Pavement The combined surface course, base course, and subbase course, if any, considered as a single unit.
PAVING Provide a standard bubble map, as part of the plans, showing locations of numbered points, and a table with point number, northing and easting coordinates, description, and BL station for each point, for the following: ▪ all platted control irons (set or not), including plat boundary irons, for the entire sub-division, not just the current phase ▪ benchmarks, including TBM set with preliminary survey In addition to the required coordinate information, the following shall be included in all plans, at a minimum, as needed for construction staking on all City projects. ▪ Include copy of plat(s) on all plans, as relevant and approved by the Design Engineer ▪ Benchmarks – minimum of two City standards, four total desirable; as close to project as possible, even if TBM set with preliminary survey. ▪ Benchmark elevations must be in the same datum as the design (i.e. NAV 88 design needs NAV 88 benchmarks, not NAV 29) ▪ All control irons/identified property irons shall be shown on plans, with BL stationing and offset ▪ Show deflection angles in BL, and/or bearing/azimuth of BL sections ▪ Arterial project side streets – provide BL station at CL of intersection of the two streets, on the BL; BL station and offset to CL of side street at removal limits; include deflection angle from BL to CL of side street ▪ Existing FL/pavement grades shown at all match points ▪ Top of curb grades and stationing at all ends-of-return and horizontal/vertical P.I.’s, not just even stationing ▪ CL top of pavement grades for arterial ▪ CL elevation for streets on mass grading work @ 100’ Sta in tangent sections and 50’ on curves.
Playground ~ The playground is primarily for the use of children under the age of twelve (12). Any child caught throwing rocks, vandalizing, or hitting or teasing other children will be asked to leave the playground. An adult or appropriate baby-sitter must accompany all children under the age of six (6) years old. Garbage ~ The storage, collection and disposal of refuse and garbage in the recreational camping areas shall be conducted as to create no health hazards, rodent harborage, insect breeding areas, accident or fire hazards, or air pollution. Bag all food garbage in plastic and tie shut before placing in the dumpster, to prevent odor and rodents which are drawn to the garbage area, such as skunks, raccoons etc. Dumpster is for normal daily household garbage, no large boxes, building supplies, carpets etc. Camper is to dispose of this type of garbage elsewhere. Garbage may be placed in dumpsters only. If a dumpster is full, do not place garbage on or around the dumpster, find an empty dumpster to place your garbage into. Bags of garbage may not be set outside your camper for any reason. Disposal or deposit of hazardous or toxic waste is prohibited. No gas, oil, batteries, or car fluids may be deposited into the dumpsters or around the dumpsters. Hazardous materials will not be disposed of by the garbage service. Disposal or deposit of furniture, barbeque grills, washer, dryers, and other large household items are NOT permitted on, in or around the dumpsters. Holding Tanks ~ There is no size restriction on holding tanks, however, they must be opaque XX xxxx/black water approved tanks. The on-site dump station may be used to empty tanks that hold 50 gallons or less. For tanks over 50 gallons Camper must contract with a pumping service to pump and remove tank contents from campground. No dumping of xxxx water onto the ground. Docks ~ Campground does NOT have a lifeguard on duty. The docks are privately owned. In order to be on someone's dock you must receive permission from the dock owner. An adult must accompany all children on the docks after dark. Life jackets are required for young children fishing off docks. Running, diving, and/or horseplay are not allowed on the docks. All debris and toys must be removed from the docks, beach and marina area. Inappropriate behavior, intoxication or shouting on docks is not allowed. Glass is not allowed on the beach area. Jet skies, wave runners, etc. are not permitted in the marina area. Tires cannot be left in the marina area under boats or tied onto docks. Fish House ~ Clean up fish cleaning facility when done with your fish cleaning and bag all fish remains. Fish cleaning house must be kept clean and all fish waste must be put into plastic bags and deposited into dumpster and cover on dumpster closed. No dumping of fish wastes into marina or dog waste stations! Swimming Pool ~ Campers are required to abide by all rules posted in and around the pool area.
Basement Any leaks or evidence of moisture? Yes No Unknown Does Not Apply Comments:
Vlastnictví Zdravotnické zařízení si ponechá a bude uchovávat Zdravotní záznamy. Zdravotnické zařízení a Zkoušející převedou na Zadavatele veškerá svá práva, nároky a tituly, včetně práv duševního vlastnictví k Důvěrným informacím (ve smyslu níže uvedeném) a k jakýmkoli jiným Studijním datům a údajům.
Irrigation Systems The Project Area either has no irrigation system or a low-volume drip irrigation system. If a watering system is used, it is a drip irrigation system equipped with a filter, pressure regulator and emitters rated at twenty (20) gallons per hour (gph) or less. The system is maintained free of leaks and malfunctions. No spray irrigation is applied to the Project Area, including spray from irrigation systems adjacent to the Project Area.
Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.
Fences Except for establishment cost incurred by the United States and replacement cost not due to the Landowner’s negligence or malfeasance, all other costs involved in maintenance of fences and similar facilities to exclude livestock are the responsibility of the Landowner. The installation or use of fences which have the effect of preventing wildlife access and use of the Easement Area are prohibited on the Easement Area, easement boundary, or on the Landowner’s land that is immediately adjacent to, and functionally related to, the Easement Area.
Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.
TOOL STORAGE 1. A company shall provide on all construction jobs in towns and cities, and elsewhere where reasonably necessary and practicable (or if requested buy the employee), a suitable and secure waterproof lock-up solely for the purpose of storing employees’ tools, and on multi-storey and major projects the company shall provide, where possible, a suitable lock-up for employees’ tools within a reasonable distance of the work area of large groups of employees.