SELF-ADHERING ICE AND WATER BARRIER Sample Clauses

SELF-ADHERING ICE AND WATER BARRIER. A. Compliant with ASTM D 1970 and UL Listed.
AutoNDA by SimpleDocs

Related to SELF-ADHERING ICE AND WATER BARRIER

  • Enterprise Information Management Standards Grantee shall conform to HHS standards for data management as described by the policies of the HHS Office of Data, Analytics, and Performance. These include, but are not limited to, standards for documentation and communication of data models, metadata, and other data definition methods that are required by HHS for ongoing data governance, strategic portfolio analysis, interoperability planning, and valuation of HHS System data assets.

  • Copper Subloops Sprint will make available access to copper subloops on an unbundled basis. A copper subloop is a portion of a Copper Loop, or Hybrid Loop, and is comprised entirely of copper wire or copper cable that acts as a transmission facility between any accessible terminal in Sprint’s outside plant, including inside wire owned or controlled by Sprint, and the end-user customer premises. A copper subloop can also include intermediate devices, such as repeaters, used to establish the transmission path. Copper subloops can be used by CLEC to provide voice-grade services as well as digital subscriber line services. Access to copper subloops is subject to the collocation provisions of this Agreement. Copper subloop consists of the distribution portion of the copper loop. Sprint is not obligated to offer feeder loop plant as a stand-alone UNE.

  • OVATIONS FOOD SERVICES, L.P. dba SPECTRA All food and beverage service must be discussed with and approved by Spectra, the OCFEC Master Concessionaire. FORM F-31 AGREEMENT NO. R-026-18 DATE May 16, 2018 REVIEWED APPROVED RENTAL AGREEMENT FAIRTIME INTERIM XX THIS AGREEMENT by and between the 32nd District Agricultural Association dba OC Fair & Event Center, hereinafter called the Association, and B & L Productions, Inc. hereinafter, called the Rentor

  • Fertilizer Purchaser shall evenly spread the fertilizer listed below on all exposed soil inside the grubbing limits at a rate of 200 pounds per acre of exposed soil. Fertilizer must meet the following specifications: Chemical Component % by Weight Sulphur 3 Inerts 49 SECTION 9 – POST-HAUL ROAD WORK 9-3 CULVERT MATERIAL REMOVED FROM STATE LAND Culverts removed from roads become the property of the Purchaser and must be removed from state land.

  • Signaling Parameters All SS7 signaling parameters will be provided in conjunction with traffic exchange trunk groups, where and as available. These parameters include Automatic Number Identification ("ANI"), Calling Party Number ("CPN"), Privacy Indicator, calling party category information, originating line information, charge number, etc. Also included are all parameters relating to network signaling information, such as Carrier Information Parameter ("CIP"), wherever such information is needed for call routing or billing. GTE will provide SS7 via GR-394-SS7 and/or GR-317-SS7 format(s).

  • Infertility Services This plan covers the following services, in accordance with R.I. General Law §27-20-20. • Services for the diagnosis and treatment of infertility if you are:

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Supervisory Control and Data Acquisition (SCADA) Capability The wind plant shall provide SCADA capability to transmit data and receive instructions from the ISO and/or the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, as applicable, to protect system reliability. The Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected and the wind plant Developer shall determine what SCADA information is essential for the proposed wind plant, taking into account the size of the plant and its characteristics, location, and importance in maintaining generation resource adequacy and transmission system reliability in its area.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

Time is Money Join Law Insider Premium to draft better contracts faster.