Standard Drawing Sample Clauses

Standard Drawing. Standard Drawing means a Drawing listed in the Schedule HDrawings and Specifications as a standard drawing, as the same may be amended, supplemented or replaced from time to time by the Owner. The City of Toronto’s Standard Drawings can be found on-line at xxx.xxxxxxx.xx/xxx-xxxxxxxxx. Any of the OPS’ Standard Drawings can be acquired from the OPS. Information about OPS can be found at xxx.xxx.xx.xx.
AutoNDA by SimpleDocs
Standard Drawing. L744.2 nominal distance 600-900 mm between inside faces of outer pipe walls; for two pipes nr *** *** *** SEWER AND WATER MAIN REMOVATION AND ANCILLARY WORKS Y900 Allow for carrying out pressure tests and sterilization on the complete water supply pipeline before handing over to WSD item *** *** ------------------------------------------------------------------------------------------------------- To Collection of Lump Sum Item LSI10.1 *** ---------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]
Standard Drawing. Standard Drawing means a Drawing listed in the Schedule HDrawings and Specifications as a standard drawing, as the same may be amended, supplemented or replaced from time to time by the Owner. Exhibition Place’s Standard Drawings can be found on-line at xxx.xxxxxxx.xx/xxx-xxxxxxxxx. Any of the OPS’ Standard Drawings can be acquired from the OPS. Information about OPS can be found at xxx.xxx.xx.xx.
Standard Drawing. L744.3 nominal distance 600-900 mm between inside faces of outer pipe walls; for two pipes nr *** *** *** Concrete stools and thrust blocks; in utility troughs Volume 0.1-0.2 m3; reinforced concrete grade 35/20D L723 nominal distance 300-600 mm between inside faces of outer pipe walls; for two pipes nr *** *** *** SEWER AND WATER MAIN REMOVATION AND ANCILLARY WORKS Y900 Allow for carrying out pressure tests and sterilization on the complete water supply pipeline before handing over to WSD item *** ------------------------------------------------------------------------------------------------------- To Collection of Lump Sum Item LSI2.2 *** ---------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]

Related to Standard Drawing

  • Construction Drawings After approving the Additional Programming Information, Landlord shall cause the Architect and the Engineers to prepare and deliver to Tenant Construction Drawings that conform to the approved Space Plan and the approved Additional Programming Information. Such preparation and delivery shall occur within 15 business days after the later of Landlord’s approval of the Additional Programming Information or the mutual execution and delivery of this Agreement. Tenant shall approve or disapprove the Construction Drawings by notice to Landlord. If Tenant disapproves the Construction Drawings, Tenant’s notice of disapproval shall specify any revisions Tenant desires in the Construction Drawings. After receiving such notice of disapproval, Landlord shall cause the Architect and/or the Engineers to revise the Construction Drawings, taking into account the reasons for Tenant’s disapproval (provided, however, that Landlord shall not be required to cause the Architect or the Engineers to make any revision to the Construction Drawings that is inconsistent with the Landlord Requirements or that Landlord otherwise reasonably disapproves), and resubmit the Construction Drawings to Tenant for its approval. Such revision and resubmission shall occur within five (5) business days after the later of Landlord’s receipt of Tenant’s notice of disapproval or the mutual execution and delivery of this Agreement if such revision is not material, and within such longer period of time as may be reasonably necessary (but not more than 15 business days after the later of such receipt or such mutual execution and delivery) if such revision is material. Such procedure shall be repeated as necessary until Tenant has approved the Construction Drawings. The Construction Drawings approved by Landlord and Tenant are referred to in this Work Letter as the “Approved Construction Drawings”.

Time is Money Join Law Insider Premium to draft better contracts faster.