Common use of ROADS AND SIDEWALKS Clause in Contracts

ROADS AND SIDEWALKS. (1) Rough grading of all roads must be completed and approved by the Engineer before the installation of any other service. (2) No stone shall be spread on roads or sod laid until: (a) the grading and condition of the subgrade and the ditches and back slopes have been inspected and approved by the Engineer; and (b) the Engineer has inspected and satisfied himself that no damage has been caused to sewer manholes or watermain valve boxes and that the cover to any watermain has not been reduced. (3) During the construction of engineering services and site grading and until the roads are assumed by the Town, the Owner will: (a) retain a professional engineer who will design, lay out and supervise the construction of the work; (b) maintain reasonable access at all times for residents and for Town services such as garbage collection, fire fighting etc. and the Engineer shall be the sole judge of the reasonability of such access; (c) maintain all roads in a dust free condition; (d) on or before the 1st day of November in each year, complete such work as it has, on or before the 10th day of October in that year, been directed in writing by the Engineer to perform in order to place the roads in a satisfactory condition for the winter, including stoning and grading and the installation of manhole covers and watermain valve boxes so as to prevent damage to snow ploughs; (4) Until the roads on the plan are paved and the curbs and gutters installed as required by this Agreement, the Owner will provide temporary surface drainage for the plan in accordance with a scheme submitted by the Owner and approved by the Engineer. (5) The Owner will commence the installation and laying of the curbs and gutters and the base layer of asphalt respectively, as required by this Agreement, within thirty days of having received written notice from the Engineer requiring the Owner to do so and the Owner will proceed expeditiously to complete such work, but nothing in this subsection relieves the Owner of its obligations to maintain the roads as required by this Agreement or if its obligations under subsection (4) of Section 30 of this Agreement, or under any other term of this Agreement. (6) If the Owner does not perform any work required by this section to the satisfaction of the Engineer upon one day’s written notice to the Owner, the Engineer may order the work done and the cost shall be a charge against the plan and no further building permits will be issued until such time as it is paid.

Appears in 2 contracts

Samples: Residential Subdivision Agreement, Residential Subdivision Agreement

AutoNDA by SimpleDocs

ROADS AND SIDEWALKS. (1) Rough grading of all roads must be completed and approved by the Engineer before the installation of any other service. (2) No stone shall be spread on roads or sod laid until: (a) the grading and condition of the subgrade and the ditches and back slopes have been inspected and approved by the Engineer; and (b) the Engineer has inspected and satisfied himself that no damage has been caused to sewer manholes or watermain valve boxes and that the cover to any watermain has not been reduced. (3) During the construction of engineering services and site grading and until the roads are assumed by the Town, the Owner will: (a) retain a professional engineer who will design, lay out and supervise the construction of the work; (b) maintain reasonable access at all times for residents and for Town services such as garbage collection, fire fighting etc. and the Engineer shall be the sole judge of the reasonability of such access; (c) maintain all roads in a dust free condition; (d) on or before the 1st day of November in each year, complete such work as it has, on or before the 10th day of October in that year, been directed in writing by the Engineer to perform in order to place the roads in a satisfactory condition for the winter, including stoning and grading and the installation of manhole covers and watermain valve boxes so as to prevent damage to snow ploughs; (4) Until the roads on the plan are paved and the curbs and gutters installed as required by this Agreement, the Owner will provide temporary surface drainage for the plan in accordance with a scheme submitted by the Owner and approved by the Engineer. (5) The Owner will commence the installation and laying of the curbs and gutters and the base layer of asphalt respectively, as required by this Agreement, within thirty days of having received written notice from the Engineer requiring the Owner to do so and the Owner will proceed expeditiously to complete such work, but nothing in this subsection relieves the Owner of its obligations to maintain the roads as required by this Agreement or if its obligations under subsection (4) of Section 30 21 of this Agreement, or under any other term of this Agreement. (6) If the Owner does not perform any work required by this section to the satisfaction of the Engineer upon one day’s written notice to the Owner, the Engineer may order the work done and the cost shall be a charge against the plan and no further building permits will be issued until such time as it is paid.

Appears in 1 contract

Samples: Development Agreement

ROADS AND SIDEWALKS. (1) Rough grading of all roads must be completed and approved by the Engineer before the installation of any other service. (2) No stone shall be spread on roads or sod laid until: (a) the grading and condition of the subgrade and the ditches and back slopes have been inspected and approved by the Engineer; and (b) the Engineer has inspected and satisfied himself that no damage has been caused to sewer manholes or watermain valve boxes and that the cover to any watermain has not been reduced. (32) During the construction of engineering services and site grading and until the roads are assumed by the Town, the Owner will: (a) retain a professional engineer who will design, lay out and supervise the construction of the work; (b) maintain reasonable access at all times for residents and for Town services such as garbage collection, fire fighting etc. and the Engineer shall be the sole judge of the reasonability of such access; (c) maintain all roads in a dust free condition; (d) on or before the 1st day of November in each year, complete such work as it has, on or before the 10th day of October in that year, been directed in writing by the Engineer to perform in order to place the roads in a satisfactory condition for the winter, including stoning and grading and the installation of manhole covers and watermain valve boxes so as to prevent damage to snow ploughs; (43) Until the roads on the plan are paved and the curbs and gutters installed as required by this Agreement, the Owner will provide temporary surface drainage for the plan in accordance with a scheme submitted by the Owner and approved by the Engineer. (54) The Owner will commence the installation and laying of the curbs and gutters and the base layer of asphalt respectively, as required by this Agreement, within thirty days of having received written notice from the Engineer requiring the Owner to do so and the Owner will proceed expeditiously to complete such work, but nothing in this subsection relieves the Owner of its obligations to maintain the roads as required by this Agreement or if its obligations under subsection (4) of Section 30 of this Agreement, or under any other term of this Agreement. (65) If the Owner does not perform any work required by this section to the satisfaction of the Engineer upon one day’s written notice to the Owner, the Engineer may order the work done and the cost shall be a charge against the plan and no further building permits will be issued until such time as it is paid.

Appears in 1 contract

Samples: Industrial Subdivision Agreement

AutoNDA by SimpleDocs

ROADS AND SIDEWALKS. (1) Rough grading of all roads must be completed and approved by the Engineer before the installation of any other service. (2) No stone shall be spread on roads or sod laid until: (a) the grading and condition of the subgrade and the ditches and back slopes have been inspected and approved by the Engineer; and (b) the Engineer has inspected and satisfied himself that no damage has been caused to sewer manholes or watermain valve boxes and that the cover to any watermain has not been reduced. (3) During the construction of engineering services and site grading and until the roads are assumed by the Town, the Owner will: (a) retain a professional engineer who will design, lay out and supervise the construction of the work; (b) maintain reasonable access at all times for residents and for Town services such as garbage collection, fire fighting etc. and the Engineer shall be the sole judge of the reasonability of such access; (c) maintain all roads in a dust free condition; (d) on or before the 1st day of November in each year, complete such work as it has, on or before the 10th day of October in that year, been directed in writing by the Engineer to perform in order to place the roads in a satisfactory condition for the winter, including stoning and grading and the installation of manhole covers and watermain valve boxes so as to prevent damage to snow ploughs; (4) Until the roads on the plan are paved and the curbs and gutters installed as required by this Agreementagreement, the Owner will provide temporary surface drainage for the plan in accordance with a scheme submitted by the Owner and approved approve by the Engineer. (5) The Owner will commence the installation and laying of the curbs and gutters and the base layer of asphalt respectively, as required by this Agreementagreement, within thirty days of having received written notice from the Engineer requiring the Owner to do so and the Owner will proceed expeditiously to complete such work, but nothing in this subsection relieves the Owner of its obligations to maintain the roads as required by this Agreement agreement or if its obligations under subsection (4) of Section 30 of this Agreementagreement, or under any other term of this Agreementagreement. (6) If the Owner does not perform any work required by this section to the satisfaction of the Engineer upon one day’s written notice to the Owner, the Engineer may order the work done and the cost shall be a charge against the plan and no further building permits will be issued until such time as it is paid.

Appears in 1 contract

Samples: Residential Subdivision Agreement

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!