Reset Button Sample Clauses

Reset Button. If the system goes wrong, reset it by pressing this recessed button with a ballpoint pen or sim- ilar pointed object. (See “Resetting the System” on page 126).
AutoNDA by SimpleDocs
Reset Button. BMC Initiated Reset‌ When the following events happen, the BMC will send a reset: • BIOS updated: The purpose is to make new BIOS take effect. BMC will reset the whole system except BMC itself. • Watchdog timeout: BMC will issue a reset if watchdog timeout. There are three watchdog timers supported on server. They are FRB2 watchdog timer which is initiated immediately when server is ready to boot, POST watchdog timer which is enabled by BIOS to monitor the whole POST process, and OS Load watchdog timer which is enabled by BIOS to monitor the OS booting process. The watchdog timer implementation detail is shown in the table below. Once one of the watchdog timers generate timeout events, BMC will reset the server. FRB2 Watchdog Timer Used for BIOS code loading check. After system boot, the FRB2 watchdog timer is started automatically by BMC. If BIOS code loading failed, FRB2 WDT bites. BMC switchover the BIOS flash then sends a reset to system. 30 seconds. POST Watchdog Timer Used for BIOS code execution check. If BIOS code loading finished, BIOS sends BMC command to stop FRB2 and then start POST watchdog timer. If BIOS code execution cannot pass specified checkpoints, POST WDT bites. BMC sends a reset to system. The timeout value is related to BIOS settings. They are 3 minutes, 4 minutes, 5 minutes and 6 minutes. OS Load Watchdog Timer Used for OS loading check. The timeout value is related to BIOS settings. If BIOS code execution done, BIOS sends commands to BMC to stop the POST WDT and starts the OS load WDT. OS Load WDT checks if everything works well in OS stage. After OS boot, BIOS doesn’t have right to feed watchdog timer to prevent watchdog timeout happening. User needs to write software in OS to keep feeding watchdog timer to prevent it timeout. The application is executed on payload. They are 5 minutes, 10 minutes, 15 minutes and 20 minutes. • IPMI reset command: in IPMI specification, it provides a command for payload reset. When user orders payload reset command, it will cause a reset to the server. The reset types the BMC initiated listed as below table. 0x00 No Reset Action Default No Action 0x01 WDT FRB2 WDT timer “FRB2” timeout Reset type : Power-up reset Action : Power off 🡪 wait for 6 seconds 🡪 Power on 0x02 WDT POST WDT timer “POST” timeout Reset type : Power-up reset Action : Power off 🡪 wait for 6 seconds 🡪 Power on 0x03 WDT OS Load WDT timer “OS Load” timeout Reset type : Power-up reset Action : Press Reset Button
Reset Button. If for some reason you cannot login to your WorldCard Team server, press and hold the [Reset] button above the power connector on the back of the server with a hard object such as a stylus pin until you hear a beep and then release it. This button can be used to return a portion of the settings to their default values. (It will not change the existing pro- grams and files): • The system administrator account (admin) password will be reset back to [ad- min]. • The system HTTP and HTTPS ports will be reset back to 8000 and 8001 re- spectively, and the system will revert to automatically obtaining an IP address. You can then use ASUSTOR Control Center to search for your WorldCard Team again. Chapter 4 WorldCard Team Applications Installation‌ ◎ Windows To install WorldCard Team application, please open web browser and access (http:// xxxxxxxx.xxxxxxxxxxxxx.xxx/) to open download page, then click [WorldCard Team (Windows)] to download. When the download is finished, please double click it to start install. After installing and launching the WorldCard Team application, please enter the WorldCard Team server URL and key in your account / password to log in. ◎ Mac To install WorldCard Team application, please open App Store in Mac system, and enter [WorldCard Team] in the upper-right search bar to search. Click [Get] button, and enter your Apple account / password to start download. When the download is finished, you will be able to find WorldCard Team application in [Applications]. After launching the WorldCard Team application, please enter the WorldCard Team server URL and key in your account / password to log in. ◎ iOS / Android To install WorldCard Team app, please open App Store / Google Play in your iOS / Android device, and search [WorldCard Team] to download and install. Or you can read the QR code below to access the download page: iOS Android After downloading and launching the WorldCard Team app, please enter the WorldCard Team server URL and your account / password to log in. Appendix A: Connecting Information of AD Server‌ If you are not clear with the connecting information of AD server, please refer to the instructions below:
Reset Button. If for some reason you cannot login to your WorldCard Team server, press and hold the [Reset] button above the power connector on the back of the server with a hard object such as a stylus pin until you hear a beep and then release it. This button can be used to

Related to Reset Button

  • Rate Determinations The Administrative Agent shall determine each interest rate applicable to the Loans and the Reimbursement Obligations hereunder, and its determination thereof shall be conclusive and binding except in the case of manifest error.

  • Interest Rate Determination (a) To the extent required hereunder, each Reference Bank agrees to furnish to the Administrative Agent timely information for the purpose of determining each Eurodollar Rate. If fewer than two Reference Banks furnish such timely information to the Administrative Agent for the purpose of determining any such rate, the Administrative Agent shall determine such interest rate on the basis of timely information furnished by the remaining Reference Bank. (b) The Administrative Agent shall give prompt notice to the applicable Borrower and the Lenders of the applicable interest rate determined by the Administrative Agent for purposes of Section 2.09(a) or (b), and, if applicable, the applicable rate, if any, furnished by each Reference Bank for the purpose of determining the applicable interest rate under Section 2.09(b). (c) If, with respect to any Eurodollar Rate Advances, (i) the Required Lenders notify the Administrative Agent that the Eurodollar Rate for any Interest Period for such Advances will not adequately reflect the cost to such Required Lenders of making, funding or maintaining their respective Eurodollar Rate Advances for such Interest Period, or (ii) the Reference Banks notify the Administrative Agent that adequate and fair means do not exist for ascertaining the applicable interest rate on the basis provided for in the definition of Eurodollar Rate, the Administrative Agent shall forthwith so notify the Borrowers and the Lenders, whereupon (A) each Eurodollar Rate Advance will automatically, on the last day of the then existing Interest Period therefor, Convert into a Base Rate Advance, and (B) the obligation of the Lenders to make, or to Convert Advances into, Eurodollar Rate Advances shall be suspended until the Administrative Agent shall notify the Borrowers and the Lenders that the circumstances causing such suspension no longer exist. (d) If the applicable Borrower shall fail to select the duration of any Interest Period for any Eurodollar Rate Advances in accordance with the provisions contained in the definition of “Interest Period” in Section 1.01, the Administrative Agent will forthwith so notify such Borrower and the Lenders and such Advances will automatically, on the last day of the then existing Interest Period therefor, Convert into Base Rate Advances. (e) On the date on which the aggregate unpaid principal amount of Eurodollar Rate Advances comprising any Borrowing shall be reduced, by payment or prepayment or otherwise, to less than $10,000,000, such Advances shall automatically Convert into Base Rate Advances. (f) Upon the occurrence and during the continuance of any Event of Default, (i) each Eurodollar Rate Advance will automatically, on the last day of the then existing Interest Period therefor, Convert into a Base Rate Advance and (ii) the obligation of the Lenders to make, or to Convert Advances into, Eurodollar Rate Advances shall be suspended.

  • Rate Quotations The Borrower may call the Administrative Agent on or before the date on which a Loan Request is to be delivered to receive an indication of the rates then in effect, but it is acknowledged that such projection shall not be binding on the Administrative Agent or the Lenders nor affect the rate of interest which thereafter is actually in effect when the election is made.

  • Arithmetical Errors 30.1 The tender sum as submitted and read out during the tender opening shall be absolute and final and shall not be the subject of correction, adjustment or amendment in any way by any person or entity. 30.2 Provided that the Tender is substantially responsive, the Procuring Entity shall handle errors on the following basis: a) Any error detected if considered a major deviation that affects the substance of the tender, shall lead to disqualification of the tender as non-responsive . b) Any errors in the submitted tender arising from a miscalculation of unit price, quantity, subtotal and total bid price shall be considered as a major deviation that affects the substance of the tender and shall lead to disqualification of the tender as non-responsive. and c) if there is a discrepancy between words and figures, the amount in words shall prevail. 30.3 Tenderers shall be notified of any error detected in their bid during the notification of a xxxx.

  • RESERVE PRICE AND BIDDING AT AUCTION CONDITIONS OF SALE 1.1 This sale is made by AmBank (M) Berhad [196901000166 (8515-D)][formerly known as AmFinance Berhad](“Assignee/Bank”) in exercise of the rights and powers conferred upon the Assignee/Bank pursuant to the Facility Agreement, Deed Of Assignment and Power Of Attorney all dated the 19th October, 2017 executed by Todi Ashish (Assignor/Borrower”) in favour of the Assignee/Bank subject to all conditions and category of land use, express or implied or imposed upon or relating to or affecting the property (“Property”) and shall further subject to the reserve price (“Reserve Price”) and the Conditions of Sale as appearing in the Proclamation of Sale. 1.2 Subject to the provisions of Clause 5 below the highest bidder for the Property described in the Proclamation of Sale if so allowed by the Auctioneer shall be the Purchaser (“Purchaser”) thereof and the Auctioneer shall have the right to reject any bid. If any dispute shall arise as to any bidding, the Property shall be at the option of the Auctioneer be put up again for sale at the last undisputed bid or the Auctioneer may decide on the dispute and the decision of the Auctioneer on all matters not provided for in this Conditions of Sale shall be final and binding in all respects if such decision is made during the course of conducting the auction on the auction date. 1.3 No bid shall be less than the previous bid and each bid shall be increased by a minimum amount to be determined by the Auctioneer at the time the Property is put up for sale and no bidding shall be withdrawn or retracted. Should there be any withdrawal or retraction from the registered bidder(s) or the highest bidder before or after the fall of the hammer, the bidding deposit (“Bidding Deposit”) shall be forfeited to the Assignee/Bank and the Property shall be at the option of the Auctioneer be put up for sale again or the Auctioneer may decide to adjourn the auction sale to another date. 1.4 In the event the subject matter offered for auction comprises more than one (1) property, the Auctioneer shall have the right to: - (a) determine or vary the order of sale; (b) offer the properties for sale either individually or en bloc or in any combination/manner as determined by the Auctioneer; and/or (c) withdraw any of the properties from the sale.

  • Calculation Agent The Calculation Agent is Party A.

  • Quotations Unless otherwise agreed any quotation given will normally remain valid for a period of 30 days from the date it is provided to you. We reserve the right to withdraw a quotation in certain circumstances, for example, where the insurer has altered their premium or terms for the insurance since the quotation was given or if a claim / incident has occurred since the terms were offered.

  • FIXED RATES If a fixed rate is in this Agreement, it is based on an estimate of the costs for the period covered by the rate. When the actual costs for this period are determined, an adjustment will be made to a rate of a future year(s) to compensate for the difference between the costs used to establish the fixed rate and actual costs.

  • Spread; Spread Multiplier; Index Maturity The “Spread” is the number of basis points (one one-hundredth of a percentage point) specified on the face hereof to be added to or subtracted from the related Interest Rate Basis or Interest Rate Bases applicable to this Note. The “Spread Multiplier” is the percentage specified on the face hereof of the related Interest Rate Basis or Interest Rate Bases applicable to this Note by which the Interest Rate Basis or Interest Rate Bases will be multiplied to determine the applicable interest rate. The “Index Maturity” is the period to maturity of the instrument or obligation with respect to which the related Interest Rate Basis or Interest Rate Bases will be calculated.

  • Provisional Interconnection Service Upon the request of Interconnection Customer, and prior to completion of requisite Interconnection Facilities, Network Upgrades, Local Upgrades, or system protection facilities Interconnection Customer may request limited Interconnection Service at the discretion of Transmission Provider based upon an evaluation that will consider the results of available studies, which terms shall be memorialized in the Interconnection Service Agreement. Consistent with Tariff, Part VI, Subpart B, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted with the Commission. Transmission Provider shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer interconnects without modifications to the Generating Facility or the Transmission System. Transmission Provider shall determine whether any Interconnection Facilities, Network Upgrades, Local Upgrades, or system protection facilities that are necessary to meet the requirements of NERC, or any applicable Regional Entity for the interconnection of a new, modified and/or expanded Generating Facility are in place prior to the commencement of Interconnection Service from the Generating Facility. Where available studies indicate that such Interconnection Facilities, Network Upgrades, Local Upgrades, and/or system protection facilities that are required for the interconnection of a new, modified and/or expanded Generating Facility are not currently in place, Transmission Provider will perform a study, at the Interconnection Customer’s expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Generating Facility shall be studied and updated annually and at the Interconnection Customer’s expense. The results will be communicated to the Interconnection Customer in writing upon completion of the study. Interconnection Customer assumes all risk and liabilities with respect to the Provisional Interconnection Service, including changes in output limits and Interconnection Facilities, Network Upgrades, Local Upgrades, and/or system protection facilities cost responsibilities.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!