Stockpile Location Sample Clauses

Stockpile Location. Welchers Pit 1 ¼ Inch Minus 500 Welchers Pit
Stockpile Location. Marble Pit 1½-INCH MINUS CRUSHED 1000 14+78 of PH-5220 1000 66+31 of PH-5000 Rock stockpiles listed in Clause 6-65 ROCK STOCKPILE LOCATION must meet the following specifications: Before placing aggregates upon the stockpile site, the site must be cleared of vegetation, trees, stumps, brush, rocks, or other debris and the ground leveled to a smooth, firm, uniform surface. When completed, the stockpile must be neat and regular in shape. The stockpile height is limited to a maximum of 24 feet. Stockpiles in excess of 200 cubic yards must be built up in layers of not more than 4 feet deep. Stockpile layers must be constructed by trucks, clamshells, or other methods approved in writing by the Contract Administrator. Each layer must be completed over the entire area of the pile before depositing aggregates in the next layer. The aggregates may not be dumped so that they run down and over the lower layers in the stockpile. The method of dropping from a bucket or spout in one location to form a cone shaped pile is not allowed. Stockpiles of different types or sizes of aggregate must be spaced far enough apart, or separated by suitable walls or partitions, to prevent the mixing of the aggregates.
Stockpile Location. Sirloin PIt 4 inch jaw run rock 4200 Sirloin Pit
Stockpile Location. Timberline Quarry 2-inch minus crushed 3,000 Quarry site – see development plan
Stockpile Location. B.B. Pit 4 inch jaw 3,000 B.B. Pit
Stockpile Location locate stockpile at a distance equal to ten times the pile height from property boundaries that abut residential areas.
Stockpile Location. Harmony Quarry 1 ½” Minus Crushed 1500 Harmony Quarry Rock stockpiles listed in Clause 6−65 ROCK STOCKPILE LOCATION must meet the following specifications: Before placing aggregates upon the stockpile site, the site must be cleared of vegetation, trees, stumps, brush, rocks, or other debris and the ground leveled to a smooth, firm, uniform surface. Stockpiles of different types or sizes of aggregate must be spaced far enough apart, or separated by suitable walls or partitions, to prevent the mixing of the aggregates. When completed, the stockpile must be neat and regular in shape. The stockpile height is limited to a maximum of 20 feet. Stockpiles in excess of 200 cubic yards must be built up in layers of not more than 5 feet deep. Stockpile layers must be constructed by trucks, clamshells, or other methods approved in writing by the Contract Administrator. Each layer must be completed over the entire area of the pile before depositing aggregates in the next layer. The aggregates may not be dumped so that they run down and over the lower layers in the stockpile.
Stockpile Location. ROLLIN ROCK PIT 3-Inch-Minus 500 ROLL PIT
Stockpile Location. P&E Extension Quarry 2 ½ INCH Crushed Rock 1,300 yds P&E Extension Quary
Stockpile Location. 2740 Pit 3” Minus Crushed 2,000 2740 Pit