Common use of Stage Payment for Works Clause in Contracts

Stage Payment for Works. 19.5.1 Within 10 (ten) days of receipt of the Stage Payment Statement from the Contractor pursuant to Clause 19.4, the Authority’s Engineer shall broadly determine the amount due to the Contractor and recommend the release of 90 (ninety) percent of the amount so determined as part payment against the Stage Payment Statement, pending issue of the Interim Payment Certificate by the Authority’s Engineer. Within 10 (ten) days of the receipt of recommendation of the Authority’s Engineer, the Authority shall make electronic payment directly to the Contractor’s bank account. 19.5.2 Within 15 (fifteen) days of the receipt of the Stage Payment Statement referred to in Clause 19.4, the Authority’s Engineer shall determine and shall deliver to the Authority and the Contractor an IPC certifying the amount due and payable to the Contractor, after adjusting the payments already released to the Contractor against the said statement. For the avoidance of doubt, the Parties agree that the IPC shall specify all the amounts that have been deducted from the Stage Payment Statement and the reasons therefor. 19.5.3 In cases where there is a difference of opinion as to the value of any stage, the Authority’s Engineer’s view shall prevail and interim payments shall be made to the Contractor on this basis; provided that the foregoing shall be without prejudice to the Contractor’s right to raise a Dispute. 19.5.4 The Authority’s Engineer may, for reasons to be recorded, withhold from payment: (a) the estimated value of work or obligation that the Contractor has failed to perform in accordance with this Agreement and the Authority’s Engineer had notified the Contractor; and (b) the estimated cost of rectification of work done being not in accordance with this Agreement. 19.5.5 Payment by the Authority shall not be deemed to indicate the Authority's acceptance, approval, consent or satisfaction with the work done.

Appears in 27 contracts

Samples: Draft Contract Agreement, Draft Contract Agreement (Dca), Draft Contract Agreement

AutoNDA by SimpleDocs

Stage Payment for Works. 19.5.1 (i) Within 10 (ten) days of receipt of the Stage Payment Statement from the Contractor pursuant to Clause 19.4, the Authority’s Engineer shall broadly determine the amount due to the Contractor and recommend the release of 90 (ninety) percent of the amount so determined as part payment against the Stage Payment Statement, pending issue of the Interim Payment Certificate by the Authority’s Engineer. Within 10 (ten) days of the receipt of recommendation of the Authority’s Engineer, the Authority shall make electronic payment directly to the Contractor’s bank account. 19.5.2 (ii) Within 15 (fifteen) days of the receipt of the Stage Payment Statement referred to in Clause 19.4, the Authority’s Engineer shall determine and shall deliver to the Authority and the Contractor an IPC certifying the amount due and payable to the Contractor, after adjusting the payments already released to the Contractor against the said statement. For the avoidance of doubt, the Parties agree that the IPC shall specify all the amounts that have been deducted from the Stage Payment Statement and the reasons therefor. 19.5.3 (iii) In cases where there is a difference of opinion as to the value of any stage, the Authority’s Engineer’s view shall prevail and interim payments shall be made to the Contractor on this basis; provided that the foregoing shall be without prejudice to the Contractor’s right to raise a Dispute. 19.5.4 (iv) The Authority’s Engineer may, for reasons to be recorded, withhold from payment: (a) the estimated value of work or obligation that the Contractor has failed to perform in accordance with this Agreement and the Authority’s Engineer had notified the Contractor; and (b) the estimated cost of rectification of work done being not in accordance with this Agreement. 19.5.5 (v) Payment by the Authority shall not be deemed to indicate the Authority's acceptance, approval, consent or satisfaction with the work done.

Appears in 9 contracts

Samples: Engineering Procurement and Construction (Epc) Agreement, Engineering Procurement and Construction (Epc) Agreement, Engineering Procurement and Construction (Epc) Contract

Stage Payment for Works. 19.5.1 17.5.1 Within 10 (ten) days of receipt of the Stage Payment Statement from the Contractor pursuant to Clause 19.417.4, the Authority’s Authority Engineer shall broadly determine the amount due to the Contractor and recommend the release of 90 80 (ninety) percent eighty)percent of the amount so determined as part payment against the Stage Payment Statement, pending issue of the Interim Payment Certificate (IPC) by the Authority’s Authority Engineer. Within 10 (ten5(five) days of the receipt of recommendation of the Authority’s EngineerAuthority Engineer as above, the Authority shall make electronic payment directly to the Contractor’s bank account. 19.5.2 17.5.2 Within 15 20 (fifteentwenty) days of the receipt of the Stage Payment Statement referred to in Clause 19.417.4, the Authority’s Authority Engineer shall determine and shall deliver to the Authority and the Contractor an IPC certifying the amount due and payable to the Contractor, after adjusting the payments already released to the Contractor against the said statement. For the avoidance of doubt, the Parties agree that the IPC shall specify all the amounts that have been deducted from the Stage Payment Statement and the reasons therefor. 19.5.3 17.5.3 In cases where there is a difference of opinion as to the value of any stage, the Authority’s Engineer’s view opinion of the Authority Engineer shall prevail and interim payments shall be made to the Contractor on this basis; provided that the foregoing shall be without prejudice to the Contractor’s right to raise a Dispute. 19.5.4 17.5.4 The Authority’s Authority Engineer may, for reasons to be recorded, withhold from payment: (a) the estimated value of work or obligation that the Contractor has failed to perform in accordance with this Agreement and in respect of which the Authority’s Authority Engineer had notified the Contractor; and (b) the estimated cost of rectification of work done being any Works which have not been constructed in accordance with this Agreement. 19.5.5 17.5.5 Payment by the Authority shall not be deemed to indicate the Authority's Authority acceptance, approval, consent or satisfaction with the work done. 17.5.6 In the event the amounts released by the Authority under Clause 17.5.1 exceed the amount finally determined by the Authority Engineer pursuant to Clauses 17.5.2 to 17.5.4, the difference thereof shall be accounted for in the next IPC.

Appears in 7 contracts

Samples: Standard Engineering, Procurement and Construction (Epc) Agreement, Standard Engineering, Procurement and Construction (Epc) Agreement, Standard Engineering, Procurement and Construction (Epc) Agreement

Stage Payment for Works. 19.5.1 Within 10 (ten) days of receipt of the Stage Payment Statement from the Contractor pursuant to Clause 19.4, the Authority’s Authority‟s Engineer shall broadly determine the amount due to the Contractor and recommend the release of 90 (ninety) percent of the amount so determined as part payment against the Stage Payment Statement, pending issue of the Interim Payment Certificate by the Authority’s Authority‟s Engineer. Within 10 (ten) days of the receipt of recommendation of the Authority’s Authority‟s Engineer, the Authority shall make electronic payment directly to the Contractor’s Contractor‟s bank account. 19.5.2 Within 15 (fifteen) days of the receipt of the Stage Payment Statement referred to in Clause 19.4, the Authority’s Authority‟s Engineer shall determine and shall deliver to the Authority and the Contractor an IPC certifying the amount due and payable to the Contractor, after adjusting the payments already released to the Contractor against the said statement. For the avoidance of doubt, the Parties agree that the IPC shall specify all the amounts that have been deducted from the Stage Payment Statement and the reasons therefor. 19.5.3 In cases where there is a difference of opinion as to the value of any stage, the Authority’s Engineer’s Authority‟s Engineer‟s view shall prevail and interim payments shall be made to the Contractor on this basis; provided that the foregoing shall be without prejudice to the Contractor’s Contractor‟s right to raise a Dispute. 19.5.4 The Authority’s Authority‟s Engineer may, for reasons to be recorded, withhold from payment: (a) the estimated value of work or obligation that the Contractor has failed to perform in accordance with this Agreement and the Authority’s Authority‟s Engineer had notified the Contractor; and (b) the estimated cost of rectification of work done being not in accordance with this Agreement. 19.5.5 Payment by the Authority shall not be deemed to indicate the Authority's acceptance, approval, consent or satisfaction with the work done.

Appears in 6 contracts

Samples: Epc Agreement, Construction Contract, Epc Agreement

Stage Payment for Works. 19.5.1 17.5.1 Within 10 (ten) days of receipt of the Stage Payment Statement from the Contractor pursuant to Clause 19.417.4, the Authority’s Engineer shall broadly determine the amount due to the Contractor and recommend the release of 90 (ninety) percent per cent of the amount so determined as part payment against the Stage Payment Statement, pending issue of the Interim Payment Certificate by the Authority’s Engineer. Within 10 (ten) days of the receipt of recommendation of the Authority’s Engineer, the Authority shall make electronic payment directly to the Contractor’s bank account. 19.5.2 17.5.2 Within 15 (fifteen) days of the receipt of the Stage Payment Statement referred to in Clause 19.417.4, the Authority’s Engineer shall determine and shall deliver to the Authority and the Contractor an IPC certifying the amount due and payable to the Contractor, after adjusting the payments already released to the Contractor against the said statement. For the avoidance of doubt, the Parties agree that the IPC shall specify all the amounts that have been deducted from the Stage Payment Statement and the reasons therefor. 19.5.3 17.5.3 In cases where there is a difference of opinion as to the value of any stage, the opinion of the Authority’s Engineer’s view Engineer shall prevail and interim payments shall be made to the Contractor on this basis; provided that the foregoing shall be without prejudice to the Contractor’s right to raise a Dispute. 19.5.4 17.5.4 The Authority’s Engineer may, for reasons to be recorded, withhold from payment: (a) the estimated value of work or obligation that the Contractor has failed to perform in accordance with this Agreement and in respect of which the Authority’s Engineer had notified the Contractor; and (b) the estimated cost of rectification of work done being any Works which have not been constructed in accordance with this Agreement. 19.5.5 17.5.5 Payment by the Authority shall not be deemed to indicate the Authority's acceptance, approval, consent or satisfaction with the work done. 17.5.6 In the event the amounts released by the Authority under Clause 17.5.1 exceed the amount finally determined by the Authority’s Engineer pursuant to Clauses 17.5.2 to 17.5.4, the difference thereof shall be accounted for in the next IPC.

Appears in 4 contracts

Samples: Standard Engineering, Procurement and Construction (Epc) Agreement for Railway Projects, Standard Engineering, Procurement and Construction (Epc) Agreement for Railway Projects, Standard Engineering, Procurement and Construction (Epc) Agreement for Railway Projects

Stage Payment for Works. 19.5.1 Within 10 (ten) days of receipt of the Stage Payment Statement from the Contractor pursuant to Clause 19.4, the Authority’s Engineer shall broadly determine the amount due to the Contractor and recommend the release of 90 (ninety) percent of the amount so determined as part payment against the Stage Payment Statement, pending issue of the Interim Payment Certificate by the Authority’s Engineer. Within 10 (ten) days of the receipt of recommendation of the Authority’s Engineer, the Authority shall make electronic payment directly to the Contractor’s bank account.. 71 19.5.2 Within 15 (fifteen) days of the receipt of the Stage Payment Statement referred to in Clause 19.4, the Authority’s Engineer shall determine and shall deliver to the Authority and the Contractor an IPC certifying the amount due and payable to the Contractor, after adjusting the payments already released to the Contractor against the said statement. For the avoidance of doubt, the Parties agree that the IPC shall specify all the amounts that have been deducted from the Stage Payment Statement and the reasons therefor. 19.5.3 In cases where there is a difference of opinion as to the value of any stage, the Authority’s Engineer’s view shall prevail and interim payments shall be made to the Contractor on this basis; provided that the foregoing shall be without prejudice to the Contractor’s right to raise a Dispute. 19.5.4 The Authority’s Engineer may, for reasons to be recorded, withhold from payment: (a) the estimated value of work or obligation that the Contractor has failed to perform in accordance with this Agreement and the Authority’s Engineer had notified the Contractor; and (b) the estimated cost of rectification of work done being not in accordance with this Agreement. 19.5.5 Payment by the Authority shall not be deemed to indicate the Authority's acceptance, approval, consent or satisfaction with the work done.

Appears in 2 contracts

Samples: Draft Contract Agreement, Contract Agreement

Stage Payment for Works. 19.5.1 Within 10 (ten) days of receipt of the Stage Payment Statement from the Contractor pursuant to Clause 19.4, the Authority’s Engineer shall broadly determine the amount due to the Contractor and recommend the release of 90 (ninety) percent of the amount so determined as part payment against the Stage Payment Statement, pending issue of the Interim Payment Certificate by the Authority’s Engineer. Within 10 (ten) days of the receipt of recommendation of the Authority’s Engineer, the Authority shall make electronic payment directly to the Contractor’s bank account. 19.5.2 Within 15 (fifteen) days of the receipt of the Stage Payment Statement referred to in Clause 19.4, the Authority’s Engineer shall determine and shall deliver to the Authority and the Contractor an IPC certifying the amount due and payable to the Contractor, after adjusting the payments already released to the Contractor against the said statement. For the avoidance of doubt, the Parties agree that the IPC shall specify all the amounts that have been deducted from the Stage Payment Statement and the reasons therefor. 19.5.3 In cases where there is a difference of opinion as to the value of any stage, the Authority’s Engineer’s view shall prevail and interim payments shall be made to the Contractor on this basis; provided that the foregoing shall be without prejudice to the Contractor’s right to raise a Dispute. 19.5.4 . The Authority’s Engineer may, for reasons to be recorded, withhold from payment: (a) the The estimated value of work or obligation that the Contractor has failed to perform in accordance with this Agreement and the Authority’s Engineer had notified the Contractor; and (b) the The estimated cost of rectification of work done being not in accordance with this Agreement. 19.5.5 Payment by the Authority shall not be deemed to indicate the Authority's acceptance, approval, consent or satisfaction with the work done.

Appears in 2 contracts

Samples: Contract Agreement, Contract Agreement

Stage Payment for Works. 19.5.1 (i) Within 10 (ten) days of receipt of the Stage Payment Statement from the Contractor pursuant to Clause 19.4, the Authority’s Engineer shall broadly determine the amount due to the Contractor and recommend the release of 90 (ninety) percent of the amount so determined as part payment against the Stage Payment Statement, pending issue of the Interim Payment Certificate by the Authority’s Engineer. Within 10 (ten) days ten)days of the receipt of recommendation of the Authority’s Engineer, the Authority shall make electronic payment directly to the Contractor’s bank account. 19.5.2 (ii) Within 15 (fifteen) days of the receipt of the Stage Payment Statement referred to in Clause 19.4, the Authority’s Engineer shall determine and shall deliver to the Authority and the Contractor an IPC certifying the amount due and payable to the Contractor, after adjusting the payments already released to the Contractor against the said statementStatement. For the avoidance of doubt, the Parties agree that the IPC shall specify all the amounts that have been deducted from the Stage Payment Statement and the reasons therefor. 19.5.3 (iii) In cases where there is a difference of opinion as to the value of any stage, the Authority’s Engineer’s view shall prevail and interim payments shall be made to the Contractor on this basis; provided that the foregoing shall be without prejudice to the Contractor’s right to raise a Dispute. 19.5.4 (iv) The Authority’s Engineer may, for reasons to be recorded, withhold from payment: (a) the estimated value of work or obligation that the Contractor has failed to perform in accordance with this Agreement and the Authority’s Engineer had notified the Contractor; and (b) the estimated cost of rectification of work done being not in accordance with this Agreement. 19.5.5 (v) Payment by the Authority shall not be deemed to indicate the Authority's acceptance, approval, consent or satisfaction with the work done.

Appears in 2 contracts

Samples: Construction Contract, Construction Contract

Stage Payment for Works. 19.5.1 (i) Within 10 (ten) days of receipt of the Stage Payment Statement from the Contractor pursuant to Clause 19.4, the Authority’s 's Engineer shall broadly determine the amount due to the Contractor and recommend the release of 90 (ninety) percent of the amount so determined as part payment against the Stage Payment Statement, pending issue of the Interim Payment Certificate by the Authority’s 's Engineer. Within 10 (ten) days of the receipt of recommendation of the Authority’s 's Engineer, the Authority shall make electronic payment directly to the Contractor’s 's bank account. 19.5.2 (ii) Within 15 (fifteen) days of the receipt of the Stage Payment Statement referred to in Clause 19.4, the Authority’s 's Engineer shall determine and shall deliver to the Authority and the Contractor an IPC certifying the amount due and payable to the Contractor, after adjusting the payments already released to the Contractor against the said statement. For the avoidance of doubt, the Parties agree that the IPC shall specify all the amounts that have been deducted from the Stage Payment Statement and the reasons therefor. 19.5.3 (iii) In cases where there is a difference of opinion as to the value of any stage, the Authority’s 's Engineer’s 's view shall prevail and interim payments shall be made to the Contractor on this basis; provided that the foregoing shall be without prejudice to the Contractor’s 's right to raise a Dispute. 19.5.4 (iv) The Authority’s 's Engineer may, for reasons to be recorded, withhold from payment: (a) the estimated value of work or obligation that the Contractor has failed to perform in accordance with this Agreement and the Authority’s 's Engineer had notified the Contractor; and (b) the estimated cost of rectification of work done being not in accordance with this Agreement. 19.5.5 (v) Payment by the Authority shall not be deemed to indicate the Authority's acceptance, approval, consent or satisfaction with the work done.

Appears in 2 contracts

Samples: Construction Contract, Construction Contract

Stage Payment for Works. 19.5.1 17.5.1 Within 10 (ten) days of receipt of the Stage Payment Statement from the Contractor pursuant to Clause 19.417.4, the Authority’s Engineer shall broadly determine the amount due to the Contractor and recommend the release of 90 90% (ninetyninety per cent) percent of the amount so determined as part payment against the Stage Payment Statement, pending issue of the Interim Payment Certificate by the Authority’s Engineer. Within 10 (ten) days of the receipt of recommendation of the Authority’s Engineer, the Authority shall make an electronic payment thereof directly to the Contractor’s bank account. 19.5.2 17.5.2 Within 15 (fifteen) days of the receipt of the Stage Payment Statement referred to in Clause 19.417.4, the Authority’s Engineer shall determine and shall deliver to the Authority and the Contractor Contractor, an IPC certifying the amount due and payable to the Contractor, after adjusting the payments already released to the Contractor against the said statement. For the avoidance of doubt, the Parties agree that the IPC shall specify all the amounts that have been deducted from the Stage Payment Statement and the reasons therefor. 19.5.3 17.5.3 In cases where there is a difference of opinion as to the value of any stage, the opinion of the Authority’s Engineer’s view Engineer shall prevail and interim payments shall be made to the Contractor on this that basis; provided that the foregoing shall be without prejudice to the Contractor’s right to raise a Dispute. 19.5.4 17.5.4 The Authority’s Engineer may, for reasons to be recorded, withhold from payment: (a) the estimated value of work or obligation that the Contractor has failed to perform in accordance with this Agreement and in respect of which the Authority’s Engineer had notified the Contractor; and (b) the estimated cost of rectification of work done being any Works which have not been constructed in accordance with this Agreement. 19.5.5 17.5.5 Payment by the Authority hereunder shall be deemed to be provisional and shall not be deemed to indicate construed as the Authority's acceptance, approval, consent or satisfaction with the work done. 17.5.6 In the event the amounts released by the Authority under Clause 17.5.1 exceed the amount finally determined by the Authority’s Engineer pursuant to Clauses 17.5.2 to 17.5.4, the difference thereof shall be accounted for in the next IPC.

Appears in 2 contracts

Samples: Engineering, Procurement and Construction Agreement, Engineering, Procurement and Construction Agreement

Stage Payment for Works. 19.5.1 (i) Within 10 (ten) days of receipt of the Stage Payment Statement from the Contractor pursuant to under Clause 19.4, the Authority’s Engineer shall broadly determine the amount due to the Contractor and recommend the release of 90 (ninety) percent of the amount so determined as part payment against the Stage Payment Statement, pending issue of the Interim Payment Certificate by the Authority’s Engineer. Within 10 (ten) days of the receipt of the recommendation of the Authority’s Engineer, the Authority shall make electronic payment directly to the Contractor’s bank account. 19.5.2 (ii) Within 15 (fifteen) days of the receipt of the Stage Payment Statement referred to in Clause 19.4, the Authority’s Engineer shall determine and shall deliver to the Authority and the Contractor an IPC certifying the amount due and payable to the Contractor, after adjusting the payments already released to the Contractor against the said statement. For the avoidance of doubt, the Parties agree that the IPC shall specify all the amounts that have been deducted from the Stage Payment Statement and the reasons therefortherefore. 19.5.3 (iii) In cases where there is a difference of opinion as to the value of any stage, the Authority’s Engineer’s view shall prevail and interim payments shall be made to the Contractor on this basis; provided that the foregoing shall be without prejudice to the Contractor’s right to raise a Dispute. 19.5.4 (iv) The Authority’s Engineer may, for reasons to be recorded, withhold from payment: (a) the estimated value of work or obligation that the Contractor has failed to perform in accordance with under this Agreement and the Authority’s Engineer had notified the Contractor; and (b) the estimated cost of rectification of work done being is not in accordance with under this Agreement. 19.5.5 (v) Payment by the Authority shall not be deemed to indicate the Authority's acceptance, approval, consent consent, or satisfaction with the work done.

Appears in 1 contract

Samples: Engineering Procurement and Construction (Epc) Agreement

Stage Payment for Works. 19.5.1 Within 10 (ten) days of receipt of the Stage Payment Statement from the Contractor pursuant to Clause 19.4, the Authority’s Engineer shall broadly determine the amount due to the Contractor and recommend the release of 90 (ninety) percent of the amount so determined as part payment against the Stage Payment Statement, pending issue of the Interim Payment Certificate by the Authority’s Engineer. Within 10 (ten) days of the receipt of recommendation of the Authority’s Engineer, the Authority shall make electronic payment directly to the Contractor’s bank account. 19.5.2 Within 15 (fifteen) days of the receipt of the Stage Payment Statement referred to in Clause 19.4, the Authority’s Engineer shall determine and shall deliver to the Authority and the Contractor an IPC certifying the amount due and payable to the Contractor, after adjusting the payments already released to the Contractor against the said statement. For the avoidance of doubt, the Parties agree that the IPC shall specify all the amounts that have been deducted from the Stage Payment Statement and the reasons therefor. 19.5.3 In cases where there is a difference of opinion as to the value of any stage, the Authority’s Engineer’s view shall prevail and interim payments shall be made to the Contractor on this basis; provided that the foregoing shall be without prejudice to the Contractor’s right to raise a Dispute. 19.5.4 The Authority’s Engineer may, for reasons to be recorded, withhold from payment: (a) the estimated value of work or obligation that the Contractor has failed to perform in accordance with this Agreement and the Authority’s Engineer had notified the Contractor; and (b) the estimated cost of rectification of work done being not in accordance with this Agreement. 19.5.5 Payment by the Authority shall not be deemed to indicate the Authority's acceptance, approval, consent or satisfaction with the work done.

Appears in 1 contract

Samples: Draft Agreement for RFP for Beautification of Streets

Stage Payment for Works. 19.5.1 Within 10 (ten) days of receipt of the Stage Payment Statement from the Contractor pursuant to Clause 19.4, the Authority’s AUTHORITY’S/GMDAs Engineer shall broadly determine the amount due to the Contractor and recommend the release of 90 (ninety) percent of the amount so determined as part payment against the Stage Payment Statement, pending issue of the Interim Payment Certificate by the Authority’s AUTHORITY’S/GMDAs Engineer. Within 10 (ten) days of the receipt of recommendation of the Authority’s AUTHORITY’S/GMDAs Engineer, the Authority Authority/GMDA shall make electronic payment directly to the Contractor’s bank account. 19.5.2 Within 15 (fifteen) days of the receipt of the Stage Payment Statement referred to in Clause 19.4, the Authority’s AUTHORITY’S/GMDAs Engineer shall determine and shall deliver to the Authority Authority/GMDA and the Contractor an IPC certifying the amount due and payable to the Contractor, after adjusting the payments already released to the Contractor against the said statement. For the avoidance of doubt, the Parties agree that the IPC shall specify all the amounts that have been deducted from the Stage Payment Statement and the reasons therefortherefore. 19.5.3 In cases where there is a difference of opinion as to the value of any stage, the Authority’s AUTHORITY’S/GMDAs Engineer’s view shall prevail and interim payments shall be made to the Contractor on this basis; provided that the foregoing shall be without prejudice to the Contractor’s right to raise a Dispute. 19.5.4 The Authority’s Engineer may, for reasons to be recorded, withhold from payment: (a) the estimated value of work or obligation that the Contractor has failed to perform in accordance with this Agreement and the Authority’s Engineer had notified the Contractor; and (b) the estimated cost of rectification of work done being not in accordance with this Agreement. 19.5.5 Payment by the Authority shall not be deemed to indicate the Authority's acceptance, approval, consent or satisfaction with the work done.

Appears in 1 contract

Samples: Engineering Procurement and Construction Agreement

Stage Payment for Works. 19.5.1 17.5.1 Within 10 (ten) days of receipt of the Stage Payment Statement from the Contractor pursuant to Clause 19.417.4, the Authority’s Authority Engineer shall broadly determine the amount due to the Contractor and recommend the release of 90 80 (ninetyeighty) percent per cent of the amount so determined as part payment against the Stage Payment Statement, pending issue of the Interim Payment Certificate (IPC) by the Authority’s Authority Engineer. Within 10 5 (tenfive) days of the receipt of recommendation of the Authority’s EngineerAuthority Engineer as above, the Authority shall make electronic payment directly to the Contractor’s bank account. 19.5.2 17.5.2 Within 15 20 (fifteentwenty) days of the receipt of the Stage Payment Statement referred to in Clause 19.417.4, the Authority’s Authority Engineer shall determine and shall deliver to the Authority and the Contractor an IPC certifying the amount due and payable to the Contractor, after adjusting the payments already released to the Contractor against the said statement. For the avoidance of doubt, the Parties agree that the IPC shall specify all the amounts that have been deducted from the Stage Payment Statement and the reasons thereforthere of. 19.5.3 17.5.3 In cases where there is a difference of opinion as to the value of any stage, the Authority’s Engineer’s view opinion of the Authority Engineer shall prevail and interim payments shall be made to the Contractor on this basis; provided that the foregoing shall be without prejudice to the Contractor’s right to raise a Dispute. 19.5.4 17.5.4 The Authority’s Authority Engineer may, for reasons to be recorded, withhold from payment: (a) the estimated value of work or obligation that the Contractor has failed to perform in accordance with this Agreement and in respect of which the Authority’s Authority Engineer had notified the Contractor; and (b) the estimated cost of rectification of work done being any Works which have not been constructed in accordance with this Agreement. 19.5.5 17.5.5 Payment by the Authority shall not be deemed to indicate the Authority's Authority acceptance, approval, consent or satisfaction with the work done. 17.5.6 In the event the amounts released by the Authority under Clause 17.5.1 exceed the amount finally determined by the Authority Engineer pursuant to Clauses 17.5.2 to 17.5.4, the difference thereof shall be accounted for in the next IPC.

Appears in 1 contract

Samples: Epc Agreement

Stage Payment for Works. 19.5.1 Within 10 (ten) days of receipt of the Stage Payment Statement from the Contractor pursuant to Clause 19.4, the Authority’s Engineer shall broadly determine the amount due to the Contractor and recommend the release of 90 (ninety) percent of the amount so determined as part payment against the Stage Payment Statement, pending issue of the Interim Payment Certificate by the Authority’s Engineer. Within 10 (ten) days of the receipt of recommendation of the Authority’s Engineer, the Authority shall make electronic payment directly to the Contractor’s bank account. 19.5.2 Within 15 (fifteen) days of the receipt of the Stage Payment Statement referred to in Clause 19.4, the Authority’s Engineer shall determine and shall deliver to the Authority and the Contractor an IPC certifying the amount due and payable to the Contractor, after adjusting the payments already released to the Contractor against the said statement. For the avoidance of doubt, the Parties agree that the IPC shall specify all the amounts that have been deducted from the Stage Payment Statement and the reasons therefor. 19.5.3 In cases where there is a difference of opinion as to the value of any stage, the Authority’s Engineer’s view shall prevail and interim payments shall be made to the Contractor on this basis; provided that the foregoing shall be without prejudice to the Contractor’s right to raise a Dispute. 19.5.4 The Authority’s Engineer may, for reasons to be recorded, withhold from payment: (a) the estimated value of work or obligation that the Contractor has failed to perform in accordance with this Agreement and the Authority’s Engineer had notified the Contractor; and (b) the estimated cost of rectification of work done being not in accordance with this Agreement. 19.5.5 Payment by the Authority shall not be deemed to indicate the Authority's acceptance, approval, consent or satisfaction with the work done.. 19.6 Deleted‌ 19.7 Deleted‌

Appears in 1 contract

Samples: Construction Contract

AutoNDA by SimpleDocs

Stage Payment for Works. 19.5.1 Within 10 (ten) days of receipt of the Stage Payment Statement from the Contractor pursuant to Clause 19.4, the Authority’s Engineer shall broadly determine the amount due to the Contractor and recommend the release of 90 (ninety) percent of the amount so determined as part payment against the Stage Payment Statement, pending issue of the Interim Payment Certificate by the Authority’s Engineer. Within 10 (ten) days of the receipt of recommendation of the Authority’s Engineer, the Authority shall make electronic payment directly to the Contractor’s bank account. 19.5.2 Within 15 (fifteen) days of the receipt of the Stage Payment Statement referred to in Clause 19.4, the Authority’s Engineer shall determine and shall deliver to the Authority and the Contractor an IPC certifying the amount due and payable to the Contractor, after adjusting the payments already released to the Contractor against the said statement. For the avoidance of doubt, the Parties agree that the IPC shall specify all the amounts that have been deducted from the Stage Payment Statement and the reasons therefor. . 19.5.3 In cases where there is a difference of opinion as to the value of any stage, the Authority’s Engineer’s view shall prevail and interim payments shall be made to the Contractor on this basis; provided that the foregoing shall be without prejudice to the Contractor’s right to raise a Dispute.any 19.5.4 The Authority’s Engineer may, for reasons to be recorded, withhold from payment: (a) the estimated value of work or obligation that the Contractor has failed to perform in accordance with this Agreement and the Authority’s Engineer had notified the Contractor; and (b) the estimated cost of rectification of work done being not in accordance with this Agreement. 19.5.5 Payment by the Authority shall not be deemed to indicate the Authority's acceptance, approval, consent or satisfaction with the work done.

Appears in 1 contract

Samples: Contract Agreement

Stage Payment for Works. 19.5.1 17.5.1 Within 10 (ten) days of receipt of the Stage Payment Statement from the Contractor pursuant to Clause 19.417.4, the Authority’s Authority Engineer shall broadly determine the amount due to the Contractor and recommend the release of 90 80 (ninetyeighty) percent of the amount so determined as part payment against the Stage Payment Statement, pending issue of the Interim Payment Certificate (IPC) by the Authority’s Authority Engineer. Within 10 5 (tenfive) days of the receipt of recommendation of the Authority’s EngineerAuthority Engineer as above, the Authority shall make electronic payment directly to the Contractor’s bank account. 19.5.2 17.5.2 Within 15 20 (fifteentwenty) days of the receipt of the Stage Payment Statement referred to in Clause 19.417.4, the Authority’s Authority Engineer shall determine and shall deliver to the Authority and the Contractor an IPC certifying the amount due and payable to the Contractor, after adjusting the payments already released to the Contractor against the said statement. For the avoidance of doubt, the Parties agree that the IPC shall specify all the amounts that have been deducted from the Stage Payment Statement and the reasons therefor. 19.5.3 17.5.3 In cases where there is a difference of opinion as to the value of any stage, the Authority’s Engineer’s view opinion of the Authority Engineer shall prevail and interim payments shall be made to the Contractor on this basis; provided that the foregoing shall be without prejudice to the Contractor’s right to raise a Dispute. 19.5.4 17.5.4 The Authority’s Authority Engineer may, for reasons to be recorded, withhold from payment: (a) the estimated value of work or obligation that the Contractor has failed to perform in accordance with this Agreement and in respect of which the Authority’s Authority Engineer had notified the Contractor; and (b) the estimated cost of rectification of work done being any Works which have not been constructed in accordance with this Agreement. 19.5.5 17.5.5 Payment by the Authority shall not be deemed to indicate the Authority's Authority acceptance, approval, consent or satisfaction with the work done. 17.5.6 In the event the amounts released by the Authority under Clause 17.5.1 exceed the amount finally determined by the Authority Engineer pursuant to Clauses 17.5.2 to 17.5.4, the difference thereof shall be accounted for in the next IPC.

Appears in 1 contract

Samples: Engineering, Procurement and Construction (Epc) Agreement

Stage Payment for Works. 19.5.1 Within 10 (ten) days of receipt of the Stage Payment Statement from the Contractor pursuant to Clause 19.4, the Authority’s Engineer shall broadly determine the amount due to the Contractor and recommend the release of 90 (ninety) percent of the amount so determined as part payment against the Stage Payment Statement, pending issue of the Interim Payment Certificate by the Authority’s Engineer. Within 10 (ten) days of the receipt of recommendation of the Authority’s Engineer, the Authority shall make electronic payment directly to the Contractor’s bank account. 19.5.2 Within 15 (fifteen) days of the receipt of the Stage Payment Statement referred to in Clause 19.4, the Authority’s Engineer shall determine and shall deliver to the Authority and the Contractor an IPC certifying the amount due and payable to the Contractor, after adjusting the payments already released to the Contractor against the said statement. For the avoidance of doubt, the Parties agree that the IPC shall specify all the amounts that have been deducted from the Stage Payment Statement and the reasons therefor. 19.5.3 In cases where there is a difference of opinion as to the value of any stage, the Authority’s Engineer’s view shall prevail and interim payments shall be made to the Contractor on this basis; provided that the foregoing shall be without prejudice to the Contractor’s right to raise a Dispute. 19.5.4 The Authority’s Engineer may, for reasons to be recorded, withhold from payment: (a) the The estimated value of work or obligation that the Contractor has failed to perform in accordance with this Agreement and the Authority’s Engineer had notified the Contractor; and (b) the The estimated cost of rectification of work done being not in accordance with this Agreement. 19.5.5 Payment by the Authority shall not be deemed to indicate the Authority's acceptance, approval, consent or satisfaction with the work done.

Appears in 1 contract

Samples: Construction Contract

Stage Payment for Works. 19.5.1 (i) Within 10 (ten) days of receipt of the Stage Payment Statement from the Contractor pursuant to Clause 19.4, the Authority’s Engineer shall broadly determine the amount due to the Contractor and recommend the release of 90 (ninety) percent of the amount so determined as part payment against the Stage Payment Statement, pending issue of the Interim Payment Certificate by the Authority’s Engineer. Within 10 (ten) days of the receipt of recommendation of the Authority’s Engineer, the Authority shall make electronic payment directly to the Contractor’s bank account. 19.5.2 (ii) Within 15 (fifteen) days of the receipt of the Stage Payment Statement referred to in Clause 19.4, the Authority’s Engineer shall determine and shall deliver to the Authority and the Contractor an IPC certifying the amount due and payable to the Contractor, after adjusting the payments already released to the Contractor against the said statement. For the avoidance of doubt, the Parties agree that the IPC shall specify all the amounts that have been deducted from the Stage Payment Statement and the reasons therefortherefore. 19.5.3 (iii) In cases where there is a difference of opinion as to the value of any stage, the Authority’s Engineer’s view shall prevail and interim payments shall be made to the Contractor on this basis; provided that the foregoing shall be without prejudice to the Contractor’s right to raise a Dispute. 19.5.4 (iv) The Authority’s Engineer may, for reasons to be recorded, withhold from payment: (a) the estimated value of work or obligation that the Contractor has failed to perform in accordance with this Agreement and the Authority’s Engineer had notified the Contractor; and (b) the estimated cost of rectification of work done being not in accordance with this Agreement. 19.5.5 (v) Payment by the Authority shall not be deemed to indicate the Authority's acceptance, approval, consent or satisfaction with the work done. (vi) Goods & Service Tax (GST) shall be paid to the Contractor along with the stage payment at prevailing rate, however, the Contractor has to submit the proof of deposited GST against their work to the Govt. at the time of submitting next stage payment request failing which the earlier paid GST will be deducted.

Appears in 1 contract

Samples: Engineering Procurement and Construction (Epc) Contract

Stage Payment for Works. 19.5.1 Within 10 15 (tenfifteen) days of receipt of the Stage Payment Statement from the Contractor pursuant to Clause 19.4, the Authority’s Authority‟s Engineer shall broadly determine the amount due to the Contractor and recommend the release of 90 (ninety) percent of the amount so determined as part payment against the Stage Payment Statement, pending issue of the Interim Payment Certificate by the Authority’s Authority‟s Engineer. Within 10 15 (tenfifteen) days of the receipt of recommendation of the Authority’s Authority‟s Engineer, the Authority shall make electronic payment directly to the Contractor’s Contractor‟s bank account. 19.5.2 Within 15 30 (fifteenthirty) days of the receipt of the Stage Payment Statement referred to in Clause 19.4, the Authority’s Authority‟s Engineer shall determine and shall deliver to the Authority and the Contractor an IPC certifying the amount due and payable to the Contractor, after adjusting the payments already released to the Contractor against the said statement. For the avoidance of doubt, the Parties agree that the IPC shall specify all the amounts that have been deducted from the Stage Payment Statement and the reasons therefortherefore. 19.5.3 In cases where there is a difference of opinion as to the value of any stage, the Authority’s Engineer’s Authority‟s Engineer‟s view shall prevail and interim payments shall be made to the Contractor on this basis; provided that the foregoing shall be without prejudice to the Contractor’s Contractor‟s right to raise a Dispute. 19.5.4 The Authority’s Authority‟s Engineer may, for reasons to be recorded, withhold from payment: (a) the estimated value of work or obligation that the Contractor has failed to perform in accordance with this Agreement and the Authority’s Authority‟s Engineer had notified the Contractor; and (b) the estimated cost of rectification of work done being not in accordance with this Agreement. 19.5.5 Payment by the Authority shall not be deemed to indicate the Authority's acceptance, approval, consent or satisfaction with the work done.

Appears in 1 contract

Samples: Engineering, Procurement and Construction Agreement

Stage Payment for Works. 19.5.1 17.5.1 Within 10 (ten) days of receipt of the Stage Payment Statement from the Contractor pursuant to Clause 19.417.4, the Authority’s Authority Engineer shall broadly determine the amount due to the Contractor and recommend the release of 90 80 (ninetyeighty) percent of the amount so determined as part payment against the Stage Payment Statement, pending issue of the Interim Payment Certificate (IPC) by the Authority’s Authority Engineer. Within 10 5 (tenfive) days of the receipt of recommendation of the Authority’s EngineerAuthority Engineer as above, the Authority shall make electronic payment directly to the Contractor’s bank account. 19.5.2 17.5.2 Within 15 20 (fifteentwenty) days of the receipt of the Stage Payment Statement referred to in Clause 19.417.4, the Authority’s Authority Engineer shall determine and shall deliver to the Authority and the Contractor an IPC certifying the amount due and payable to the Contractor, after adjusting the payments already released to the Contractor against the said statement. For the avoidance of doubt, the Parties agree that the IPC shall specify all the amounts that have been deducted from the Stage Payment Statement and the reasons thereforthere of. 19.5.3 17.5.3 In cases where there is a difference of opinion as to the value of any stage, the Authority’s Engineer’s view opinion of the Authority Engineer shall prevail and interim payments shall be made to the Contractor on this basis; provided that the foregoing shall be without prejudice to the Contractor’s right to raise a Dispute. 19.5.4 17.5.4 The Authority’s Authority Engineer may, for reasons to be recorded, withhold from payment: (a) the estimated value of work or obligation that the Contractor has failed to perform in accordance with this Agreement and in respect of which the Authority’s Authority Engineer had notified the Contractor; and (b) the estimated cost of rectification of work done being any Works which have not been constructed in accordance with this Agreement. 19.5.5 17.5.5 Payment by the Authority shall not be deemed to indicate the Authority's Authority acceptance, approval, consent or satisfaction with the work done. 17.5.6 In the event the amounts released by the Authority under Clause 17.5.1 exceed the amount finally determined by the Authority Engineer pursuant to Clauses 17.5.2 to 17.5.4, the difference thereof shall be accounted for in the next IPC.

Appears in 1 contract

Samples: Epc Agreement

Stage Payment for Works. 19.5.1 (i) Within 10 (ten) days of receipt of the Stage Payment Statement from the Contractor pursuant to Clause 19.4, the Authority’s Engineer shall broadly determine the amount due to the Contractor and recommend the release of 90 (ninety) percent of the amount so determined as part payment against the Stage Payment Statement, pending issue of the Interim Payment Certificate by the Authority’s Engineer. Within 10 (ten) days of the receipt of recommendation of the Authority’s Engineer, the Authority shall make electronic payment directly to the Contractor’s bank account. 19.5.2 (ii) Within 15 (fifteen) days of the receipt of the Stage Payment Statement referred to in Clause 19.4, the Authority’s Engineer shall determine and shall deliver to the Authority and the Contractor an IPC certifying the amount due and payable to the Contractor, after adjusting the payments already released to the Contractor against the said statement. For the avoidance of doubt, the Parties agree that the IPC shall specify all the amounts that have been deducted from the Stage Payment Statement and the reasons therefortherefore. 19.5.3 (iii) In cases where there is a difference of opinion as to the value of any stage, the Authority’s Engineer’s view shall prevail and interim payments shall be made to the Contractor on this basis; provided that the foregoing shall be without prejudice to the Contractor’s right to raise a Dispute. 19.5.4 (iv) The Authority’s Engineer may, for reasons to be recorded, withhold from payment: (a) the estimated value of work or obligation that the Contractor has failed to perform in accordance with this Agreement and the Authority’s Engineer had notified the Contractor; and (b) the estimated cost of rectification of work done being not in accordance with this Agreement. 19.5.5 (v) Payment by the Authority shall not be deemed to indicate the Authority's acceptance, approval, consent or satisfaction with the work done.

Appears in 1 contract

Samples: Engineering Procurement and Construction (Epc) Contract

Stage Payment for Works. 19.5.1 ‌ (i) Within 10 (ten) days of receipt of the Stage Payment Statement from the Contractor pursuant to Clause 19.4, the Authority’s Engineer shall broadly determine the amount due to the Contractor and recommend the release of 90 (ninety) percent of the amount so determined as part payment against the Stage Payment Statement, pending issue of the Interim Payment Certificate by the Authority’s Engineer. Within 10 (ten) days of the receipt of recommendation of the Authority’s Engineer, the Authority shall make electronic payment directly to the Contractor’s bank account. 19.5.2 (ii) Within 15 (fifteen) days of the receipt of the Stage Payment Statement referred to in Clause 19.4, the Authority’s Engineer shall determine and shall deliver to the Authority and the Contractor an IPC certifying the amount due and payable to the Contractor, after adjusting the payments already released to the Contractor against the said statement. For the avoidance of doubt, the Parties agree that the IPC shall specify all the amounts that have been deducted from the Stage Payment Statement and the reasons therefor. 19.5.3 (iii) In cases where there is a difference of opinion as to the value of any stage, the Authority’s Engineer’s view shall prevail and interim payments shall be made to the Contractor on this basis; provided that the foregoing shall be without prejudice to the Contractor’s right to raise a Dispute. 19.5.4 (iv) The Authority’s Engineer may, for reasons to be recorded, withhold from payment: (a) the estimated value of work or obligation that the Contractor has failed to perform in accordance with this Agreement and the Authority’s Engineer had notified the Contractor; and (b) the estimated cost of rectification of work done being not in accordance with this Agreement. 19.5.5 (v) Payment by the Authority shall not be deemed to indicate the Authority's acceptance, approval, consent or satisfaction with the work done.

Appears in 1 contract

Samples: Engineering Procurement and Construction Agreement

Stage Payment for Works. 19.5.1 (i) Within 10 (ten) days of receipt of the Stage Payment Statement from the Contractor pursuant to Clause 19.4, the Authority’s Engineer shall broadly determine the amount due to the Contractor and recommend the release of 90 (ninety) percent of the amount so determined as part payment against the Stage Payment Statement, pending issue of the Interim Payment Certificate by the Authority’s Engineer. Within 10 (ten) days of the receipt of recommendation of the Authority’s Engineer, the Authority shall make electronic payment directly to the Contractor’s bank accountbankaccount. 19.5.2 (ii) Within 15 (fifteen) days of the receipt of the Stage Payment Statement referred to in Clause 19.4, the Authority’s Engineer shall determine and shall deliver to the Authority and the Contractor an IPC certifying the amount due and payable to the Contractor, after adjusting the payments already released to the Contractor against the said statement. For the avoidance of doubt, the Parties agree that the IPC shall specify all the amounts that have been deducted from the Stage Payment Statement and the reasons therefortherefore. 19.5.3 (iii) In cases where there is a difference of opinion as to the value of any stage, the Authority’s Engineer’s view shall prevail and interim payments shall be made to the Contractor on this basis; provided that the foregoing shall be without prejudice to the Contractor’s right to raise a Dispute. 19.5.4 (iv) The Authority’s Engineer may, for reasons to be recorded, withhold from payment: (a) the estimated value of work or obligation that the Contractor has failed to perform in accordance with this Agreement and the Authority’s Engineer had notified the Contractor; and (b) the estimated cost of rectification of work done being not in accordance with this Agreement. 19.5.5 (v) Payment by the Authority shall not be deemed to indicate the Authority's acceptance, approval, consent or satisfaction with the work done. (vi) Goods & Sevice Tax(GST) Tax (GST) shall be paid to the Contractor along with the stage payment at prevailing rate, however, the Contractor has to submit the proof of deposited GST against their work to the Govt. at the time of submitting next stage payment request failing which the earlier paid GST will be deducted.

Appears in 1 contract

Samples: Contract Agreement