Stormwater Systems Sample Clauses

Stormwater Systems. The Consultant shall evaluate subsurface conditions in proposed stormwater systems. For stormwater ponds, two auger borings to a depth of 20 feet below the bottom of the proposed pond elevation shall be performed per acre of pond. One field permeability test per acre of pond shall also be provided. One auger boring to a depth of 20 feet shall be performed every 500 feet for exfiltration trenches and treatment xxxxxx. One field permeability test or Double Ring Infiltrometer (DRI) test shall be performed every 500 feet. Two auger borings per acre shall be performed in proposed floodplain compensation areas and mitigation areas to a depth below the proposed lowest elevation in those areas. The Consultant shall provide an analysis of stormwater volume recovery through infiltration or background see page analysis as required.
AutoNDA by SimpleDocs
Stormwater Systems. 2.8.1 Detention / Infiltration Trench
Stormwater Systems 

Related to Stormwater Systems

  • Stormwater Notwithstanding any other provisions or terms of this Agreement, Company acknowledges that certain properties within the Premises or on Authority-owned land are subject to stormwater rules and regulations. Company agrees to observe and abide by such stormwater rules and regulations as may be applicable to the Premises, and, if applicable, Company hereby expressly covenants, warrants, and represents to Authority, in connection with Company’s operations on the Premises, the following:

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Infrastructure (a) The Borrower has and will maintain a sufficient infrastructure to conduct its business as presently conducted and as contemplated to be conducted following its execution of this Agreement.

  • Wastewater i.e. wastewater and storm water collection, treatment and management systems.

  • Drainage ▪ Prevent silt bearing road surface and ditch runoff from delivering sediment to any streams or wetlands. ▪ Maintain rolling dips and drivable waterbars as needed to keep them functioning as intended. ▪ Maintain headwalls to the road shoulder level with material that will resist erosion. ▪ Maintain energy dissipaters at culvert outlets with non-erodible material or rock. ▪ Keep ditches, culverts, and other drainage structures clear of obstructions and functioning as intended. ▪ Inspect and clean culverts at least monthly, with additional inspections during storms and periods of high runoff. This shall be done even during periods of inactivity. Preventative Maintenance ▪ Perform preventative maintenance work to safeguard against storm damage, such as blading to ensure correct runoff, ditch and culvert cleaning, and waterbar maintenance.

  • Roads 16. (1) The Joint Venturers shall —

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!