Storm Water Detention Pond Sample Clauses

Storm Water Detention Pond. The Owner, or its successors or assigns shall perform a minimum of one inspection of the Storm Water Detention Pond per year by a qualified individual, and send the inspection report to the Village Engineer by December 31st of each year detailing the inspection and any maintenance activities that took place. Furthermore, upon notification of the Owner or its successors or assigns by the Village of material maintenance problems which require correction, the specified corrective actions shall be taken within a reasonable time frame as set by the Village.
AutoNDA by SimpleDocs

Related to Storm Water Detention Pond

  • Stormwater Notwithstanding any other provisions or terms of this Agreement, Company acknowledges that certain properties within the Premises or on Authority-owned land are subject to stormwater rules and regulations. Company agrees to observe and abide by such stormwater rules and regulations as may be applicable to the Premises, and, if applicable, Company hereby expressly covenants, warrants, and represents to Authority, in connection with Company’s operations on the Premises, the following:

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Stormwater Management The Owner agrees that stormwater management measures shall be applicable to the development of the Lands, in a manner which is in accordance with the provisions of The Drainage Act, R.S.O. 1990, c.D.17 and amendments thereto, and to the satisfaction of the Municipality's Engineer.

  • Drainage ▪ Prevent silt bearing road surface and ditch runoff from delivering sediment to any streams or wetlands. ▪ Maintain rolling dips and drivable waterbars as needed to keep them functioning as intended. ▪ Maintain headwalls to the road shoulder level with material that will resist erosion. ▪ Maintain energy dissipaters at culvert outlets with non-erodible material or rock. ▪ Keep ditches, culverts, and other drainage structures clear of obstructions and functioning as intended. ▪ Inspect and clean culverts at least monthly, with additional inspections during storms and periods of high runoff. This shall be done even during periods of inactivity. Preventative Maintenance ▪ Perform preventative maintenance work to safeguard against storm damage, such as blading to ensure correct runoff, ditch and culvert cleaning, and waterbar maintenance.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Irrigation Systems The Project Area either has no irrigation system or a low-volume drip irrigation system. If a watering system is used, it is a drip irrigation system equipped with a filter, pressure regulator and emitters rated at twenty (20) gallons per hour (gph) or less. The system is maintained free of leaks and malfunctions. No spray irrigation is applied to the Project Area, including spray from irrigation systems adjacent to the Project Area.

  • Conservation Easement School shall abide by the terms of the Easement, attached as Exhibit “D” and granted by the District to Authority. The Easement shall be recorded against the Subject Property by the Authority, at the Authority’s sole cost and expense. This Easement may be executed and recorded without further approval of the Parties’ governing bodies, except that approval is required to authorize the execution of this Agreement.

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Wastewater i.e. wastewater and storm water collection, treatment and management systems.

  • Vegetation No trees or other vegetation may be removed from the site without prior approval from the Town, except in accordance with Section 4 above and pursuant to the Annual Plan.

Time is Money Join Law Insider Premium to draft better contracts faster.