SCOPE OF WORK OVERVIEW. The Project shall be engineered and constructed in accordance to the performance and design requirements identified in the Scope of Work, Exhibits, and Appendices and other documents referenced herein. The Project shall be designed to meet a minimum 35 year design life, considering the Site specific conditions and expected operating conditions. Contractor shall provide or cause to be provided materials, equipment, machinery, tools, labor, demolition, disposal, transportation, construction fuels, chemicals, construction utilities, administration, and other services and items required to complete the Project per the requirements set forth in this Exhibit A. Contractor shall provide an Energy Production Estimate based upon their proposed design using the latest version of PVSyst simulation software. Solar Irradiance information should be obtained from National Renewable Energy Laboratory (NREL) Solar Power Prospector at xxxx://xxxx.xxxx.xxx/prospector, (Average Annual GHI) for the Site. The facility shall be oriented physically to optimize annual energy production. The PV module arrangement, inverter locations and internal access roads (sufficient to allow module washing as required to meet Contractor’s predicted performance) shall be determined by Contractor. Contractor shall design the solar field layout with reference to any required setbacks along the Project property boundary (and sufficient for a security patrol road around the perimeter of the Project).
Appears in 2 contracts
Samples: Engineering, Procurement and Construction Agreement (Powersecure International, Inc.), Engineering, Procurement and Construction Agreement (Powersecure International, Inc.)
SCOPE OF WORK OVERVIEW. The Project shall be engineered and constructed in accordance to the performance and design requirements identified in the Scope of Work, Exhibits, and Appendices and other documents referenced herein. The Project shall be designed to meet a minimum 35 year design life, considering the Site specific conditions and expected operating conditions. Contractor shall provide or cause to be provided materials, equipment, machinery, tools, labor, demolition, disposal, transportation, construction fuels, chemicals, construction utilities, administration, and other services and items required to complete the Project per the requirements set forth in this Exhibit A. Contractor shall provide an Energy Production Estimate based upon their proposed design using the latest version of PVSyst simulation software. Solar Irradiance information should be obtained from National Renewable Energy Laboratory (NREL) Solar Power Prospector at xxxx://xxxx.xxxx.xxx/prospectorxxxx://xxxx.xxxx.xxx/prospector , (Average Annual GHI) for the Site. The facility shall be oriented physically to optimize annual energy production. The PV module arrangement, inverter locations and internal access roads (sufficient to allow module washing as required to meet Contractor’s predicted performance) shall be determined by Contractor. Contractor shall design the solar field layout with reference to any required setbacks along the Project property boundary (and sufficient for a security patrol road around the perimeter of the Project).
Appears in 2 contracts
Samples: Engineering, Procurement and Construction Agreement (Powersecure International, Inc.), Engineering, Procurement and Construction Agreement (Powersecure International, Inc.)