Shop Drawing and Sample Submittal Requirements Sample Clauses

Shop Drawing and Sample Submittal Requirements. 1. Before submitting a Shop Drawing or Sample, Contractor shall have:
AutoNDA by SimpleDocs

Related to Shop Drawing and Sample Submittal Requirements

  • Shop Drawings and Samples a. Record date of receipt of Samples and approved Shop Drawings.

  • SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 4.12.1 Shop Drawings are drawings, diagrams, schedules and other, data specially prepared for the Work by the Contractor or any Subcontractor, manufacturer, supplier or distributor to illustrate some portion of the Work.

  • Required Submittals Complete shop drawings and manufacturer’s catalog data shall be submitted to the State and approved by the State prior to start of any construction work. Power and lighting panel configuration shall be complete with schedule of branch panels, separate disconnects, and circuit breakers, based on calculated and estimated motor, resistive and lighting loads. All circuits shall be labeled at the panel and at the outlet/power pole for future reference. Location of all electrical receptacles and telephone outlets (including power drops for the systems furnishings) shall be designated on a block floor plan showing the systems furnishings layout provided by the State. Said block floor plan shall be furnished by the State to the Owner/Lessor no later than 4 weeks after approved construction plans are received by the State.

  • General Program Requirements Subrecipient shall adhere, but not be limited to, the following requirements for all programs:

  • School Improvement Plans The School shall develop and implement a School Improvement Plan as required by section 1002.33(9)(n), Florida Statutes and applicable State Board of Education Rules or applicable federal law.

  • DEVELOPMENTAL REQUIREMENTS The Personal Development Plan (PDP) for addressing developmental gaps is attached as Annexure B.

  • Drawings and Specifications at the Project Site The Contractor shall keep at the Site at least one copy of the Contract Documents and Change Orders, all in good order and available to the Design Professional and to his representatives.

  • Contractor’s Submittals The Contract shall submit with reasonable promptness consistent with the Work Project Schedule and in orderly sequence all Shop Drawings, Samples, or other information required by the Contract Documents, or subsequently required by Change Order. Prior to submitting, the Contractor shall review each submittal for compliance with the Contract Documents and certify its approval by an approval stamp affixed to each copy. Submittal data presented without the Contractor’s certification will be returned without review or comment, and any delay resulting from such certification is the Contractor's responsibility.

  • Additional Request Requirements In addition to the requirements of Subparagraph 22A, the request for a WA must provide:

  • Completion of Concrete Pours and Emergency Work 24.14.1 Except as provided in this sub-clause an employee shall not work or be required to work in the rain.