Spillway Sample Clauses

Spillway. The spillway will be a reinforced concrete structure that will be located on the north side of the Burntwood River, northeast of Taskinigup Falls adjacent to the Non-overflow Gravity Dam. The purpose of the spillway will be to pass excess inflows and to be part of the system of flow regulation. The structure will be located within a connecting channel, referred to as the spillway channel, excavated in the bedrock which separates the upstream and downstream sections of the river. Operable steel vertical lift gates within the structure will be used to control the flow of water in the spillway channel. The spillway will be designed to pass the Probable Maximum Flood (PMF) safely. There will be a road on the upstream side of the structure to allow access across the structure.
AutoNDA by SimpleDocs
Spillway. A concrete spillway with 14 gates, 380 metres long, capable of spilling up to 58,000 m3 per second, with an access channel dug upstream from the spillway. A channel lined with concrete will transmit the overflow from the spillway to the Paraná River approximately 1,500 metres downstream from the main dam.
Spillway. The spillway (Figure 4−8) will be used infrequently because the design flow capacity of the turbines is greater than the average flow of water into the reservoir. During spring runoff, turbine shut down for maintenance, or emergencies, the spillway will release water from the reservoir. The spillway will accommodate a probable maximum flood (PMF) of 20,800 m3/s. Located on the south bank, the spillway will have eight gated openings on a parabolic crest sloping down to a lined chute, a flip bucket, a large plunge pool and a short channel to the river. A cross−section of the spillway is shown in Figure 4−8. VOLUME IA, CHAPTER 4 PROJECT DESCRIPTION PAGE 4−9 ENVIRONMENTAL IMPACT STATEMENT I LOWER XXXXXXXXX HYDROELECTRIC GENERATION PROJECT The spillway will be equipped with eight, fixed−wheel vertical lift gates, each 13 m wide and 20 m high. The crest will discharge spillway flows at an elevation of 105.4 m into a 130 m wide, concrete−lined chute and flip bucket. The flip bucket allows the water to plunge into the unlined stilling basin (plunge pool) for the dissipation of its energy before passing into the discharge channel and the river. The elevation at the bottom of the 255 m long and 130 m wide plunge pool will be 14 m. The discharge channel will deliver water back to the river at less than 7 m/s.
Spillway. A concrete spillway with 14 gates, 380 metres long, capable of spilling up
Spillway. The spillway is a reinforced concrete channel located within the ridge about 900 feet from the right abutment of the dam. It has a xxxx length of about 82 feet and a capacity of 5,260 cfs. The estimated PMF has been updated during the planning study, indicated that the there is inadequate spillway capacity to prevent overtopping of the dams (main and auxiliary) during the PMF. The Staff Recommended Alternative includes raising the main and auxiliary dams to provide adequate freeboard during PMF loading.

Related to Spillway

  • Basement Any leaks or evidence of moisture? Yes No Unknown Does Not Apply Comments:

  • Dewatering (a) Where the whole of a site is so affected by surface water following a period of rain that all productive work is suspended by agreement of the Parties, then dewatering shall proceed as above with Employees so engaged being paid at penalty rates as is the case for safety rectification work. This work is typically performed by Employees engaged within CW1, CW2 or CW3 classifications. When other Employees are undertaking productive work in an area or areas not so affected then dewatering will only attract single time rates. (b) Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, appropriate Employees shall assist in the tidying up of their own work site or area if it is so affected. Where required, appropriate Employees will be provided with the appropriate PPE. Such work to be paid at single time rates. Productive work will continue in areas not so affected. (c) To avoid any confusion any ‘dewatering’ time which prevents an Employee from being engaged in their normal productive work is not included in any calculation for the purposes of determining whether an Employee is entitled to go home due to wet weather (refer clauses 32.4 and 32.5)

  • ADJACENT EXCAVATION-SHORING If an excavation shall be made upon land adjacent to the demised premises, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter upon the demised premises for the purpose of doing such work as said person shall deem necessary to preserve the wall or the building of which demised premises form a part from injury or damage and to support the same by proper foundations without any claim for damages or indemnity against Owner, or diminution or abatement of rent.

  • Underground Storage Tanks In accordance with the requirements of Section 3(g) of the D.C. Underground Storage Tank Management Act of 1990, as amended by the District of Columbia Underground Storage Tank Management Act of 1990 Amendment Act of 1992 (D.C. Code § 8-113.01, et seq.) (collectively, the “UST Act”) and the applicable D.C. Underground Storage Tank Regulations, 20 DCMR Chapter 56 (the “UST Regulations”), District hereby informs the Developer that it has no knowledge of the existence or removal during its ownership of the Property of any “underground storage tanks” (as defined in the UST Act). Information pertaining to underground storage tanks and underground storage tank removals of which the D.C. Government has received notification is on file with the District Department of the Environment, Underground Storage Tank Branch, 00 X Xxxxxx, X.X., Xxxxx Xxxxx, Xxxxxxxxxx, X.X., 00000, telephone (000) 000-0000. District’s knowledge for purposes of this Section shall mean and be limited to the actual knowledge of Xxxxxx Xxxxx, Property Acquisition and Disposition Division of the Department of Housing and Community Development, telephone no. (000) 000-0000. The foregoing is set forth pursuant to requirements contained in the UST Act and UST Regulations and does not constitute a representation or warranty by District.

  • Clean Air The Contractor agrees to: (a) comply with all applicable standards, orders or regulations issued pursuant to the Clean Air Act, as amended, 42 U.S.C. §§ 7401 – 7671q, et seq. The Contractor agrees to report each violation to SMART and understands and agrees that SMART will, in turn, report each violation as required to assure notification to FTA and the appropriate EPA Regional Office; and (b) include these requirements in each subcontract exceeding $150,000 financed in whole or in part with Federal assistance provided by FTA.

  • FLOORING All Bed Rooms, Dinning-cum-Living, and would be finished with Ivory Vitrified tiles (24'' X 24'') flooring and 4'' skirting. Bath-room, Kitchen & Balcony would be finished with Ivory Ceramic tiles (12'' X 12'') flooring. The walls of the Toilets/Bathrooms would finish with white glazed tiles in 60'' height. Roof would be finished with roof tiles.

  • Porcupine Site Highway 11 and the City of Timmins Thunder Bay and District Toronto/York-Peel

  • Excavation If an excavation shall be made upon land adjacent to the Leased Premises, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter upon the Leased Premises for the purpose of doing such work as said person shall deem necessary to preserve the wall or the building of which the Leased Premises form a part from injury or damage and to support the same by proper foundation, without any claim for damages or indemnity from Landlord, or diminution or abatement of Rent.

  • TENANT PARKING Tenant shall rent from Landlord, commencing on the Commencement Date, the amount of parking spaces set forth in Section 9 of the Summary, on a monthly basis throughout the Lease Term, which parking spaces shall pertain to parking on a first-come, first-served, as available basis in the Project parking facility. Tenant shall not use any space to park more than one vehicle at a time. Tenant may surrender spaces on not less than thirty (30) days prior Notice at which time Tenant’s right to re-rent such space shall expire. The location of the reserved parking spaces, if any, shall be designated by Landlord. Tenant shall pay monthly fees for all parking spaces rented by Tenant, on a monthly basis together with Base Rent, at the prevailing rate charged from time to time. In addition, Tenant shall be responsible for any increases in taxes imposed by any governmental authority in connection with the renting of such parking spaces by Tenant or the use of the parking facility by Tenant regardless of whether Landlord charges Tenant for such parking separately or at all. Tenant’s continued right to use the parking spaces is conditioned upon Tenant abiding by all rules and regulations which are prescribed from time to time for the orderly operation and use of the parking facility where the parking spaces are located (including any sticker or other identification system established by Landlord and the prohibition of vehicle repair and maintenance activities in the Project’s parking facilities), Tenant’s cooperation in seeing that Tenant’s employees and visitors also comply with such rules and regulations and Tenant not being in Default under this Lease. Neither Tenant nor its employees shall park automobiles in the Project parking facility overnight. All vehicles parked in the Project parking facility must be properly licensed in accordance with the laws of the State in which the Project is located and in operable condition. No oversized vehicles, commercial vehicles or vehicles which would damage the surface of the Project parking facility, shall be permitted to use the Project parking facility. Tenant’s use of the Project parking facility shall be at Tenant’s sole risk and Tenant acknowledges and agrees that Landlord shall have no liability whatsoever for damage to the vehicles of Tenant, its employees and/or visitors, or for other personal injury or property damage or theft relating to or connected with the parking rights granted herein or any of Tenant’s, its employees’ and/or visitors’ use of the parking facilities. Tenant’s rights hereunder are subject to the terms of any Underlying Documents. Landlord specifically reserves the right to change the size, configuration, design, layout and all other aspects of the Project parking facility at any time and Tenant acknowledges and agrees that Landlord may, without incurring any liability to Tenant and without any abatement of Rent under this Lease, from time to time, close-off or restrict access to the Project parking facility for purposes of permitting or facilitating any such construction, alteration or improvements. Landlord may issue a total number of unreserved spaces for the Project parking facility based on past usage patterns rather than limiting spaces to the number of spaces. Landlord may delegate its responsibilities hereunder to a parking operator in which case such parking operator shall have all the rights of control attributed hereby to the Landlord and, at Landlord’s sole discretion, the monthly fees for parking spaces may be billed by and paid to the parking operator. The parking spaces rented by Tenant pursuant to this Article 28 are provided to Tenant solely for use by Tenant’s own personnel and such spaces may not be transferred, assigned, subleased or otherwise alienated by Tenant without Landlord’s prior approval. Tenant may validate visitor parking by such method or methods as the Landlord may establish, at the validation rate from time to time generally applicable to visitor parking. Landlord may cancel parking spaces which remain unused for ninety (90) days or more.

  • Groundwater Any water, except capillary moisture, beneath the land surface or beneath the bed of any stream, lake, reservoir or other body of surface water within the boundaries of this state, whatever may be the geologic formation or structure in which such water stands, flows, percolates, or otherwise moves.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!