Replace isolator No. The unit of measurement shall be the number of isolators installed. The tendered rate shall include full compensation for the supply and installation of the specified type of isolator or control unit. The tendered sum shall further include for the provision of 4 wire, 3 phase connections to the fixed appliance. Isolator face plate shall be fitted with an engraved Traffolite label as per Nosa-standard, cost of, which is included in the rate. Item Unit
AutoNDA by SimpleDocs

Related to Replace isolator No

  • Cutting, Patching, and Fitting The Contractor shall do all cutting, patching, and fitting of the Work that may be required to make its several parts come together properly and fit.

  • Cutting and Patching The Contractor shall be responsible for cutting, fitting or patching required to complete the Work or to make its parts fit together properly.

  • Erosion and Sediment Control The Contractor shall install and maintain erosion and sediment control devices to prevent adjacent streets, storm drains and property from accumulations of soil, sediment, or dust which result from his work. Devices installed to control sediment and prevent erosion shall comply with the requirements of the Georgia Tech Project Superintendent. The Contractor is responsible for monitoring downstream conditions throughout the construction period and clearing any debris, sediment, and dust caused by the progress of the Work. The Contractor shall inspect, maintain, and clear erosion and sediment control devices at least weekly unless otherwise directed by the Georgia Institute of Technology Construction Manager. At the conclusion of the Work, the Contractor shall remove all installed devices and restoring the site to the satisfaction of the Georgia Tech Construction Manager.

  • Fill, Backfill and Landscaping No soil found on Site, or transported to the Site from remote locations, which contains debris or waste or Hazardous Materials shall be used for fill, backfill or landscaping topsoil.

  • CUTTING AND PATCHING OF WORK 4.14.1 The Contractor shall be responsible for all cutting, fitting or patching that may be required to complete the Work or to make its several parts fit together properly.

  • Provisioning Line Splitting and Splitter Space 3.8.1 The Data LEC, Voice CLEC or BellSouth may provide the splitter. When EZ Phone or its authorized agent owns the splitter, Line Splitting requires the following: a non-designed analog Loop from the serving wire center to the NID at the End User’s location; a collocation cross connection connecting the Loop to the collocation space; a second collocation cross connection from the collocation space connected to a voice port; the high frequency spectrum line activation, and a splitter. The Loop and port cannot be a Loop and port combination (i.e. UNE-P), but must be individual stand-alone Network Elements. When BellSouth owns the splitter, Line Splitting requires the following: a non designed analog Loop from the serving wire center to the NID at the End User’s location with CFA and splitter port assignments, and a collocation cross connection from the collocation space connected to a voice port.

  • Utility Infrastructure During the term of this Agreement, Company will have the right to receive water, sanitary sewer, electric, storm drainage, telecommunication and data services at the Premises.

  • PAVING Provide a standard bubble map, as part of the plans, showing locations of numbered points, and a table with point number, northing and easting coordinates, description, and BL station for each point, for the following: ▪ all platted control irons (set or not), including plat boundary irons, for the entire sub-division, not just the current phase ▪ benchmarks, including TBM set with preliminary survey In addition to the required coordinate information, the following shall be included in all plans, at a minimum, as needed for construction staking on all City projects. ▪ Include copy of plat(s) on all plans, as relevant and approved by the Design Engineer ▪ Benchmarks – minimum of two City standards, four total desirable; as close to project as possible, even if TBM set with preliminary survey. ▪ Benchmark elevations must be in the same datum as the design (i.e. NAV 88 design needs NAV 88 benchmarks, not NAV 29) ▪ All control irons/identified property irons shall be shown on plans, with BL stationing and offset ▪ Show deflection angles in BL, and/or bearing/azimuth of BL sections ▪ Arterial project side streets – provide BL station at CL of intersection of the two streets, on the BL; BL station and offset to CL of side street at removal limits; include deflection angle from BL to CL of side street ▪ Existing FL/pavement grades shown at all match points ▪ Top of curb grades and stationing at all ends-of-return and horizontal/vertical P.I.’s, not just even stationing ▪ CL top of pavement grades for arterial ▪ CL elevation for streets on mass grading work @ 100’ Sta in tangent sections and 50’ on curves.

  • Provisioning of Line Sharing and Splitter Space 3.2.1 BellSouth will provide ONS with access to the High Frequency Spectrum as follows:

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

Time is Money Join Law Insider Premium to draft better contracts faster.