Second Public Review Draft Housing Element Sample Clauses

Second Public Review Draft Housing Element. Once HCD’s comment letter is received, Xxxxx will work collaboratively with City staff and the HCD reviewer to determine what specific revisions are required to achieve compliance. The revisions will be made and a detailed annotated summary of each HCD comment, followed by the City’s response and proposed revisions to the document, will be made. A “redlined” version of the Public Review Draft will be prepared highlighting the changes. A “clean” version also will be prepared. The Second Public Review Draft will be published and circulated. Public hearings before the Planning Commission and City Council will be held to adopt the Element. Xxxxx Xxxxxx will prepare the staff reports and resolutions for the Planning Commission and City Council hearings, along with the PowerPoint presentations for each meeting. Any additional changes made to incorporate public comments and changes recommended by the Planning Commission and City Council will be annotated following the meeting.
AutoNDA by SimpleDocs

Related to Second Public Review Draft Housing Element

  • Constructability Review Prepare detailed interdisciplinary constructability review within Fourteen (14) days of receipt of the plans from the District that:

  • CONSTRUCTION/PUBLIC WORKS CONTRACTS In compliance with Article 8, Section 220 of the New York State Labor Law:

  • Program Overview A. Goals of the Choice Neighborhoods Program. The Choice Neighborhoods Program employs a comprehensive approach to neighborhood transformation. The program transforms neighborhoods of concentrated poverty into mixed-income neighborhoods of long-term viability by revitalizing severely distressed public and/or assisted housing; improving access to economic opportunities; and investing and leveraging investments in well-functioning services, effective schools and education programs, public assets, public transportation, and improved access to jobs. Choice Neighborhoods ensures that current residents benefit from this transformation by preserving affordable housing in the neighborhood or providing the choice to move to affordable housing in another neighborhood of opportunity. The purpose of this grant is to implement a Transformation Plan that has been developed through a local planning process and furthers the goals of the Choice Neighborhoods Program. The core goals of Choice Neighborhoods are:

  • ONLINE PUBLIC AUCTION TERMS AND CONDITIONS The Terms and Conditions specified herein shall govern all users of xxxx.xxxxxxxx.xxx.xx. (PAH Website) IMPORTANT These terms and conditions apply to all online bidding at auction sales conducted by or in conjunction with AMBANK (M) BERHAD / AMBANK ISLAMIC BERHAD (“Online Public Auction”). By registering to participate, bidding or purchasing in a AMBANK (M) BERHAD / AMBANK ISLAMIC BERHAD auction sale via Online Public Auction, you expressly agree to be bound by these terms and conditions in full.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Commercial Operation Date Testing and Modifications Prior to the Commercial Operation Date, the Connecting Transmission Owner shall test the Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades and Developer shall test the Large Generating Facility and the Developer Attachment Facilities to ensure their safe and reliable operation. Similar testing may be required after initial operation. Developer and Connecting Transmission Owner shall each make any modifications to its facilities that are found to be necessary as a result of such testing. Developer shall bear the cost of all such testing and modifications. Developer shall generate test energy at the Large Generating Facility only if it has arranged for the injection of such test energy in accordance with NYISO procedures.

  • POST ONLINE PUBLIC AUCTION PROCEDURES 4.1. Successful E-bidders shall and undertake to sign the Memorandum of Sale at the office of the Auctioneer within 3 working days from the date of auction, failing which the deposit paid will be forfeited to the Assignee bank and the sale will be deemed cancelled/terminated and the property may be put up again for subsequent auction without further notice to the said E-Bidders. The Auctioneer shall send the Memorandum of Sale for stamping and thereafter forward the same together with the required deposit paid under Clause 2.4 above and the differential sum paid under this clause (if any) to the Assignee bank.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • Synchronisation Commissioning and Commercial Operation 8.1 The Developer shall provide at least forty (40) days advanced preliminary written notice and at least twenty (20) days advanced final written notice to ESCOM of the date on which it intends to synchronize the Power Project to the Grid System.

Time is Money Join Law Insider Premium to draft better contracts faster.