competence to determine what constitutes unsafe working conditions within their discipline. No employee shall be disciplined for refusal to work in a situation which is deemed unsafe beyond the reasonable requirements of the employee's job.

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • GENERAL WORKING CONDITIONS Section 18-1. Employment begins and ends at each project site. Section 18-2. The selection of craft foremen and/or general foremen and the number of foremen required shall be entirely the responsibility of the Employer, it being understood that in the selection of such foremen and/or general foremen the Employer will give primary consideration to the qualified individuals available in the local area. After giving such consideration, the Employer may select such individuals from other areas. All foremen shall take orders from the designated Employer representatives. Craft foremen shall be designated working foremen at the request of the Employer. Section 18-3. There shall be no limit on production by employees nor restrictions on the full use of tools or equipment. Employees using tools shall perform any of the work of the trade and shall work under the direction of the craft foremen. There shall be no restrictions on efficient use of manpower other than as may be required by safety regulations. Section 18-4. Employees shall be at their place of work at the starting time and shall remain at their place of work performing their assigned functions under the supervision of the Employer until quitting time. The parties reaffirm their policy of a fair day’s work for a fair day’s wage. Section 18-5. All equipment assigned to a project shall be under the control of the Employer. The Employer shall have the right to determine how many pieces of equipment an individual employee shall operate. In an emergency, foremen shall operate any equipment assigned by the Employer, and there shall be no restriction on foremen in the use of the tools of his or her craft in such emergency. The foremen shall be from the craft normally operating the equipment. In accordance with currently recognized craft jurisdiction, the Employer shall determine the assignment of employees to start, stop, and maintain small portable construction equipment. Such work may be assigned to craft employees within a reasonable distance of their primary duties or an employee may be assigned full time to start, stop and maintain the Employer’s small, portable equipment on the job site. There shall be no over xxxxxxx of this type of equipment. The number of employees assigned to rigging and scaffolding operations shall be at the sole discretion of the Employer. The ratio of journeyperson to welders shall be determined solely by the Employer. Section 18-6. The Employer may utilize the most efficient methods or techniques of construction, tools or other labor saving devices to accomplish the work. Practices not a part of the terms and conditions of this Agreement, stand by crews and feather bedding practices will not be recognized. Section 18-7. It is recognized that specialized or unusual equipment may be installed and/ or serviced by individuals who have special training, skill, or qualifications and are not covered by this Agreement. Testing, inspection, or service performed on plant equipment under warranty may be performed by the vendor’s personnel. Section 18-8. Neither the Union nor its local unions shall coerce or in any way interfere with the Owner’s personnel, operation or facilities at the plant site. The Owner’s right to contract directly with other companies for work at the plant site shall not be limited, and the Union shall cooperate and not interfere with the Employer’s operations. Section 18-9. It is agreed that overtime is undesirable and not in the best interest of the industry or the employees; therefore, except in unusual circumstances, overtime will not be worked. Where unusual circumstances do exist, however, the Employer will have the right to assign specific employees and/or crews to perform such overtime work as is necessary to accomplish the job. Section 18-10. There will be no rest periods, organized coffee breaks or other non-working time established during working hours. Section 18-11. Individual seniority shall not be recognized or applied to employees working on projects under this Agreement. Section 18-12. The Employer shall establish such reasonable project rules as the Employer deems appropriate. These rules will be reviewed at the pre-job conference and posted at the project site by the Employer, and may be amended thereafter as necessary.

  • WORKING CONDITIONS 9.01 Lunch periods shall be at mid-shift. 9.02 The Employer shall allow each employee two (2) breaks of ten (10) minutes each, but not more in a work shift. Time of breaks shall be mutually agreed upon. 9.03 Essential protective clothing including welder’s gloves, protective vests or leather jackets, noise abatement devices, and rainwear shall be supplied at no charge to the employee. In the event that an employee does not return the foregoing items supplied to him by the Employer, the Employer shall charge the cost of same to the employee and deduct this cost from any money owing to the employee. 9.04 Chemical or flush toilets shall be provided from the commencement of work on all jobs. Where the sewer or chemical toilets are not available, sanitary toilet facilities shall be provided as called for in local sanitary regulations. Toilet houses shall be painted, at least on the inside, and cleaned out daily. Toilet paper will be provided. 9.05 Where there is no running tap water available, drinking water in approved sanitary containers shall be provided. Paper cups will be supplied. Salt tablets shall be supplied during the summer months. 9.06 If requested by the Union or employee, the Employer will provide within three (3) calendar days, a termination slip which shall state the reason for the employee’s termination and whether or not he is eligible for rehire. 9.07 Adequate time will be allowed prior to quitting time for picking up tools. 9.08 A lock-up shall be provided for employees for drying clothes, and dressing room, as well as lunch room. The lock-up shall have tables, and benches with provision for drying clothes. Such lock-up shall have windows and venting with adequate lighting and provision for continuous heat twenty-four (24) hours a day. The Employer shall be responsible for having the lock-up cleaned out daily and kept cleared of building material and other construction paraphernalia. Additional shelters shall be provided for employees to eat their lunch as may be required. 9.09 In case of fire or burglary on property or premises provided by the Employer, the Employer shall protect the value of an employee’s work clothes up to a total of three hundred and fifty dollars ($350.00). The Employer shall also provide fire and burglary insurance for the employees required tools to a total value of the tools, tool for tool, make for make, provided an inventory of tools and clothing is filed with the Employer. The Employer shall supply the required forms and obtain the inventory from each employee. The employee shall receive a signed copy of the inventory from the Employer. Coverage will commence at the date of the filing of the inventory with the Employer. Where an employee fails to file an inventory his rights to submit a claim shall be waived. (a) All mechanics, welders, servicemen, tire servicemen, drill doctors, steel sharpeners, bodymen painters, and mechanics and welder apprentices who request coveralls shall have these supplied and cleaned by the Employer. There shall be one change a week available in the employee’s proper size. Employees are expected to take reasonable care of coveralls supplied. In the event that an employee does not return the coveralls supplied to him by the Employer, the Employer shall charge the cost of same to the employee and deduct this cost from any monies owing to the employee. When requested, coveralls shall be supplied on a temporary basis to employees who assist on work as described above, or where the Employer and the Union mutually agree that coveralls are required. (b) Employees entitled to receive coveralls as provided herein may obtain an additional change of coveralls in any one week providing the condition of the coveralls requires a change. The shop xxxxxxx shall use discretion in authorizing the additional change. (c) All shops shall provide adequate clean-up facilities. 9.11 The Employer shall pay the cost of obtaining operators’ licences other than those required under the Motor Vehicles Act for employees covered by this Agreement. 9.12 No employee will be permitted to use his own motor vehicle in a manner which is unfair to other members or against the best interest of the Union. 9.13 Each employee being terminated will be given one (1) hour’s notice of termination by the Employer or one (1) hour’s pay allowed in lieu thereof. Heavy duty mechanics and apprentice mechanics may utilize this hour to gather together their tools and put them in shape for their next job. 9.14 When a mechanic leaves the employ of the Employer, the Employer shall be required to pay cost of shipping mechanic’s tools. Tools shall be shipped within forty-eight (48) hours of his leaving his employment, subject to the same conditions as govern transportation. When an Operating Engineer elects to transport his own tools to and from the jobsite, the employee shall be paid the rate of two dollars and seventy-five cents ($2.75) per one hundred (100) pounds per one hundred (100) miles. (e.g. $2.75 x 528 pounds x 273 miles = $39.64). Where the Employer fails to comply with the above, the employee shall be deemed to be still on the payroll of the Employer and shall receive his usual wages and all other conditions of this Agreement until there is compliance with these provisions. 9.15 Where an employee is involved in an accident while on the job and as a result is unable to perform his work, he shall receive a full day’s pay for the day of the accident.

  • Safe Working Conditions The Employer undertakes to maintain office furniture, equipment, etc., in a practical and safe condition in order to avoid injury to employees or damage to their attire. Employees, for their part and in their own interest, are expected to advise the Employer of any such potentially injurious equipment.

  • Environmental Conditions A Phase I environmental site assessment (or update of a previous Phase I and or Phase II environmental site assessment) and, with respect to certain Mortgage Loans, a Phase II environmental site assessment (collectively, an “ESA”) meeting ASTM requirements conducted by a reputable environmental consultant in connection with such Mortgage Loan within 12 months prior to its origination date (or an update of a previous ESA was prepared), and such ESA (i) did not identify the existence of recognized environmental conditions (as such term is defined in ASTM E1527-13 or its successor, hereinafter “Environmental Condition”) at the related Mortgaged Property or the need for further investigation, or (ii) if the existence of an Environmental Condition or need for further investigation was indicated in any such ESA, then at least one of the following statements is true: (A) an amount reasonably estimated by a reputable environmental consultant to be sufficient to cover the estimated cost to cure any material noncompliance with applicable Environmental Laws or the Environmental Condition has been escrowed by the related Mortgagor and is held or controlled by the related Mortgagee; (B) if the only Environmental Condition relates to the presence of asbestos-containing materials, radon in indoor air, lead based paint or lead in drinking water, the only recommended action in the ESA is the institution of such a plan, an operations or maintenance plan has been required to be instituted by the related Mortgagor that can reasonably be expected to mitigate the identified risk; (C) the Environmental Condition identified in the related environmental report was remediated or abated in all material respects prior to the date hereof, and, if and as appropriate, a no further action or closure letter was obtained from the applicable governmental regulatory authority (or the environmental issue affecting the related Mortgaged Property was otherwise listed by such governmental authority as “closed” or a reputable environmental consultant has concluded that no further action is required); (D) an environmental policy or a lender’s pollution legal liability insurance policy that covers liability for the identified circumstance or condition was obtained from an insurer rated no less than “A-” (or the equivalent) by Xxxxx’x Investors Service, Inc., S&P Global Ratings, acting through Standard & Poor’s Financial Services LLC, Fitch Ratings, Inc. and/or A.M. Best Company; (E) a party not related to the Mortgagor was identified as the responsible party for such condition or circumstance and such responsible party has financial resources reasonably estimated to be adequate to address the situation; or (F) a party related to the Mortgagor having financial resources reasonably estimated to be adequate to address the situation is required to take action. To the Mortgage Loan Seller’s knowledge, except as set forth in the ESA, there is no Environmental Condition (as such term is defined in ASTM E1527-13 or its successor) at the related Mortgaged Property.

  • HAZARDOUS SUBSTANCE CONDITIONS If a Hazardous Substance Condition occurs, unless Lessee is legally responsible therefor (in which case Lessee shall make the investigation and remediation thereof required by Applicable Requirements and this Lease shall continue in full force and effect, but subject to Lessor's rights under Paragraph 6.2(c) and Paragraph 13), Lessor may at Lessor's option either (i) investigate and remediate such Hazardous Substance Condition, if required, as soon as reasonably possible at Lessor's expense, in which event this Lease shall continue in full force and effect, or (ii) if the estimated cost to investigate and remediate such condition exceeds twelve (12) times the then monthly Base Rent or $100,000 whichever is greater, give written notice to Lessee within thirty (30) days after receipt by Lessor of knowledge of the occurrence of such Hazardous Substance Condition of Lessor's desire to terminate this Lease as of the date sixty (60) days following the date of such notice. In the event Lessor elects to give such notice of Lessor's intention to terminate this Lease, Lessee shall have the right within ten (10) days after the receipt of such notice to give written notice to Lessor of Lessee's commitment to pay for the excess costs of (a) investigation and remediation of such Hazardous Substance Condition to the extent required by Applicable Requirements, over (b) an amount equal to twelve (12) times the then monthly Base Rent or $100,000, whichever is greater. Lessee shall provide Lessor with the funds required of Lessee or satisfactory assurance thereof within thirty (30) days following said commitment by Lessee. In such event this Lease shall continue in full force and effect, and Lessor shall proceed to make such investigation and remediation as soon as reasonably possible after the required funds are available. If Lessee does not give such notice and provide the required funds or assurance thereof within the time period specified above, this Lease shall terminate as of the date specified in Lessor's notice of termination.

  • Existing Conditions Tenant accepts the Property in its condition as of the execution of the Lease, subject to all recorded matters, laws, ordinances, and governmental regulations and orders. Except as provided herein, Tenant acknowledges that neither Landlord nor any agent of Landlord has made any representation as to the condition of the Property or the suitability of the Property for Tenant's intended use. Tenant represents and warrants that Tenant has made its own inspection of and inquiry regarding the condition of the Property and is not relying on any representations of Landlord or any Broker with respect thereto. If Landlord or Landlord's Broker has provided a Property Information Sheet or other Disclosure Statement regarding the Property, a copy is attached as an exhibit to the Lease.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!