Scoreboard Basis of Design Sample Clauses

Scoreboard Basis of Design. The desired Basis of Design shall be an Outdoor rated Nevco Model 1654 equipped with a MPCX2 wireless Control Package. • Size: 14’ x5’ x8” Aluminum Housing • Digit Size: 18” / 14” • Digit Color: White • Wind load resistance up to 180 mph • Wireless Operation • Housing Color to be Royal Blue with white stripe or approved equal. • Energy efficient LED’s • Gasketed Digits to prevent weather infiltration • HOME,GUESTS,PERIOD,BALL,STRIKE,OUT,H,E shall be white 10” High Letters • Built in horn • Flush Mount • Timing and Team scores shall be 18” LED • Ability to choose a separate color for Timing and a different one for Team scores • Inning/Period shall be 14” in choice of colors • Time of Day: Not required unless standard • Pitch Count: Not required unless standard • Pitch timer: not required unless standard • Horn shall be an automatic two second blast when time reaches zero or operated manually • Indicators: 3” Height with Three for Ball, Two for Strike, Two for Out, one for Hit, One for error • City May chose from array of Standard Colors offered by Manufacturer • HOME Score needs to be on the Right Side and GUEST Score on the Left Side.
AutoNDA by SimpleDocs

Related to Scoreboard Basis of Design

  • Temperature Measurement Temperature will be measured by the nearest automatic Melbourne Bureau of Meteorology Monitoring Station for example (but not limited to): Melbourne, Moorabbin, Dunns Hill, Melbourne Airport, Frankston, and Point Xxxxxx. At the commencement of each project, the onsite management and employee representatives shall agree which is to be the applicable automatic weather monitoring station.

  • Non-tariff Measures 1. A Party shall not adopt or maintain any non-tariff measures on the importation of any good of the other Party or on the exportation of any good destined for the territory of the other Party except in accordance with its WTO rights and obligations or in accordance with other provisions of this Agreement. 2. Each Party shall ensure its non-tariff measures permitted in paragraph 1 are not prepared, adopted or applied with a view to, or with the effect of, creating unnecessary obstacles to trade between the Parties.

  • Usage Measurement Usage measurement for calls shall begin when answer supervision or equivalent Signaling System 7 (SS7) message is received from the terminating office and shall end at the time of call disconnect by the calling or called subscriber, whichever occurs first.

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Service Levels All service level requirements will be set forth in Exhibit A (“XXXX.xxx Referral Service Level Requirements”). Recipient Xxxxxx agrees to adhere, and encourage Recipient Agent’s adherence, with the version of the XXXX.xxx Referral Service Level Requirements in effect at the time XXXX.xxx identifies the Referral to Recipient Broker/Agent.

  • Interim Measures 6.1 The Parties acknowledge that the British Columbia Claims Task Force made the following recommendation concerning Interim Measures:

  • Covenants of Performance Measurement No interference. Registry Operator shall not interfere with measurement Probes, including any form of preferential treatment of the requests for the monitored services. Registry Operator shall respond to the measurement tests described in this Specification as it would to any other request from an Internet user (for DNS and RDDS) or registrar (for EPP). ICANN testing registrar. Registry Operator agrees that ICANN will have a testing registrar used for purposes of measuring the SLRs described above. Registry Operator agrees to not provide any differentiated treatment for the testing registrar other than no billing of the transactions. ICANN shall not use the registrar for registering domain names (or other registry objects) for itself or others, except for the purposes of verifying contractual compliance with the conditions described in this Agreement. PUBLIC INTEREST COMMITMENTS Registry Operator will use only ICANN accredited registrars that are party to the Registrar Accreditation Agreement approved by the ICANN Board of Directors on 27 June 2013 in registering domain names. A list of such registrars shall be maintained by ICANN on ICANN’s website. (Intentionally omitted. Registry Operator has not included commitments, statements of intent or business plans provided for in its application to ICANN for the TLD.) Registry Operator agrees to perform the following specific public interest commitments, which commitments shall be enforceable by ICANN and through the Public Interest Commitment Dispute Resolution Process established by ICANN (posted at xxxx://xxx.xxxxx.xxx/en/resources/registries/picdrp), which may be revised in immaterial respects by ICANN from time to time (the “PICDRP”). Registry Operator shall comply with the PICDRP. Registry Operator agrees to implement and adhere to any remedies ICANN imposes (which may include any reasonable remedy, including for the avoidance of doubt, the termination of the Registry Agreement pursuant to Section 4.3(e) of the Agreement) following a determination by any PICDRP panel and to be bound by any such determination. Registry Operator will include a provision in its Registry-Registrar Agreement that requires Registrars to include in their Registration Agreements a provision prohibiting Registered Name Holders from distributing malware, abusively operating botnets, phishing, piracy, trademark or copyright infringement, fraudulent or deceptive practices, counterfeiting or otherwise engaging in activity contrary to applicable law, and providing (consistent with applicable law and any related procedures) consequences for such activities including suspension of the domain name. Registry Operator will periodically conduct a technical analysis to assess whether domains in the TLD are being used to perpetrate security threats, such as pharming, phishing, malware, and botnets. Registry Operator will maintain statistical reports on the number of security threats identified and the actions taken as a result of the periodic security checks. Registry Operator will maintain these reports for the term of the Agreement unless a shorter period is required by law or approved by ICANN, and will provide them to ICANN upon request. Registry Operator will operate the TLD in a transparent manner consistent with general principles of openness and non-discrimination by establishing, publishing and adhering to clear registration policies.

  • Performance Measurement The Uniform Guidance requires completion of OMB-approved standard information collection forms (the PPR). The form focuses on outcomes, as related to the Federal Award Performance Goals that awarding Federal agencies are required to detail in the Awards.

  • MSAA Indicator Technical Specification Document This Agreement shall be interpreted with reference to the MSAA Indicator Technical Specifications document.

  • Milestone Schedule Please state the status and progress of each Milestone and identify any completed Milestone(s) for the previous calendar quarter.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!