Sealing of Cracks Sample Clauses

Sealing of Cracks. Crack sealing material to be covered by a 1 in. or less overlay shall cure a minimum of 45 days prior to the placement of bituminous pavement. The placement shall be such that the material is flush fill or concave down. Sealing of cracks will be at the request of the Engineer.
AutoNDA by SimpleDocs

Related to Sealing of Cracks

  • SCHEDULING OF THE WORK The number of working days stipulated for this Contract is 5. These working days shall be consecutive. The Contractor is not required to submit a schedule for this project. Liquidated damages will be assessed beyond the number of working days specified above as well as the completion date as noted in this tender form and agreement. The Contractor must advise the Engineer 48 hours in advance of work starting.

  • Felling of trees The Authority shall assist the Concessionaire in obtaining the Applicable Permits for felling of trees to be identified by the Authority for this purpose if and only if such trees cause a material adverse effect on the construction, operation or maintenance of the Bus Terminal. The cost of such felling shall be borne by the Authority, and in the event of any delay in felling thereof for reasons beyond the control of the Concessionaire, it shall be excused for failure to perform any of its obligations hereunder if such failure is a direct consequence of delay in the felling of trees. For the avoidance of doubt, the Parties hereto agree that the felled trees shall be deemed to be owned by the Authority and shall be disposed in such manner and subject to such conditions as the Authority may in its sole discretion deem appropriate.

  • Resealing of Documents Once the work has been sealed and accepted by the State, the State, as the owner, will notify the party to this contract, in writing, of the possibility that a State engineer, as a second engineer, may find it necessary to alter, complete, correct, revise or add to the work. If necessary, the second engineer will affix his seal to any work altered, completed, corrected, revised or added. The second engineer will then become responsible for any alterations, additions or deletions to the original design including any effect or impacts of those changes on the original engineer’s design.

  • Sealing and Marking of Bids 21.1 The bidder shall seal the original and each copy of the bid in separate envelopes duly marking the envelopes “ORIGINAL” and “COPY”. The envelopes shall then be sealed in an outer separate envelope.

  • RUNNING OF THE ACADEMY Teachers and staff

  • Provisioning of Line Sharing and Splitter Space 3.2.1 BellSouth will provide ONS with access to the High Frequency Spectrum as follows:

  • Shifting of obstructing utilities The Concessionaire shall, subject to Applicable Laws and with assistance of the Authority, undertake shifting of any utility including electric lines, water pipes and telephone cables, to an appropriate location or alignment within or outside the Site if and only if such utility causes or shall cause a material adverse effect on the construction, operation or maintenance of the Project. The cost of such shifting shall be borne by the Authority or by the entity owning such utility, if the Authority so directs, and in the event of any delay in shifting thereof, the Concessionaire shall be excused for failure to perform any of its obligations hereunder if such failure is a direct consequence of delay on the part of the entity owning such electric lines, water pipes or telephone cables, as the case may be.

  • Scheduling of Overtime In any case where no employee is available to work a shift or the extension of a shift at straight time, and the Employer thereupon determines that it is necessary to assign the work on an overtime basis, the following provisions will govern the assignment of the overtime.

  • CUTTING AND PATCHING OF WORK 4.14.1 The Contractor shall be responsible for all cutting, fitting or patching that may be required to complete the Work or to make its several parts fit together properly.

  • Cutting and Patching The Contractor shall be responsible for cutting, fitting or patching required to complete the Work or to make its parts fit together properly.

Time is Money Join Law Insider Premium to draft better contracts faster.