Specialty Inspections Sample Clauses

Specialty Inspections. Furnish the periodic services of engineering staff experience in water supply well construction to supplement the RPR during the construction and testing period as appropriate to perform specialized inspections associated with work and compliance reporting in accordance with regulatory agency construction permit sworn statement requirements. Specialty inspection labor will include attendance at field meetings requested by the City.
AutoNDA by SimpleDocs
Specialty Inspections. Consultant and City will agree as part of Consultant’s scope of work any specialty inspections or testing services that the City requires from Consultant for the work. Consultant shall perform the agreed specialty inspections and testing in accordance with the contract for construction. Full time observation of railroad undercrossing tunneling will be provided. During the full time tunneling inspection, a supplemental inspector will be provided for the balance of the concurrent work. (40 hours per week, 4 week duration = 160 hours assumed for supplemental inspector). A single site visit for observation/inspection of the COID canal crossing cut-off walls, and field joint fusion of pre-cast HDPE or PVC thermoplastic liner on concrete manholes near the Schedule F railroad crossing is assumed by a structural engineer (16 hours total assumed). This task includes allowance for survey staff to make field visit for construction phase surveying services (these services may include record of survey for completed facilities, survey to resolve differing site conditions, or other survey work requested by CM/Inspector.)
Specialty Inspections. Consultant and City will agree as part of Consultant’s scope of work any specialty inspections or testing services that the City requires from Consultant for the work. Consultant shall perform the agreed specialty inspections and testing in accordance with the contract for construction. Site visits for observation/inspection of pre-cast bearing pads for HDPE manholes, and pre-cast thermoplastic liner installation on concrete manholes is assumed by a structural engineer (16 hours total assumed). This task includes allowance for survey staff to make field visit for construction phase surveying services (these services may include survey for completed facilities, survey to resolve differing site conditions, or other survey work requested by CM/Inspector.)

Related to Specialty Inspections

  • Property Inspections The Servicer shall conduct property inspections in accordance with the milestones of the repair and rehabilitation plan for such Mortgaged Property and prepare Property Inspection Reports on any Mortgaged Property involving property damage over $15,000. The Servicer shall furnish a copy of the repair and rehabilitation plan for such Mortgaged Property to the Master Servicer upon request.

  • Property Inspection The Servicer is required to inspect each Delinquent Mortgaged Property at such time and in such manner as is in accordance with Prudent Servicing Practices. The Servicer must prepare a Property Inspection Report following each inspection. All Property Inspection Reports must be retained by the Servicer and copies thereof must be forwarded to the Master Servicer promptly upon request. All expenses related to the foregoing shall be recoverable by the Servicer from the Principal or from Liquidation Proceeds, Insurance Proceeds, payments on the related Mortgage Loan or any other source relating to the related Mortgage Loan or the related Mortgaged Property. The foregoing shall not preclude the Servicer from recovering such expenses from the Borrower to the extent permitted by applicable law and the related Mortgage Loan Documents.

  • Safety Inspection During inspection of County facilities conducted by the State Division of Occupational Safety and Health for the purpose of determining compliance with the California OSHA requirements, an OCEA designated employee shall be allowed to accompany the inspector while the inspector is in the employee's agency/department. The employee so designated shall suffer no loss of pay when this function is performed during the employee's regularly scheduled work hours.

  • Records; Inspection Reneo shall, and shall cause its Affiliates and Sublicensees to, keep complete, true and accurate books of account and records for the purpose of determining the payments to be made under this Agreement. Such books and records shall be kept for [***] years following the end of the calendar year to which they pertain. Such records shall be open for inspection during such period by independent accountants, solely for the purpose of verifying payment statements hereunder for a period covering not more than the [***] prior to the date of request; provided that no period shall be subject to inspection under this section more than once. Such inspections shall be made no more than once each calendar year, on reasonable notice during normal business hours. The auditor will execute a reasonable written confidentiality agreement with Reneo and will disclose to vTv only such information as is reasonably necessary to provide vTv with information regarding any actual or potential discrepancies between amounts reported and actually paid and amounts payable under this Agreement. The auditor will send a copy of the report to Reneo at the same time it is sent to vTv. The report sent to both Parties will include the methodology and calculations used to determine the results. Any unpaid amounts (plus interest as set forth in Section 3.8) that are discovered shall be paid promptly by Reneo. Inspections conducted under this Section 3.9 shall be at the expense of vTv, unless the inspection discloses an underpayment by Reneo of [***] or more of the amount due for any period covered by the inspection, whereupon all costs relating to the inspection for such period shall be paid promptly by Reneo. If an inspection conducted pursuant to this Section 3.9 discloses an overpayment by Reneo, then Reneo will deduct the amount of such overpayment from amounts otherwise owed to vTv under this Agreement, unless no further payments are due hereunder, in which case the amount of such overpayment shall be refunded by vTv to Reneo.

  • Environmental Inspections In the event Landlord has a reasonable basis to believe that Tenant is in breach of its obligations under Sections 32.1 through 32.4, Landlord shall have the right, from time to time, during normal business hours and upon not less than five (5) Business Days written notice to Tenant (except in the case of an emergency that constitutes an imminent threat to human health or safety or damage to property, in which event Landlord shall undertake reasonable efforts to notify a representative of Tenant as soon as practicable under the circumstances), to conduct an inspection of the Leased Property or any portion thereof (and Tenant shall be permitted to have Landlord or its representatives accompanied by a representative of Tenant) to determine the existence or presence of Hazardous Substances on or about the Leased Property or any portion thereof. In the event Landlord has a reasonable basis to believe that Tenant is in breach of its obligations under Sections 32.1 through 32.4, Landlord shall have the right to enter and inspect the Leased Property or any portion thereof, conduct any testing, sampling and analyses it reasonably deems necessary and shall have the right to inspect materials brought into the Leased Property or any portion thereof. Landlord may, in its discretion, retain experts to conduct the inspection, perform the tests referred to herein, and to prepare a written report in connection therewith if Landlord has a reasonable basis to believe that Tenant is in breach of its obligations under Sections 32.1 through 32.4. All costs and expenses incurred by Landlord under this Section 32.6 shall be the responsibility of Landlord, except solely to the extent Tenant has breached its obligations under Sections 32.1 through 32.5, in which event such reasonable costs and expenses shall be paid by Tenant to Landlord as provided in Section 32.4. Failure to conduct an environmental inspection or to detect unfavorable conditions if such inspection is conducted shall in no fashion constitute a release of any liability for environmental conditions subsequently determined to be associated with or to have occurred during Tenant’s tenancy. Tenant shall remain liable for any environmental condition related to or having occurred during its tenancy regardless of when such conditions are discovered and regardless of whether or not Landlord conducts an environmental inspection at the termination of this Lease. The obligations set forth in this Article XXXII shall survive the expiration or earlier termination of this Lease but in no event shall Article XXXII apply to matters first occurring after the later of (x) the end of the Term and (y) the date upon which Tenant shall have vacated the Leased Property and surrendered the same to Landlord, in each case to the extent such matters are not or were not caused by the acts or omissions of Tenant in breach of this Lease.

  • Audits/Inspections Contractor agrees to permit the County’s Auditor-Controller or the Auditor- Controller’s authorized representative (including auditors from a private auditing firm hired by the County) access during normal working hours to all books, accounts, records, reports, files, financial records, supporting documentation, including payroll and accounts payable/receivable records, and other papers or property of Contractor for the purpose of auditing or inspecting any aspect of performance under this Contract. The inspection and/or audit will be confined to those matters connected with the performance of the Contract including, but not limited to, the costs of administering the Contract. The County will provide reasonable notice of such an audit or inspection. The County reserves the right to audit and verify the Contractor’s records before final payment is made. Contractor agrees to maintain such records for possible audit for a minimum of three years after final payment, unless a longer period of records retention is stipulated under this Contract or by law. Contractor agrees to allow interviews of any employees or others who might reasonably have information related to such records. Further, Contractor agrees to include a similar right to the County to audit records and interview staff of any subcontractor related to performance of this Contract. Should the Contractor cease to exist as a legal entity, the Contractor’s records pertaining to this Contract shall be forwarded to the County’s project manager.

  • Tests and Inspections § 15.5.1 Tests, inspections and approvals of portions of the Work shall be made as required by the Design-Build Documents and by applicable laws, statutes, ordinances, codes, rules and regulations or lawful orders of public authorities. Unless otherwise provided, the Design-Builder shall make arrangements for such tests, inspections and approvals with an independent testing laboratory or entity acceptable to the Owner, or with the appropriate public authority, and shall bear all related costs of tests, inspections and approvals. The Design-Builder shall give the Owner timely notice of when and where tests and inspections are to be made so that the Owner may be present for such procedures. The Owner shall bear costs of (1) tests, inspections or approvals that do not become requirements until after bids are received or negotiations concluded, and (2) tests, inspections or approvals where building codes or applicable laws or regulations prohibit the Owner from delegating their cost to the Design-Builder. § 15.5.2 If the Owner determines that portions of the Work require additional testing, inspection or approval not included under Section 15.5.1, the Owner will instruct the Design-Builder to make arrangements for such additional testing, inspection or approval by an entity acceptable to the Owner, and the Design-Builder shall give timely notice to the Owner of when and where tests and inspections are to be made so that the Owner may be present for such procedures. Such costs, except as provided in Section 15.5.3, shall be at the Owner’s expense. § 15.5.3 If such procedures for testing, inspection or approval under Sections 15.5.1 and 15.5.2 reveal failure of the portions of the Work to comply with requirements established by the Design-Build Documents, all costs made necessary by such failure shall be at the Design-Builder’s expense. § 15.5.4 Required certificates of testing, inspection or approval shall, unless otherwise required by the Design-Build Documents, be secured by the Design-Builder and promptly delivered to the Owner. § 15.5.5 If the Owner is to observe tests, inspections or approvals required by the Design-Build Documents, the Owner will do so promptly and, where practicable, at the normal place of testing. § 15.5.6 Tests or inspections conducted pursuant to the Design-Build Documents shall be made promptly to avoid unreasonable delay in the Work.

  • TESTING AND INSPECTION 6.1 Pre-Commercial Operation Date Testing and Modifications.

  • Equipment Testing and Inspection 2.1.1 The Interconnection Customer shall test and inspect its Small Generating Facility and Interconnection Facilities prior to interconnection. The Interconnection Customer shall notify the NYISO and the Connecting Transmission Owner of such activities no fewer than five Business Days (or as may be agreed to by the Parties) prior to such testing and inspection. Testing and inspection shall occur on a Business Day. The Connecting Transmission Owner may, at its own expense, send qualified personnel to the Small Generating Facility site to inspect the interconnection and observe the testing. The Interconnection Customer shall provide the NYISO and Connecting Transmission Owner a written test report when such testing and inspection is completed. The Small Generating Facility may not commence parallel operations if the NYISO, in consultation with the Connecting Transmission Owner, finds that the Small Generating Facility has not been installed as agreed upon or may not be operated in a safe and reliable manner. 2.1.2 The NYISO and Connecting Transmission Owner shall each provide the Interconnection Customer written acknowledgment that it has received the Interconnection Customer’s written test report. Such written acknowledgment shall not be deemed to be or construed as any representation, assurance, guarantee, or warranty by the NYISO or Connecting Transmission Owner of the safety, durability, suitability, or reliability of the Small Generating Facility or any associated control, protective, and safety devices owned or controlled by the Interconnection Customer or the quality of power produced by the Small Generating Facility.

  • Goods Inspection The Commissioner of DAS, in consultation with the Client Agency, shall determine the manner and prescribe the inspection of all Goods and the tests of all samples submitted to determine whether they comply with all of the specifications in the Contract. If any Goods fail in any way to meet the specifications in the Contract, the Client Agency or the Commissioner of DAS may, in its sole discretion, either reject it and owe nothing or accept it and pay for it on an adjusted price basis, depending on the degree to which the Goods meet the specifications. Any decision pertaining to any such failure or rejection shall be final and binding.