Reporting Tool Integration Standards Sample Clauses

Reporting Tool Integration Standards. SAP Crystal Reports; Microsoft SQL Server Reporting Services. N/A 6.5 Web Content Management System. Drupal. N/A 6.6 Document Management Integration. OpenText. N/A 6.7 Geographic Information System and Integration Standards. ESRI - ArcGIS Desktop; RouteSmart / ArcGIS Network Analyst. N/A 7 Hosting Standards The following Hosting requirements apply: 7.1
AutoNDA by SimpleDocs
Reporting Tool Integration Standards. SAP Crystal Reports; Microsoft SQL Server Reporting Services. 3.5. Web Content Management System. Drupal 3.6. Document Management Integration. OpenText.

Related to Reporting Tool Integration Standards

  • PRODUCTION STANDARDS The Company may establish minimum production standards applicable to Representative.

  • Loop Testing/Trouble Reporting 2.1.6.1 Think 12 will be responsible for testing and isolating troubles on the Loops. Think 12 must test and isolate trouble to the BellSouth portion of a designed/non- designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, Think 12 will be required to provide the results of the Think 12 test which indicate a problem on the BellSouth provided Loop.

  • Testing/Trouble Reporting 1.15.1 TWTC will be responsible for testing and isolating troubles on Network Elements. TWTC must test and isolate trouble to the AT&T network before reporting the trouble to the Network Elements Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from AT&T at the time of the trouble report, TWTC will be required to provide the results of the TWTC test which indicate a problem on the AT&T network. Version: 4Q06 Standard ICA 11/30/06

  • REPORT STANDARDS Reports or written material prepared by the Contractor in response to the requirements of this Contract or request of the Project Officer shall, unless otherwise provided for in the Contract, meet standards of professional writing established for the type of report or written material provided, shall be thoroughly researched for accuracy of content, shall be grammatically correct and not contain spelling errors, shall be submitted in a format approved in advance by the Project Officer, and shall be submitted for advance review and comment by the Project Officer. The cost of correcting grammatical errors, correcting report data, or other revisions required to bring the report or written material into compliance with these requirements shall be borne by the Contractor. When submitting documents to APS, The Contractor shall comply with the following guidelines: All submittals and copies shall be printed on at least thirty percent (30%) recycled-content and/or tree-free paper; All submittals must be in the required tabular format in a binder. Report covers / binders shall be recyclable, made from recycled materials, and/or easily removable to allow for recycling of report pages (reports with glued bindings that meet all other requirements are acceptable); The use of plastic covers or dividers should be avoided; and Unnecessary attachments or documents not specifically asked for should not be submitted, and superfluous use of paper should be avoided.

  • Reporting of Metered Data and Parameters 7.2.1 The grid connected Solar PV power plants will install necessary equipment for regular monitoring of solar irradiance (including GHI, DHI and solar radiation in the module plane), ambient air temperature, wind speed and other weather parameters and simultaneously for monitoring of the electric power (both DC and AC) generated from the Project.

  • Construction Standards The Subrecipient and Developer shall ensure that all Approved Projects comply with the following requirements:

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Requirement to Utilize HUB Compliance Reporting System Pursuant to Texas Administrative Code, Title 34, Part 1, Sections 20.285(f) and 20.287(b), TFC administers monthly administration HSP-PAR compliance monitoring through its HUB Compliance Reporting System commonly known as B2G. PSP and PSP’s subcontractors/subconsultants shall submit required PAR information into the B2G system. Any delay in the timely submission of PAR information into the B2G system will be treated as an invoicing error subject to dispute under Texas Government Code Section 2251.042.

  • Reformulation Standards A “reformulated” product (a) contains lead in concentrations that do not exceed 90 parts per million, equivalent to 0.009%, in any exterior parts analyzed pursuant to U.S. Environmental Protection Agency (EPA) methodologies 3050B and 6010B, or (b) yields a result of no more than 1.0 micrograms of lead when sampled according to NIOSH 9100 protocol and analyzed according to EPA 6010B. In addition to the above tests, the Settling Entity may use equivalent methods utilized by any California or federal agency to determine lead content in a solid substance or the amount of the bioavailability of the toxicant through a wipe test, respectively.

  • WORKLOAD STANDARDS One (1) Direct Service Hour (DSH) will be equal to sixty (60) minutes of direct services.

Time is Money Join Law Insider Premium to draft better contracts faster.